April 24, 1987 DISTRIBUTION Docket No. 278 i;'U5EERTiTe-RClark NRC PDR^^"
RMartin LPDR ACRS(10)
PDI-2 Rdg.
M0'Brien Mr. Edward G. Bauer, Jr.
SVarga Vice President and General Counsel BBoger Philadelphia Electric Company OGC-Bethesda 2301 Market Street EJordan Philadelphia, Pennsylvania 19101 Jpartlow
Dear Mr. Bauer:
SUBJECT:
TORUS. ATTACHED PIPING MODIFICATIONS - MARK I PROGRAM (TACNO.64875)
RE:
Peach Botton Atomic Power Station, Unit No. 3 We have evaluated the data presented in your letter of February 20, 1987 on the above subject and have concluded that the use of actual material properties for determining allowable piping stress for the specific case discussed in your ~
letter is acceptable. A copy of our Safety Evaluation is enclosed.
Sincerely,
/s/
Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page PD1-2/P PD1-2/D RClark:
WButler i ff/2y/87
&/zltf87 8705010114 87o4p4 I
DR
(
p ADOCK 05000278 PDR l
/
jo,;
UNITED STATES NUCLEAR REGULATORY COMMISSION n
f 5
,j wasHiNoToh, o. c. zosss
\\,*****/
April 24, 1987 Docket No. 50-278 r
Mr. Edward G. Bauer, Jr.
Vice President and General Counsel Philadelphia Electric Company 2301 Market Street-Philadelphia, Pennsylvania 19101
Dear Mr. Bauer:
I
SUBJECT:
TORUS ATTACHED PIPING MODIFICATIONS - MARK I PROGRAM (TAC NO. 64875)
RE:
Peach Bottom Atomic Power Station, Unit No. 3 We have evaluated the data presented in your letter of February 20, 1987 on the above subject and have concluded that the use of actual material properties i
for detemining allowable piping stress for the specific case discussed in your l
letter is acceptable. A copy of our Safety Evaluation is enclosed.
\\
l Sincerely, i
i Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II i
Enclosure:
I Safety Evaluation I
cc w/ enclosure:
See next page t
-,--,,n,.
a y.
n,
Mr. E. G. Bauer, Jr.
Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 cc:
Mr. Eugene J. Bradley Mr. R. A. Heiss, Coordinator Assistant General Counsel Pennsylvania State Clearinghouse Philadelphia Electric Company Governor's Office of State Planning 2301 Market Street and Develnpment Philadelphia, Pennsylvania 19101 P.O. Box 1323 Harrisburg, Pennsylvania 17120 Troy B. Conner, Jr., Esq.
1747 Pennsylvania Avenue, N.W.
Mr. Thomas M. Gerusky, Director Washington, D.C.
20006 Bureau of Radiation Protection Pennsylvania Department of Thomas A. Deming, Esq.
Environmental Resources Assistant Attorney General P.O. Box 2063 Department of Natural Resources Harrisburg, Pennsylvania 17120 Annapolis, Maryland 21401 Pr. Albert R. Steel, Chaiman Philadelphia Electric Company Board of Supervisors ATTN: Mr. R. Fleishmann Peach Bottom Township Peach Bottom Atomic R. D. #1 Power Station Delta, Pennsylvania 17314 Delta, Pennsylvania 17314 Mr. Gary Mock Mr. M. J. Cooney, Superintendent P.O. Box 09181 Generation Division - Nuclear Columbus, Ohio 43209 Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Mr. Anthony J. Pietrofitta, General Manager Power Production Engineering Atlantic Electric P. O. Box 1500 1199 Black Horse Pike Pleasantville, New Jersey 08232 Resident Inspector U.S. Nuclear Regulatory Cormission Peach Bottom Atomic Power Station P.O. Pox 399 Delta, Pennsylvania 17314 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 l
l
__.