Forwards Revised Response to Violations Noted in Insp Repts 50-250/86-40 & 50-251/86-40.Completion Date for Item 4.b Revised from 870130 to 870331 Due to Late Arrival of Matls to Complete Commitment.Response Withheld
ML20209H812
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/30/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-87-46, NUDOCS 8702060144
Download: ML20209H812 (1)


Text

.-

P. o. Bon 14C30, JUNO BEACH, FL 33408-0420 cup 4 b co' SAFEGilAES EF0E1ATIDs JANUARY 30 1987 L-87-46 10 CFR 2.201 U. S. Nuclear Regulatory Commission Atin: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inspection Report 86-40 Florida Power & Light has revised the scheduled completion date for item 4.b. of our response to the subject inspection report from January 31,1987 to March 31, 1987. This schedule change is due to the late arrival of materials necessary to complete the committment. To assist in the review of this change, the entire response to the Notice of Violation has been included with item 4.b. revised.

The attachment to this letter contains safeguards information and should be withheld from public disclosure.

Should there be any questions, please contact us.

Very truly yours, I

t i

C.O.Wo I

Group Vice President Nuclear Energy COW /RG/gp 8702060144 870130 i

Attachment PDR ADOCK 05000250 G