ML20209H559

From kanterella
Jump to navigation Jump to search
Supplemental Application to Amend License NPF-12,revising Tech Specs to Require Individuals Designated as Qualified Procedure Reviewers to Meet or Exceed ANSI 18.1,Section 4 Requirements
ML20209H559
Person / Time
Site: Summer 
Issue date: 09/11/1986
From: Nauman D
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20209H563 List:
References
NUDOCS 8609150277
Download: ML20209H559 (4)


Text

,

P. Do ye um a.

29218 Nuclear Operations j

SCE&G September 11,1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington,DC 20555

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Plant Technical Reviewer Qualification

Dear Mr. Denton:

In a letter dated August 2,1985 from Mr. O. W. Dixon, Jr., to Mr. H. R.

Denton, South Carolina Electric & Gas Company (SCE&G) requested a change to the Virgil C. Summer Nuclear Station Technical Specifications, Section 6.5.3,

" Technical Review and Control." The change was initiated to address inadequacies in the present Technical Specification wording and to close an NRC inspector follow up item which stated that the present requirement was too narrow in scope. In subsequent discussions between SCE&G and the NRC staff, it was determined that the August 2,1985 request was insufficient and further revision was necessary. As a result, SCE&G is amending the previous request as shown on Attachment 1.

The proposed change requires that individuals designated as qualified procedure reviewers meet or exceed the qualification requirements of Section 4 of ANSI 18.1, 1971. This section addresses c ualification requirements for all l

individuals who may be designated a quali"ied procedure reviewer by the l

Director, Nuclear Plant Operations. The proposed amendment would cover plant supervisory and management personnel which are not specifically addressed in the current Technical Specification.

SCE&G's "No Significant Hazards Determination" is included in Attachment ll to this letter.

This change has been reviewed and approved by both the Plant Safety Review r

Committee and the Nuclear Safety Review Committee. The initial processing l

fee required by 10 CFR 170 has previously been submitted along with the r

August 2,1985 submittal.

The matters and statements set forth in this submittal are correct to the i

best of my knowledge and belief.

0609150277 060911 dpOl PDR ADOCK 05000395 H

P PDR 8kI

Mr. Harold R. Denton Plant Technical Reviewer Qualification Page Two September 11,1986 If you should have any questions, please advise.

ry; rul hrs, D.

a AMM: DAN /dwf Attachments pc:

O. W. Dixon, J r./r. C. Nichcis, Jr.

E. H. Crews, Jr.

E. C. Roberts O. S. Bradham D. R. Moore J. G. Con nelly, Jr.

W. A. Williams, Jr.

J. Nelson Grace Group Managers W. R. IF 'hr C. a ?ria C. L. Ligon (NSRC)

+

R. M. Campbell, J r.

K. E. Nodland R. A.Stough G. O. Percival R. L. Prevatte J. B. Knotts, Jr.

H. G. Shealy NPCF File i

_ _. - - -. _ - - _ -,. - - - _ _ _ _ - _ _ _ _ - - - - _ - - - - _ - _ _ - -. - - - _ -. -.. - - -. -.