Forwards Safety Insp Repts 50-456/86-44 & 50-457/86-32 on 860818-22 & 27-28.No Violation Noted
ML20209G868
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/09/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20209G871 List:
References
NUDOCS 8609150092
Download: ML20209G868 (2)


See also: IR 05000456/1986044

Text

_

-

'

.

SEP 0 91986

Docket No. 50-456

Docket No. 50-457

Comtr.onwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

This refers to the routine safety inspection conducted by Mr. W. B. Grant of

this office on August 18-22 and August 27-28, 1986, of activities at Braidwood

Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132 and

No. CPPR-133 and to the discussion of our findings with Mr. C. Schroeder at

the conclusion of the inspection.

l

The enclosed copy.of our insptction report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and r?presentative records, observations, and

interviews with personnel.

The inspection included review of the changes

you have made or intend to make

'.o strengthen the Braidwood Health Physics

Staff and to improve their experience as specified in your letter of

.

July 11, 1986.

I

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

I

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure:

Inspection Report

No. 50-456/86044(DRSS);

No. 50-457/86032(DRSS)

See Attached Distribution

~

/

r

L

e

8609150092 860909

PDR

ADOCK 05000456

G

PDR

_ - _ _ - _ _ - _ _ _ _ _ _ _

-.

- - .

.

- - .

..

._-

..

.

.

. .

Commonwealth Edison Company

2

,

SEP O S 1986

Distribution

1

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory-

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

,

Resident Inspector, RIII Byron

i

Phyllis Dunton, Attorney

General's Office, Environmental

4

Control Division

.

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

j -

G. Berry, ELD

J.'Stevens, NRR

The Honorable Herbert Grossman, ASLB

-

-

- The Honorable A. Dixon Callihan, ASLB

The. Honorable Richard F. Cole, ASLB

i

i

i

t

i

,

l

i

a

.

.

.

.

. . -

.

.

.

. .

.

.

.

.

..

.