ML20209G781
| ML20209G781 | |
| Person / Time | |
|---|---|
| Site: | Hatch, Vogtle, 05000386, 05000000 |
| Issue date: | 04/27/1987 |
| From: | Youngblood B Office of Nuclear Reactor Regulation |
| To: | James O'Reilly GEORGIA POWER CO. |
| References | |
| NUDOCS 8705010065 | |
| Download: ML20209G781 (4) | |
Text
--
I Docket Nos.: 50-321, 50-386 and 50-424, 50-425
. Mr. James P. O'Reilly Senior Vice President -
i Nuclear Operations Georgia Power Company
'l b
P. O. Box 4545 Atlanta, Georgia 30302 i
Dear Mr. O'Reilly:
As you no doubt are aware, the NRC is now implementing a major reorganization.
Part of this internal restructuring has involved changes in assignments of plants such that NRR responsibilities-are now assigned on a regional basis-
-rather than along vendor lines as was the case previously.
In accordance with this change, responsibility for both Hatch and Vogtle is assigned to this Directorate, which is a part of the Division of Reactor Projects-I/II. The Director of the Division of Reactor Projects-I/II is Mr. Steven A._Varga who may be contacted by telephone on (301)492-9595 The.
NRR Reactor Projects Assistant Director for Region II facilities is Mr. Gus j
C. Lainas who may be contacted by telephone on (301)492-7980. My telephone numberremainsthesame,(301)492-8060.
The Project Manager for Vogtle is still Ms. Melanie A. Miller, who may be contacted on (301)492-7357. However, there has been a change in the Project' Manager assignment for Hatch. Mr. Lawrence P. Crocker has replaced Mr. George i
i W. Rivenbark as the Hatch Project Manager. Mr. Crocker may be contacted at 1
(301)492-7363. Ms. Miller and Mr. Crocker each will serve as backup for the
}
other.
I look forward to continuina our association on Vogtle and to begin working with you regarding Hatch. Should any problems arise requiring my attention, please feel free to call me.
Sincerely,Y
\\
B. J. Youngblood Director Project Directorate II-3 Division of Reactor Projects-I/II cc: See next page Distribution:
- M]
LCrocker 0GC-Bethesda NRC PDR MMiller Local PDR
-SVarga PRC System Glainas ACRS (gblood Rdg PDII-3 Reading BJYoun MDuncan 10) j
{hP-I/II PD#IIhl MDu b n/DRP-I/IIPDfh
-I/II f
$/
-I/II P
L lter c
FN tr
-BJYoengblood
/
/8 04
/87 04/
/87 04/
/87 hO 065'870427 P
ocK c5000321 PDR
Q Ctc o
UNITED STATES
~,,
NUCLEAR 3EGULATORY COMMISSION g
g ep WASHINGTON, D. C. 20555
%,*****/
APR 2 7 1987 Docket Nos.: 50-321, 50-386 and 50-424, 50-425 Mr. James P. O'Reilly Senior Vice President -
Nuclear Operations Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302
Dear Mr. O'Reilly:
As you no doubt are aware, the NRC is now implementing a major reorganization.
Part of this internal restructuring has involved changes in assignments of plants such that NRR responsibilities are now assigned on a regional basis rather than along vendor lines as was the case previously.
In accordance with this change, responsibility for both Hatch and Vogtle is assigned to this Directorate, which is a part of the Division of Reactor Projects-I/II. The Director of the Division of Reactor Projects-I/II is Mr. Steven A. Varga who may be contacted by telephone on (301)492-9595. The NRR Reactor Projects Assistant Director for Region II facilities is Mr. Gus C. Lainas who may be contacted by telephone on (301)492-7980. My telephone number remains the same, (301)492-8060.
The Project Manager for Vogtle is still Ms. Melanie A. Miller, who may be contacted on (301)492-7357. However, there has been a change in the Project Manager assignment for Hatch. Mr. Lawrence P. Crocker has replaced Mr. George W. Rivenbark as the Hatch Project Manager. Mr. Crocker may be contacted at (301)492-7363. Ms. Miller and Mr. Crocker each will serve as backup for the other.
I look forward to continuing our association on Vogtle and to begin working with you regarding Hatch. Should any problems arise requiring my attention, please feel free to call me.
Sincerely, o
E. J.j Yo ngblo d, Director j
Projdct irectorate II-3 Division of Reactor Projects-I/II cc: See next page I
~
0 Pr. J. P. O'Reilly Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 Docket Nos.:
50-366/321 cc:
Bruce W. Chruchill, Esquire Shaw, Pittman, Potts & Trowbridce 2300 N Street, N.W.
Washington, D.C.
20037 Mr. L. T. Gucwa Engineering Department Georgia Power Company Post Office Box 4545 Atlanta, Georgia 30302 Nuclear Safety and Compliance Manager Edwin I. Hatch Nuclear Plant Georgia Power Company Post Office Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Post Office Box 279 Baxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Mr. Charles H. Badger Office of Pianning and Budget Room 610 270 Washington Street, S.W.
Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Commissioner Department of Natural Resources 270 Washington Street, N.W.
Atlanta, Georgia 30334 Chainnan Appling County Commissioners County Courthouse Baxley, Georgia 31513 1
L)
Mr. J. P. O'Reilly Georgia Power Company Vogtle Electric Generating Plant cc:
Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Comission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Depoish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company /
Suite 225 Southern Company Services, Inc.
32 Peachtree Street, N.W.
P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Paul D. Rice Troutman, Sanders, Lockennan, Vice President A Project Director
& Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.
Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.
P.O. Box 2625 Carol Stangler Birmingham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr.
Atlanta, Georgia 30307 Bruce W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, D. C.
20037 Mr. G. Bock, hold, Jr.
Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. R. E. Conway Senior Vice President and Project Director Georgia Power Company Rt. 2, P. O. Box 299A Waynesboro, Georgia 30830
.-