Notice of Denial of Amends to Licenses DPR-29 & DPR-30 & Opportunity for Hearing.Proposed Amends Would Delete Requirement for Testing Operable Emergency Diesel Generator
ML20209H948
Person / Time
Site: Quad Cities  
Issue date: 01/21/1987
From: Zwolinski J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20209H849 List:
References
NUDOCS 8702060174
Download: ML20209H948 (3)


Text

. -.

7590-01 IlNITED STATES N!! CLEAR REGULATOPY COWISSION COMM0 WEALTH EDISON COMPANY DOCKET NOS. 50-?54 AND 50-265 CCNIAL OF AMENDMENT TO FACILITY OPEDATTNA LICENSF t

AND OPD0DT11NTIY FOR HEADING The !!.S. Nuclear Reculatory,Comission (the Commission) has denied in part a recuest by the licensee for an amendment to Facility Operating License Nos.

DPR-?9 and nPR-30 issued to the Commonwealth Edison Company for operation of the Quad Cities Nuclear Power Station, Units 1 and ? in Rock Island County, Illinois. Motice of consideration of issuance of these amendments was pub-lished in the FFDFDAL REGISTER on Auaust 14, 1985 (50 FR 3?790).

The amendments, as proposed by the licensee, would change Technical Specification 3.9.E.1, for both Units 1 and 2, deleting the requirement for testing the operable Emergency Diesel Generator (EDGi immadiately and daily thereafter when it is determined that either unit EDC or the shared EDG is inoperable. Standard Technical Specifications recuire, as a minimum, testing the operable EDG within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 79 hours9.143519e-4 days <br />0.0219 hours <br />1.306217e-4 weeks <br />3.00595e-5 months <br /> thereafter when the other unit l-diesel is inoperable.

L Althouch NRC staff has detemined that reducing EDG cold fast starts would improve EDG reliability and therefore, the risk of core damage from station blackout events, it was not NRC staff's intent to eliminate completely the L

testing of the remaining EDG when an EDG is declared inoperable. NRC staff intent was only to reduce testina. Therefore, the Commonwealth rdison Company proposed changes were denied.

8702060174 870121 L

DR ADOCK 05000254 PDR

7590-01 All other proposed changes to the Technical Specifications, for both Units 1 and 2, have been approved by Amendment Nos. 99,and 96 Notice of issuance of Amendment Nos.

99 and 96, will be published in the Commission's biweekly FEDERAL REGISTER Notices.

The licensee was notified of the Commission's denial of the proposed technical specification changes by letter dated January 21, 1987.

By March 2,1987 the licensee may demand a hearing with respect to the denial described above and any person whose interest may be affected by this proceeding may file a written petition for leave to intervene.

A reouest for a hearing or petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention: Docketing and Service Branch, or may be delivered to the Commission's Public Document Room, 1717 H Street, NW, Washington, D.C., by the above date.

A copy of any petitions should also be sent to the Office of the General Counsel-Bethesda, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, and to M. I. Miller; Isham, Lincoln & Beale, Three First National Plaza, Suite 5200, Chicago, Illinois 60602.

For further details with respect to this action, see (1) the application for amendment dated June 28, 1985, and (2) the Commission's Safety Evaluation issued with Amendment No. 99 to DPR-29 and Artendment No. 96 to DPR-30, which are available for public inspection at the Commission's Public Document Room, 1717 H Street, NW, Washington, D.C., and at the Moline Public Library, 1

~,:... :...+..,.

~

7590-01 t 50417th Street, Moline, Illinois 61265. A copy of item (2) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention: Director, Division of BWR Licensing.

Dated at Bethesda, Maryland, this 21st day of January,1987.

4 FOR TH NLCLEAR REGUL TOR COMMISSION A*1 John $.Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing il i

o

-