ML20209E439

From kanterella
Jump to navigation Jump to search
Forwards Status Rept on Petitions Under 10CFR2.206.Petitions Pending Before Ie,Nrr & NMSS & Final Decisions by Directors Before Commission for Possible Review Listed
ML20209E439
Person / Time
Issue date: 05/08/1985
From: Lieberman J
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20209E443 List:
References
FOIA-85-584 NUDOCS 8505210596
Download: ML20209E439 (5)


Text

,pe =cg em3,5 k,

,f, /'

g..i UNITED STATES IdU'U v.

g-NUCLEAR REGULATORY COMMISSION c

r:Asmwcrow.c. c. rosss

% '****/

May 8,1985

[,*.,3 8

l MEMORANDUM:

James M. Taylor, Director Office of Inspection and Enforcement Harold R. Dentoa,I Di rector Office of Nuclear Reactor Regulation John G. Daiis, Director Office of Nuclear Material Safety and Safeguards TRCH:

James Lieberman, Director and Chit.f Counsel Regional Operations and Enforcement Division I

Office of the Executive Legal Director

SUBJECT:

STATUS REPORT ON PETITIONS UNDER 10 CFR 2.206 Enclosed is the most recent status report for petitions submitted pursuant to 10 CFR 2.206.

The status report lists petitions pending before IE, NRR, and NMSS and final decisions by the Directors which are before the

' Comission for possible review.

i s

f/A James Lieberman, Director and Chief Counsel -

Regional Operations and Enforcement Division Office of the Executive Legal Director

Enclosure:

Status Report cc-H. Thompson, NRR T. Rehm, EDO T. Murley, RI N. Grace, RII J. Keppler, RIII R. Martin, RIV J. Martin, RV

'J'. Axelrad. IE l

r

)

CONTACT:

Lillian Cuoco, OELD 492-7036 l0 s43#

  1. 'o 9

qwAm aq-f(cyl0'ficiaL Copf

i

/

i 1

2.206 PETITIONS PENDING BEFORE IE i

I I

i Date E00 l

Referred Control to IE Number Petitioner Facility / Action Requested Status 4/19/83 13018 Sensible Maine Power Maine Yankee / Emergency Final decision in (D.S. Miller) planning concurrence.

x 7/11/84 14585 Palmetto Alliance Catawba /Harrassment,,

Decision be.1 revised (R. Guild) intimidation QC inspectors;'

to respond *t icensee's4 violations of QA program -

position on petition.

Issuance of decision to be. coordinated.with

-enforcement action (EA-84-93).

8/7/84 14658 New York Public Interest Indian Point / Emergency Awaiting FEMA input.

Research Group planning and preparedness (J. Holt) 9/27/84 Ref.

Government Accountability Catawba / Issuance of $250,000 Being treated with 14585 Project civil penalty harassment Palmetto Alliance (B. Garde) of QC inspectors, petition.

i 12/24/84 000190 Vera English G.E. Wilmington (fuel In ELD and IE for review.

(M. Ratner, A. Schiller) fabrication)/ imposition Supplemental petitions of civil penalties filed 2/28/85, 3/12/85.

4/16/85 000523 Missouri Coalition for Callaway/ Qualification Acknowledgement letter, the Environment, Kay)Drey of construction and 10 CFR 50.54(f) letter (Alan S. Nemes, Esq.

operations quality to licensee in assurance personnel concurrence.

5/85 000602 Stanley Nietubicz Fermi Unit 2/ Emergency To be referred to IE.

planning s.

,-s.

.m.,,, s, d.

s.eue.

Scot _ch* T044 " Post 4t" Routing-Raquest Pad

[gif*':!

ROUTING -

EQU ST Please 5

READ To O HANDLE

/

l 0 Agenova pa w i s,.

FORWAaD y

O neruas O nese on oiscAno i

//,,

L O navi wi n ue l

[

o.i.

M E rrom

' W i

p

  • %)

s I

4 i

\\

lOwtc

,t UNITED STATES l

7., %

7 /

NUCLEAR REGULATORY COMMISSION

's.,

,f WASHIRGTON D.C. 20555 W

q Y

b che rfnkd, it i:

I Fi kfN b k E S

"eetaec B "

%[m ikuuL w

&]

O

,u7% W

s aw w an
(

awas nyedana l

GW

$ (f' (

m~

1" u

i i

i

~

I h

Nwu Forn f5-5 WY 1

.-s v

en. -

wo

..en.

ss..

s y ). -. 7 -

UNITE D STATES V5 '

f NUCLEAR REGULATORY COMMISSION

's 'sv /

WASHINGTON,0.C. 20555 M

f MHadadis a reprt l

k fu

+

i k f0V

^

i 6

a~

i

~ gfaks l

c%M 4

3

\\

\\

N rm sm: