r 315 342 3464 SEP 05 '86 14:50 USHRC 9 MI PT 2 P01 INFORMATION
// o -/
M V NIAGARA ONLY RuMOHAWK HlACARA MoMAWK POWER CORPORADON/300 EA:E BOLLEVApo WEST sv AAcuSE N Y mc2/TrLEPe M.C 43'5 4N M'i fay '. TO 3' LWord e
- pow, N e^ P rA May 12, 1986 (NMP21. 0712)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Comission Region I Division of Reactor Projects 631 Park Avenue I101 DI fnlililii f6 %% ;
11111e t'll i e r u l fl L - Uil l 4 4 Docket No. 50-410
Dear Mr. Starostecki:
As you know, the BWR Owner's Group is developing a generic BWR position for meeting the requirements of I.E.Bulletin 85-03 " Motor Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings".
The BWR Owner's Group study will provide a technical basis for identifyinq BWR plant specific testing and analysis.
This study is scheduled for completion by about September 1, 1986.
We respectfully request a delay in our response to I.E.Bulletin 85-03 for Nine Mile Point - Unit 2 until the BWR Owner's Group study is completed and the Nuclear Regulatory Comission's appraisal of that study can be reviewed by Niagara Mohawk.
We propose to submit a response six months af ter issuance of the Nuclear Regulatory Comission's position on the BWR Owner's Group's recommendations.
Very truly yours, C. V. Mangan Senior Vice President CVM/GG/cla (1570H) xc: Director of Inspection and Enforcement 0609120291 860512 U.S. Nuclear Regulatory Comission PDH ADOCK O'uOOO410 Washington, DC 20555 G
"UR R.
A. Grans1, NRC Senior Resident inspector NMPC Project File