ML20209H822
| ML20209H822 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 09/11/1986 |
| From: | Sherwin Turk NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
| To: | Curran D HARMON & WEISS |
| References | |
| CON-#386-682 OL, NUDOCS 8609160014 | |
| Download: ML20209H822 (1) | |
Text
[hb a s 4 a qia - e = -,
SEP 111986 M* #
DOLMEirr USNHC Diane Curran, E'sq.
86 SEP 12 P4 36 Ilarmon & Weiss 2001 S Street, NW OFFICE et nu g p f Suite 430 00CKETING a stpyicy' Washington, DC 20009 BRANCH In the Matter of PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE, et al.
(Seabrook Station, Units 1 and 2)
Docket Nos. 50-443 OL and 50-444 OL Safety and On-Site Emergency Planning Issues
Dear Diane:
This is to confirm our agreement of earlier today that you will inspect and review the documents referred to in the NRC Staff's response to NECNP's interrogatories on NECNP Contention I.B.2 (environmental qualification time durations), on Wednesday, September 17, 1986, at 9:30 AM in my office, located at 7735 Old Georgetown Road, Bethesda, MD.
I have asked that a list of the documents be prepared, and I will arrange to have that list available for you at the same time.
Sincerely, Sherwin E. Turk Counsel for NRC Staff i
8609160014 860911 PDR ADOCK 05000443 G
PDR OEC :000
- 00C
-- -______:___==
________________f__________________.____________
IKIE :09////86
- 09/)/786 O~9 ph