Text
-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _.
@ Consumers Power xe,,
h av Lkensing mmunaws enceuss General Offices: 1945 West Parnell Road. Jackson. MI 49201 e (517) 788-1636 January 28, 1987 i
Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -
DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
i CLARIFICATION OF CPC-2A COMMITMENTS VERSUS BASIS REQUIREMENTS A recent detailed review of Consumers Power Company's Quality Assurance Program Description for Operational Nuclear Power Plants (CPC-2A) commitments, versus basis requirements (ANSI Standards, Regulatory Guides, etc), has identified several areas where clarification appears necessary, either in the text of CPC-2A itself, or in the exceptions / clarifications of its Appendix.
These clarifications are necessary to avoid possible misapplication of requirements, and to preclude both internal and outside misunderstandings of Consumers Power Company's position with regard to these items. The attached matrix identifies each proposed alteration to CPC-2A (Revision 5), presents the reason the change is desirable, and explains the basis for concluding the program, as revised, continues to satisfy the criteria of 10CFR50, Appendix B.
Since these changes may be considered a reduction in our previous commitments, your approval is required in accordance with 10CFR50.54(a).
Pursuant to 10CFR170.12c, a check for $150.00 is enclosed.
l f
Kenneth W Berry Director, Nuclear Licensing i
CC Administrator, Region III, NRC NRC Resident Inspector - Palisades h
Attachment 8702050377 870128 M D'-
PDR ADOCK 0500 5
ff, OC0187-0006-NLO2 P
gg hec le$ u))WectV/50 CD de>wnc7A
SIALITY ASSURAIICE P90 graft IIESCRIPTICII (CPC-20)
GC-2A CPC-2A Basis sur Continued Campliance elevisio jn Proposed Revision 6 Reason for 05an,g*
with 10CHESO - Appendia B,
W T pkCormick letter, eighteenth line W T POCormick letter
. "and responds to the addit tunal guidance
... "and to attSI N13.7, e $ the ANSI M45.2 This change clarlfles the helrarchla!
The program in CPC-2A captisance to contained in ANSI NIS.7, the ANSI n45.2 Series of Standards and correending relationship of ANSI 8118.7 and the meet Appendia S.
The change oniy Series of Standards and corresponding Regulatory Culdes withlm the conte 4r of 1145.2 "da,eghters." Consumers uses this c larifles doctment teetrarchy to kegulatory Guides.
applicability taposed by N!S 7.
approach to assure that the 1045.2 series make implementation of specific standards are properly applied to activi-Asast requirements eure logical and ties occuring at ope.ating plants. The organtaed from a user perspective, beclear Operatione Department Standards No change in CP Ce practice is en*
(see 2.2.5e) were created, and continue to pected as a result ol this revision.
be maintained with this structure in mind.
2 8.7.2a (eighth $ tee), Page 2 1.2.2a (el$th item)
This change recognizes an agreement r eacteed Criterien Theelve requires that PL-between Projects Engineet ing and Construc-tekTE lee controlled and calibrated to Cont rolling a calibration recall system Contrailing a calibration recall system.
tion and Plant 16C to allow the plant to assure meruracy. This change merely for PL-sekTE <nened by the plant.
control calibration el PL-ftkTE used by clar tiles responsibility f ur this contractors for ma%r audifications.
action. The program represented by CPC-2A thus continues to meet Appendia D.
3
~~~1.7.Se (Ilrat ites), page 8 1.2.5a (itrat ites)
These changes accceptish clarifications Crlterton Ten requires that an in-of responsibility as follows:
spection program be established. No Plant site surveillance program Plant site quality assurance survettlances Criter ton addresses QA surveillances.
of safety-related activities, including
- 1. The " surveillance program" referred The changes continue the eatsting
-and-operations, maintenance, modittcaticas, to is a % uality assurance survell-surves tlance and inspect eun pro-I procurseset, testing, etc.
lance" - not technical specification grams with the clartlis ation that surveillance tests. QA survettlances
" operations" activit ies are more 1.7.Sa (seventh Item), page 3 1.2.5a (seventh Ites) are applied to all safety-related ef fectively muset tered via survell-activities, including operations.
lance than inspect ion. The pro-Plant site Isopection program, including Plant site quality control inspection gram represented by these sections reselving instection and snapection and program, including receiving inspection
- 2. The " inspection progrm" re ferred to af CPC-2A continues t o meet Apten-acc eptance activltles associated with and inspectice and acceptance activities is a " quality cont rol" inspection
- din S, especially since the commstt-operettuns, maintenance, mudtfications, associated with maintenance, modifications, not inspection associated with equip-ment to perform surveillances is testtog and fuel handling.
testing and fuel handling.
eent trouble diagnosis or with ASPE in addition to the established
-and-Section 11 inspections. As nasch, inspection program. (Survell-80.2.2, Page 41 10.2.2 inspection of " operations" la nut lances may also be thought of as necessary because of other NIIC re-the " process monitoring" required Inslessions are applied to procurement, inspections are applied to procurement,
quirements dealing with verification by Criter6un Ten when trapection mainten.ance, audillcations testing, fuel maintenance, modification, testing, fuel by a second qualtiled operator.
$s disadvantageous.)
handling, operation and inservice inspec-het J!tng and inservice inspection..
Operations is, however, a candidate tion.
for quality assurance surveillances.
No change in CP Co practice is en-pected as a result of this revision.
4 F.7.2, Page 35 7.2.2 Il a Licensee Contractor / Vendor Inspection If the Coordinating Agency for Supplier This change is necessary since the NitC The program in OpC-2A omit lnues to Progree letter of conf ttmat ten or alw Evaluation is used... the documentation will no longer be issuing LCVir letters, meet Criter sun beves. f Appendla B, C.=,rdinating Agency for Supplier Evaluation identifies the audit used.
la that supplier evaluat ion is dow Register is used.. the documentation ad required.
ident lines the letter or the audit used.
No change in CP Cu pract6ce is es' twcted as a result of this sevistust.
LCVIP letters had not been used in tie past.
.m i ine,14mmA ept.
I
a -
e 4tJALITY ASSURANCE PRuGRAM IESCRIPTtOII (CPC-2A)
CPC-2A CPC-2A Beats for Continued Compliance Revistan 5 Proposed Revision 6 Reason for Oaanse with 10CHr50 - Appendia R O
- 17. 7.5, page 47 Alter 12.2.5 to become 12.2.5, 12.2.6 and This change corrects terminology of The program to CPC-2A continues to 12.2.7.
Retain the estating 12.2.6 as CPC-2A to be coaststent with that used meet Appendia B in that MkTE to Mesauttas and test equipment is calibrated 12.2.8 in IIRC Standard Review Plan OIUkEC Oslou).
properly callt, rated and controlled,
.t spectised intervals. These latervale la accordance with Criterton 1belve, are based on the amount of use, stability 12.2.5 and with NUktt 0000 espectations, charattertatics and other conditions that could adversely offact the required measure-Measurtas and test equipment (MhTE) la ment accuracy. Reference and secondary calibrated at spectiled latervals based ca cattbratica standards are traceable to the required accuracy, purpose, degree of nationally recogataed standards tenere they usage, stability characteristics, and other entst. lonere mettonal standarde de out canditions affectlag the esseurement. Call-salst, provistoma ese established to docu-bretion of IETE le against standards that mest the basta for calibration.
have an accuracy of at least four times the required accuracy of the equipment betag i
iteference standards that have at least four calibrated or, ideem this is not posalble, times the required accuracy o! the item have an accuracy that assures the equipment teing calibreted are used to calibrate being cattbrated will be withia required secondary standarde. laten this accuracy is tolerance and the beste of acceptance to not poselble, these standards shall have en documented and authorised by responsible accuracy that assures that the equipment management.
telas calibrated will be withis required tolerance. In such cases the beats of 12.2.6 acceptance is documented, and la authortaed by identified manag ment.
Calibrating standards have greater accuracy them atenderde being calibrated. Calibrating Secondary standarde shall normally have standards with the same accuracy may be used greater accuracy than equipment or lastalled if it can be shots to be adequate for the plant instrumentation being calibrated.
requirements and the basta of acceptance to Standasde with the same accuracy may be used doc eented and authorised by responsible dien shown to be adequate for specific call-management.
bretton requirements. The beste for this acceptance is documented and to approved 12.2.7 by responsible management.
Reference and transfer standards are trace-able to nationally recognized standards; where national atendarda do not esist, pro-vtatcas are estabitehed to document the basis for calibretten, a -. a.
,.,r
,.g..,
.p..t1. A. P.,a,
5b.
G.J.2 3D. Q.3.3 1his change clartiles that only ten-1he program la CPC-2A continues to porarily aestsned personnel who require meet Appendia S in that persons pequerement Requirement einescorted access to the plant to per-per forming safety-related act tvi-fore their work need receive CET. Per-ties are required to be indoctri-
%en an individual is hired to temporarily Menen an individual la hired to temporarily sons who only perform work outside the nated and tratped to achieve and function as a plant employee, such as for functica as a plant employed, such as for protected area, or under escort inside maintain auttable proftctancy in contracted services, evidence of previous contracted services, evidence of previous the protected area, may not meet CET.
the functions assigned, as requtred i
education, espertence and tratatag should be education, esperience and training should It sh<mald be acted that because of by Criterica TWo.
provided and reviewed by the appropriate pro-be piavided and reviewed by the appropriate faceptica/laterpretation 5a (already tesalonal-technical group leadore. The appro-Profeestomal-technical group leaders. The approved) this item appites only to Na change la CP Ce practice is en-praete group leadere should then determine appropriate group leaders should then deter-persons performing QA/QC tusections.
pected as a result of this revision, the content for that indivtdual'a tratatas, etae the content for that ladtvidual's tactuding plant-spectilc tratains. As a tratatas, tecluding plant-spectits tratalag, stalaus, each ladividual should recetve As a stalmum, each ladividual abound receive General taployee Tratatag.=
ceneral Employee Tratalag."
l on t nu. uma yaon 2
.p Qual 87V ASSURANCE PhnChaal DESCRIPTIO01 (CPC-1*.)
o CPC-2A CPC-2A Basis for Centtaued Compliance Revistan 5 Proposed Revisten 6 haasan for Chanas wtth 10CFR50 - Asisendia B tacept ton /las erpret et ten Escent tom flat erpret at ion CP Co enderstande that this requirement CP Co understande that this requirement applies appIles both to CP Co employees free another both to CP Co employees f rom another site and ette and to contract pesoanel een are tem-to contract pesenmal ideo are temporarily porarily assigned to a nuclear pauer plant aestped to a nuclear power plant either as altteer as replacemente for regular opptoyees replacessate for regular employees or to augment or to augment the staf f during outages. CP Ce the staf f eartas autagne. CF Co employees se emplorees so esatamed possess the required ametened poseees the required quattitcations as quellitcations as a prerequisite to the a prerequialte to the asalgement and the review eastamment and the review Is walved. The to wolved. The quellficattens of contract qualistcations of contract pereennel are re-pereenmal are revleued and arrangemente made viewed and arrangements made for any necessary for any accessary tratalag. Temporarily assigned tratains. All temporarily aeolgand pes eemmel persammel requiring unescorted access receive the reselve the site general artestation as en-ette someral arteatation as embodied la General budied to General faplayee Tratales.
Employes Tralstag.
O ho s t em.
Ascendia A. Part 2 (add a new item 7b - renumber eatsting 2b-f and retats as to) 7b, Sec 2.4 This change recognizes that CP Co has Critetton 1bo requires that (D.e qA Reautrement always, and centtaues to qualif y program provide l'or tudoctri ation auditors to 1845.2.23, not to MS.2.6 and training to assure euttable pro-
"... Of fsite laspection, samslaattaa or Inspectors are qualif ted per N45.2.6, ficiency is achieved asal maintained, testtag shall be audited and somitored out cr ce malatatas that perseas per-The program deserthed la CPC-2A con-by per - l who are quattiled in foretas audt to of inspect too, emantne-ttaues to satisf y this criterton In accordance with H4S.2.6."
t&om and testing need not be qualtlieJ that tooth inspectLon and audit per-la the same manner as the persons sonnel must quellly in ascordance f aception/laterpretation perforetag the taspectica, esaminettese with standards pertinent to their or test.
respea &&wa activities.
Audit personnel at Consumers Power are quattiled and certified la accordance 180 change is espected la CP Ce pru -
with ANSI M45.2.23-1978 as endorsed by ttce se a result of this revisten.
Regulatory Culde 3.146 Such personnel are not also quellfled accordtag te 8e45.2.6, unless they will actually be performing inspections, he stem Appendia A. Part 2 (add a new Stem 9b - renumber estattag 96 and rotata as is) 9h, Sec 2.2(5) 1bts change is actually the same as Since this ch.aise merely eatends an ameutrement 3 3a la CPC-2A, Devision S.
1he already approved f.aception/Clarit t a requirement cited was found to eats:
cation, the Program in CPC-24 con-Sectlen 2.2(5) of AhSI N45.2.4 lists in two ANSI Standards, but only one tanues to comply with Appendia s.
documenta uhtch are to be available had been prewicualy addressed.
at the cometructica atte.
No change in CP Co practice is en-I pected an e a esult of this revisiuse, f acept tun /Clari f seat ton All of the ducisments Itsted are not necessarily required at eine plant ette for lastellation and Esttag. CP Co assures that they are available to the site as necessary.
t l
..a e s
...A. fan.
t
g-
.s a
QUALITY ASSURadeCE Panase DgSCRIPTIGII (CFC-2')
CPC-23 G C-2A Basta for Continued C4mpliance Reelsten S Proposed Revleton 6 Reason for Osamme with 100 fit 50 - Appendia B O9 pie Stea.
Aegendts A. Port 2 (add a new Staa los - remnaber estattag SQs-c and retain as to) 10e M5.2.5, Soc 2.4 This change recogalaes that CP Co planta The 4A Promram coattaues to aset are act isader constructica, and that the Criterlom h of Appendia S. In tegent rempet aamust of steel and concrete work re-that persons levolved la acttuttles quiring taspectice or test per 184 5. 2. 5 af fecteas quality are res,utred to "Perooms charged with engtesertas ammagertal te very maall, assually only occurlag be lad.setriaated med tralmed to respomethtlity of the taaeocties and teettag dustag stantitcaat scope modificaticas.
achieve auttable preticiency.
organisettee at the alte in either a reefdent At such t$aes ma it becomes necessary, or non-resident capacity shall be certified CP Co has comitted to metas a tavel III Dio chas e la CF Ce practice is en-s for level III capablitty."
qualtiled ledtvidual, tnst will not pected so a result et this reviatesi.
eccessarily metatata such level af Escept ion /laterpret at ion quantiteetten for eaglesertas managertal peranma in charge of taspections/ tests lhte standard (MS.2.5) was writtee for the disstag normal operations, cometruction phase of maclear powr plants; as auch, It preenmes sinalittant activity la the areas of concrete and structural steel editch do not gaaerally occur at an operattag t
plant. At Ceasemara Power, pareena having 2
engtmeertas semagertal respumelbility for i
tiene and tests
- any be certilled to i Ill, or any meet other quellfication 4
criteria estahltahed for the poetsten, tecluding, but not Sletted to, nuclear power sad - _
t espertence. For major modtit-catione tavolving algatitcant concrete er structural steel work, the services of a properly qualtfled tavel Ill individual will j
he obtalmed Ia at least an advisory capac!ty.
- within the scope of 8645.2.S s--
to e
arren=88 a A, Part 7 (pases 71/ 4 Ila. sea.7.a. Sec l.2 11a. h65.2 3. Sec 1.2 This change clarifles that the eastce of Criterton TWo of Appendia a coattaues qualtlicattom reqestrements for tests to be satisfied to that the QA Pro-m,qu i r ement Reemtrement performed as part of plant operatione gram et til requires perseas periors-(sisch as Surveillance Testa) is the plant tag activities af fectlas quality to "TI.e pequtrement s of this standard apply "The requirements of this standard apply Technical Spectitcattens. It also be tralmed to achteve and maintate se perseseel meae perfore taspections, to persommel ideo pertere toapectieas, clartiles that the essertion f ree suitable prettclency.
I esamis.attoma, and testa during tabrice-esmalmettoma, and teste duttag fabricattaa 156 5. 2. 6 applies to snapectten as well staa prior to and dustas receipt et Steas prior to and durlag recetyt of Steas at the as teattag perscenet.
see chande in CP Ce practace la en-at the cenagructtaa site, durtas cometrisc-cometracties site, eartas constructies, pected as a result et this revision.
j s ten, dus tas proeperet tamal and start esp durtas proeperettoman and start-up teettas testing and diertas operet tamal phases et and disting operettenal pheaea of maclear nuc le.r poner plant s."
poner plants."
t u.pe son / Interpret at som Eatees ton /lat erpres as tem 4satt ficat taa of plant peraummel edne persora Osallitcasion of pereennel involved with testles is provided in spectiSc plant spect-teattag asacciated with plant operetten to f ic as sene. Pesecamel partialpating in teattag as provided te Plant Technical hpecifica-we., take data er aske ebservations, edsen
- tions, special srelatag is not registred to perform this functica, need wt 1,e geselfled la la addition, persommel participattag la mue,ra.a.e with ANSI 8645.2.b but need only laspectten er testist who take data wr make te t rained to St.e eatent necessary to pet-observat toma, where special teatelag to m.t a.,em the assigned funct two.
registred to perform this function, need not te gesellfled la accord ace with 3645.2.6, but need only be tralmed les the eatent seecesaary to perfore the assigned function.
. A s... - sansea -e aus.
6
e ybaLITY atenkaaner peoLaape ranlrTIoII (CPC-21)
CPC-Ah CPC-2A taste for Coatismeed Complisse6e meetstem %
Proposed howlsiust 6 Reason for Chamme ulth tut 1350 - ascendia B approdIs a. Part 2 Page N aseendia 4. Part 2 32 ac I.%s, Sec C.1 12a. aC 1.54. C.1 The wording la Revistun 5 may have tapiled TI.e pro 6 tan, es modified, coat tauen i
R c etroment beentrement that CP Ce uma tektes esceptten to the DC te meet Appendia 3 in that it estil 1,54 statammete. ht was not the latent.
prowldes ter appropriately qinaltiled CP Ce fully supports the regulatory post-perseemet to perform activltles
'%= sever, for quellficat tan of persammet "IIeumwer, for qualificetten of persosenet atom, recogetslag that some offstte empport affesttag quality, as required by (1) ed.e approve preoperettenal, start up (1) idhe approve preagerettemel, start up groupe any already have accept hle que11-Criterluse Tue, and operettamal test preceemree and test and operettamal test procedieree and test ficatten programe based on It45.2.6.
results and (2) uhe direct er empervios results and (2) edne direct er superwtee Ino chance la (7 0) practice is en-the conduct of ledividual prosperetteest, the comesct of Radtvlenel preoperettenal, pected me a reenalt of this revision.
3 1,
start up and operettomat teste, the p!de-start up and operettessel teste, the gulde-Itaea contataed in Sep! story Guide 1.0, Itana centeamme in Replatory Guide 1.8, Persammel Selectien and Tratatas, should Perseemel Selection and Traintag, eheste be telleued la lieu of the padeltaes of he felleued in Itas of the guldettmas of Albl h65.2.6-1978."
am ! 1145.2.6-1928."
i racept ton /laterererar ten Eacentlee/intersretatten 1
This registrement le laterpreted to met CP CD eedorses this posities, se else stated apply to etf atte support organtaations.
is lla, shows, eacept that of fette support ftene departemets howe deweteped their organisattees Revolved la testing any apply 4
j qualificetten programe based en aflSt 48188 e65.2.6. Same of these departmoete Is4%.2.6 and provide services threinghout have alsmedy deeeleped their qualiticatten t%e operettene phase of CP Ce shsclear programe based en 8165.2.6, and provide eer-Plante. These programe tecleads the vices threm @ t the operettene phase of certtiscatism of the Ptret Line Super-CF Ce mesclear plante.
= Sears to ahbl st45.2.6 and addit temal l
spec tilc requisemme.to deterstmed by the I
we,sh estivity levolved.
8 aer+aJI. a, peer 2 aseendia a. Port 2 he stese.
(add new treme 13e and 13h - renummer i
ealettag 13s-c and rotata) 13e In6%.2.8 Sec 2.2 Thle chance is necessary to altsn treatment The program in LPC-2A cometeues to of qinaltittetten utth Laception/Clarifica-meet Apperedia B requireamste in Eleat n tistrement tien stame lla and 82a, and with the post-Laapectiese end test personnel attil o
stem taken by the slaC la Segulatory Culde must t,e tralmed and qualif ted to per-Sectlen 2.2 requires that pereoanel per-1.58.
Yhte provides a uniform approach form these finsections, as registred tey foretog lampactlam and test activittee to applicottee of astSI 194 5. 2. 6 require-Criterton hev.
be qualtfled accordlag to adISI II65.2.6.
meets.
8te change in CF Ce practice la en-Encent les /Intereretat ten pected as a result et this revisiese.
I See Encepties/laterpretatten its and 12a.
Test perecemet edio are part of the plant staf f need met be certtited to h45.2.6, provided they aset applicable quelliteettee criteria of plaat Techatcal Specificettena.
i yA 3 rummaa tout 5
MTV A88mamWT PtKaest IESC3IPyl0II (CIC-2A)
CFC-2A OC-2A Beste for Cantinued Camipliance Sovieles %
Preseeed bowletae 6 teases for Chamar with 10GRW - Ammeedts B l h, Soc 2.9 his new Stem is acte ally the same as Stace thte change merely eatende an Etes 9e la CPC-2A, Rev 5 (already already approved Eaceptin/Clartf tra-h approved). he requiremmat cited was Elem the Program in CPC-2A castlaues famed to estat ta two AftSI Standards, to comply with Appendia S.
Section 2.9 establishes preregistettes uhtch but only one had been previensely anaat he met befers the testalletten, la-addressed.
ayectten and teett of hical egistp-meet any proceed, preregolettee factede peroommel and precedure genettitca-ties, centrol of destan, meterial selecties and fabricatten, a=4 swettability of spect-fled dec eente.
Racentles/Intereretatten Ihstles the aparettene phase, this require-meat to cemeteored to be applicable to endtficattene of ascenamical equipment.
Per reattaa er persedic taspecties and teettag, the preregniettee will be achtowed as necessary.
8 Appendia A. Part 2 Ascendia A. Part 2 me Sten.
(ade e new 8 tem th - reneher estattes lie-f and retete es to) 17e, Sec 7.5 This change la necessary to provide con-The progree in CPC-2A continues to afstency with other postatema regardias meet Appendia B to that personnel Regulr w A8158 1165.2.6 and to provide CP Ce perforetag source veristaattom toterpretation of "so applicable."
actions are properly trataed and "Persammel resposalble for perterstas qualif ted for the activity they per-vertiteetton activities shall be genettfled form, se required by Criterton hse.
Se accordance with AISI le45.2.6 as appit-cable."
he change la CP Ce practice la en-pected as a result of this revision.
Recentlas/latereretattee Cumamore Feuer genettites audit personnel according to 8165.2.23. 2hese, perseemet perferetag maarce vertiteettom audite any not he certtiled accordtag to 184 5. 2. 6.
Perseemet perforslag taapactice se part of asserce vertiteetten will be certtiled to 8165.2.6.
. a I : no.-enmaua,wis, en
.}
e QUALITY accmaanrw penemm DESCRIPTION (CPC-EM CPC-2A CPC-2A Ba.te for Contismaed Complianse howIeice %
Prasoemd hewIe1on &
Roeses for h
=ith 10CHIW - Aseend8m B O
Apeendia A. Part ? Page St Assendts A. Part
- 1ea. RC l.26. General 18e. RC 1.26. General this change fully clarifles that CF Ce The program in CK-24 continues to comeldered the guidance of RC 1.26, but meet Appendia S in that le still Arquerement hoquir m now uses RG 1.29 to determine etch plant requires the $dentificatten of items are safety-related.
structures, systems and camponents AG 1.26 estabilehen a system for cleastfytes RC 3.26 estahltehes a system for closet-to be covered by the program, se preneurs benadery teams into four quality fytas pressure boundary itene Sete four required by Criterton Sko.
Broups, each are then correlated utch quality
, etch are then carrelated Asat S&PV Code and AstSI Standards require-with ASS Code and AGISI Standard No change in CF Ce practice is es-
- mente, regetremente. (Emmover, RG 1.26 done pected as a result of thle revision.
not tedicate ednich of the four quality Eu eetton/Clartficatsom gre y are safety-related, and e tch are met.I
- 1. DC 3.26 use not used as a beste for establiehtag the Itets of eefety-related Easentlem/Clar$ ficat tom items for the Falleados and Sig Rock Potat Plante. For Big Rock Petat, Stame BC 1.36 ene used as a reference to ese cleastiled as estety related er ase-establish piptag system boundsries, but safety related la accordance utten met for dettalog spectile quality groupe Regulatory Gutes 1.29 er ashtag aseety-related deterstaattoms.
RC 1.29, sebject to Enceptian/laterpreta-
- 2. Items falling late Crampo A, B and C ties 30s, to used to deterstas test are considered to be setety related.
systems and egespment are oefety-related.
Croup D Stame are met.
a.A3Ine*OUuuA-yAU6 2