M4 3pF Federal Emergency Management Agency 4
Washington, D.C. 20472 98,
~
JAN 2 l' 1987 A
p 4 G ~)
MEMORANDUM FOR: Edwan! L. Jottlan Ditector Division of Emotwency Prepatedness and Engineering Responso Office of Inspection and Enforcement U. S. Nuclear Regulatoty Cmmission LA
--s FIOM:
R-dv.7tT Assistant Associate Dituctor Office of Natural and Technological Hazards Proqrams Subj ect:
Exorciso Repott of the August 26, 1986, Exerciso of the Illinois Offsite Radiological Emroency Preparedness Plans for the Quad Cities Nuclear Power Station.
'Ihis in to transmit a copy of the Exorcise Report of the Auqust 26, 1986, joint exorciso of the Illinois offaite radiological emoinency prepatedness plans for the Ouad Cition Nuclear Power Station, near Coniova, Rock Island County, Illinois. Participants included the State of Illinois (partial patticipation), Pock Island County (full patticipation), Whiteside County (full) and Camonwealth Edison Co. (full). These two counties are inpacted by the Quad Cities plume exposuro 10-mile EmetT1ency Planning Zono (EPZ).
The dato of the final repott prepatul by the Federal Emotnency Management Agency (FEMA) Reqion V was December 29, 1986. On December 18, 1986, FEMA transmitted to the Nuclear Roqulatory Commission (NRC) the FEMA Roqion VII report on the pottion of the August 26, 1986, oxorciso concett-inq the Iowa Of fsite R.'dioloq1 cal EmotTiency Preparedness Plans for the Ouad Citios Nuclear Pc.or Station.
In the Auqust 26, 1986 oxorcino, for the Illinois portion of the EP2 con-ducted by FEMA Roqlon V, thoro wotu no Defleienclos obsetvedt however, thoro were oight atuas obsotved as requirinq correctivo action. 'Iho Stato of Illinois has reco1ved a copy of the exorciso report and responded Novembor 26, 1986 to tho atmas cited by FEMA as twiuirinq correctivo action. The FEMA Roqion V memorandum of Decomtur 30, 1986 reviewing the Illinois responso is attachal. The proposmi correctivo actions contained in the memorandum atu accaptable to FEMA and will bo evaluatml at tle next biennial oxorcino.
Thotv was nothinq otnoival in this oxorciso that would advetwely affect th7 FEMA approval of the Illinois Of fsito Radioloqical Emorconey Preparod-nons Plans site-nrncific to tho Quad Cities Nucione Ibwor Station under 44 CFR 350.
0702050220 070121 PDR ADOCK 05000254 PDR
}{d SC F
r l
- i l
l If you have any questions, please contact Mr. Robert S. Wilkorson, Chief, Technological Hazanis Division, at 646-2861.
1 i
Attactent i
As Stated l
l l
l l
i l
l I
I l
1 L
) Federal Emergency Management Agency l Region V 300 South Wacker,24th Floor, Chicago, IL 60606(312) 353-1500 DEu 3 3 GE6 MENORANDlH EOR:
Assistant Associate Director j
Office of Natural and Technological Hazards ATTENTION:
Ken Green, SL-NT-TH o
FRCH:
Wallace J. Weaver, Q1 airman Regional Assistance Comnittee SUBJECf:
Quad Cities Final Exercise Report and the State of Illinois Schedule of Corrective Action D1 closed is a copy of the schedule of corrective action fran the State of Illinois for the exercise weaknesses identified during the August 26, 1986 Quad Cities REP joint exercise. Mie schedule of corrective action has been reviewed by the office and found to be adequate to correct the weaknesses identified during the exorcise. A copy of our response to the State of Illinois is also enclosed.
The draft exercise report was revised to reflect comments received from various sources during the consultation and review proces. A copy of the final exercise report is enclosed. We reconnend that you transmit the final exercise report and schedule of corrective action to NRC.
Enclosures
un Green
\\
\\
1 DEC 3 0 906 Mr. David L. eiith Odef, Field Services Illinois energency services and Disaster Agency las East Adags street j
springfield, Illinois 62796 Dear Mr. amith He have reviewed the schedule of corrective action dated Innenber 26, 1986 i
for the esercise weaknesses identified during the August 26, 1986 Quad Cities FE.P joint esercise. Our evaluation of the propoemd corrective j
action is discussed below.
state of Illinois F.1 he installation of the new instrumentation for the Itock Island' County 20C MARS line would appear to have corrected the problem observed during the esercise.
We will evaluate the reliability of the flock Island County EOC NMis line during future exercisss.
state of Illinoist t i
Your proposal to demonstrate notification procedures as appropriate during i
the next biennial exercise is acceptable. %e appropriate sections of the final exercise report have been anen3ed to further clarify the PDtA Pegion V ;osition with respect to this issue. mis office will continue to work with you, the State of Io m and F r.A lbgion VII to resolve this situation
{
to everyone's satisfaction. Our numery of the situation is discussed below.
Se difference in Illinois and Iowa procedures for County notification is the cause of the problem. mis difference in procedures results in the Zeue I
counties receiving notification concurrent with the state of Iowa.
In Illinois, l
the notification is relayed to the Illinois Cbunties by the State. 21s provides j
the State of Illinois with a reasonable period of ansesmaent Wich can be alacet instantaneous or several minutes. Se "15 cinute notification clock" begins when the Cbunties rcccive the notifiention. S us whcn Iown waits for l
Illinois, the Iowa Counties are using part of their 15-einutes.
W e Illinois Counties "clocx" has not yet started.
We criteria in being applied unifor:=ly l
but the variation in procedures caucon tlw Countics to receive their notifica-tion at different ti.es. Our position is that the procedures demnnstrated during the exercises snust bo those idwntified in the plan and vice versa.
t
s Rock Island countys r.1 (2) see connent under state of 1111pois F.1 for evaluation of the first part of these two exercise weaknesses. The proposed corrective action for the second part is acceptable. hhen the transfer of responsibility to the kmk Island county sheriff's Department is co elete, please forward copies of the plan revision for review by this office. He will evaluate the new procedures during the next biennial exercise.
Rock Island County: G.3.a (2) the proposed corrective actions for these tte exercise weaknesses are
~,,
acceptable. We will evaluate those activities during the next biennial exercies.
l Chitestde county: J.19.1 The proposed corrective action is acceptable. Ik will work with you to -
ensure that the scenario for the next biennial exercise will provide an orportunity for Whitesido County to dertonstrate access control for evalue-l tion by the federal observers.
khitesida Ccunty: E.5 the proposed corrective action is acceptable, ik will evaluate this recovery /
reentry activity during the next biennial erercise.
A copy of the final exerciso report is enclosed. Only the cover ;uge, titic l
pago and State of Illinoic Public Alerting and Instruction section have been l
significantly ownded. Please distribute this final exercise report to all noldcrs of thcr draft exercise report provided to you in October.
1ho final exerciac reperc and your schedule of corrective action are baing l
providal to ru3. IQ for transmittal to the 13C. 1% will notify you of Fr"'.A HQ action with n spect to the 44 LTR 354 approval.
Sincerely, l
Is/
Wallace J. tenvor, Gairman It9 onal Asalatance Comittee 1
f i
!.nclosure act C. Wenger A. Crees