ML20209G178

From kanterella
Jump to navigation Jump to search
Discusses NRC Confirmatory Measurements Program.Liquid Samples Spiked W/Radionuclides Will Be Sent to Plant for Radiochemical Analyses,Along W/Instructions,Within 30 Days. Analyses Results Requested within 60 Days of Sample Receipt
ML20209G178
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 04/23/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
SYSTEM ENERGY RESOURCES, INC.
References
NUDOCS 8704300493
Download: ML20209G178 (2)


Text

_ - _ _ - _ _ _ _ _ - _ _ _ _ - _ _ _ - _ - -

OfOdd a

n APR 2 31987 S[stemEnergyResources,Inc.

LATTN: Mr. O. D. Kingsley, Jr.

Vice President, Nuclear Operations P. O. Box 23054 Jackson, MS 39205 Gentlemen:

SUBJECT:

DOCKET NO. 50-416 AND 50-417 As part of the NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides will be sent to the Grand Gulf facility for radiochemical analyses. These samples are to be analyzed for tritium, iron-55, strontium-89, and strontium-90 in accordance with your approved procedures for analysis of liquid waste samples.

If routine analyses of this type are normally performed by a vendor, this vendo'.should be used to analyze the spiked samples.

The spiked samples, with instructions, will be sent under separate cover from the Department of Energy's Radiological and Environmental Sciences Laboratory, within approximately 30 days.

We request that the analyses be completed as soon as practicable, but not later than 60 days from receipt of the samples.

Results should be sent to:

U. S. Nuclear Regulatory Commission, Attn: Mr. J. B. Kahle. Our evaluation of your results will be discussed with your staff and transmitted in a letter.

Spiked samples will be sent to you on an annual basis as part of our routine inspection program.

If you have any questions regarding this program, please contact Mr. Kahle by telephone at (404) 331-6968 Sincerely, hI} fill

$1( Ufd h j

David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc:

(See page 2) 8704300493 870423 PDR ADOCK 05000416 p

PDR yo M

n

.~

System nergy Resources, Inc.

2

-cc:

. H. Cloninger, Vice President, Nuclear Engineering and. Support d'.E. Cross,GGNSSiteDirector g.R.Hutchinson,GGNSGeneral J anager W. F. Dale, Director, Nuclear II.LicensingandSafety T. Lally, Manager of Quality Assurance Middle South Services, Inc.

J. B. McGehee, Esquire yise, Carter, Child, Steen and Caraway 7.S.Reynolds, Esquire Bishop, Liberman, Cook, Purcell I.&Reynolds W. Jackson, Project Engineer

4. O. Smith, Plant Chemist bec: JfkC Resident Inspector
g. Kintner, NRR Document Control Desk State of Mississippi RII RII R

RII SA movitz J

J DCollins D

4/v/87 4/#/ /87 4/22/87 4/tt/87