ML20209E140
| ML20209E140 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/05/1986 |
| From: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Holmes G MHB TECHNICAL ASSOCIATES |
| References | |
| FOIA-86-197, RTR-NUREG-1150 NUDOCS 8609100062 | |
| Download: ML20209E140 (5) | |
Text
. Phr o,p s,.
UNITED STATES Sa neof,,D
/
NUCLEAR REGULATORY COMMISSION l g, -.
.o s
WASHINGTON D.
C. 20555 g-
..y e4.....,/~
SEP 0 51986 Mr. G r. e f. A H;>!m A n m.: 2ut+
' c re: u l 1 n i MHb l et h n i m i l As..v i :-i t t.
1723 Um1111..n Avenue, Gu i t.e K IN REGPONSE REFER San A ee, CA si l :' -
Tu FOI A-86 -197 Dear Mt iiv lmes :
~ Thin le in regard to your request, pursuant to the Freedom of Inf ormat.le t 'Ac t, to which the NRC assigned the above number.
..X._
T5is i.- a t.arti*tI res pon:s e to your request We will
- n.tify you upon completion of searub fer -ind review of any additional records subject to your request..
The statff has completed the search for nnu review of records subject to yvur request, and thio is t.he final-resevnse tv your request The NRC hus no recordu subject
- 0 your request.
_y,_
R*.:ords eubject t.o your request are available for public it:elme t.ien and copying e t. t.he NRC Public Document Room 3
(FDR), 1717 11 S t roet., NW, Washincton, DC 20555, as not.ed
<in ths enclocure(s)
The PDR accension number is identified beside each reeerd <bseeription
_1._
Rewrds subject
- o your request ar-being mede avullable for public inspect. ion and eupyinc at the NEC Publie D xument Room (FDR), 1717 H Street, NW, Washington, DC 20 J> 5 5, in the PDR file fvider under the above number and your name These records are listed on the enclosure (s).
W<
ar-enflusing ; n e t i u..
that pr.- i d e r i nf orma t.lun abou t charges and prue+-dur"s fer _bt.aining reevr Ja from t.be PDF Sincere);.
f t.g q.<: /Y //
W Dunnie H.
G r i :ir l ey, Direct.or rivision
? Rai.. and Records Offi;e o f Ahl n i: t.rn t i.an Euc l or.o r. l. n ) :
At a!4ted 8609100062 860905 PDR FOIA HOLMES86-197 PDR
Re: F0IA-86-197 Appendix A 1.
6/19/84 Memo for JBMartin from TWBishop re:
Results of Diablo Canyon Unit 1 Full Power Licensee Review Panel Considerations (8 pages) ANO: 8408070532 2.
9/28/84 Memo for DBeckham from RJPate re:
FY 1984 Operator Licensing Examinations (2 pages) AN0: 8410030187 3.
6/27/85 Letter from KFKirsch to JDShiffer re:
NRC Inspection of Containment Integrated Leak Rate Test, Diablo Canyon Unit 1 (6 pages) ANO: 8507230298 4.
7/30/85 Memo for File from Allegation Review Board re:
Diablo Canyon Allegation Review Board Meeting (35 pages) ANO:
8509040202 5.
11/14/85 Memo for File from Allegation Review Board Meeting re:
Diablo Canyon Allegation Review Board (23 pages) AN0:
8512020062 l
1
~
a Re:
F01A-86-197 Appendix B 1
1.
1/9/84 Memo for TMNovak from FRowsome re:
Transmittal of Assessment of PG&E Information Report on SISIP (8 pages) 2.
1/17/84 Memo for TMNovak from RWHouston re: Diablo Canyon Units 1 and 2 Low Pressure Injection Flow Alarm (1 page) 3.
2/17/64 Memo for HRDenton from JLiberman re: Mothers for Peace Petition Under 10 CFR 2.206 Concerning Diablo Canyon (6 pages) 4.
2/21/84 Memo for GKnighton from WHRegan, Jr. re:
Proposed Letter to Applicant - Diablo Canyon Nuclear Power Plant - Cultural Resources (3 pages) 5.
2/29/84 Memo for DGEisenhut from FJMiraglia re: Diablo Canyon: GE Magne-Blast Circuit Breakers (6 pages) 6.
3/1/84 Memo for GWKnighton from AThadani re:
Items for Inclusion in Letter Requesting Assistance from Region V in Assessing Acceptability of DCNPP SISIP (3 pages) 7.
3/14/84 Memo for ODParr from VSNoonan re:
Diablo Canyon Unit 1 SSER 20, Followup Item 5 (19 pages) 8.
3/16/84 Memo for VNoonan from 0Parr re:
Diablo Canyon 1 SSER 20, Followup Item 5 (1 page) 9.
3/23/84 Memo for JKnight from HPolk re:
Investigation of Anonymous Allegations 158 - 165 (2 pages)
- 10. 4/3/84 Memo for JMartin from DEisenhut re:
Diablo Canyons Systems Interaction Program (2 pages)
- 11. 4/9/84 Memo for TMNovak from WTRussell re:
Diablo Canyon Initial Test Program Changes (4 pages)
- 12. 4/9/84 Memo for JPKnight from REdackson re:
Diablo Canyon Seismic License Condition (1 page)
- 13. 4/12/84 Memo for Chairman Palladino, Commissioner Gilinsky, Roberts, 1
Asselstine, Bernthal from WJDircks re: Review of Diablo Canyon Piping Issues (enclosing report of review group, memo dated 4/12/84 for WDircks from RVollmer) (12 pages)
Re:
F0IA-86-197 Appendix B (cont'd)
- 14. 4/12/84 Memo for GWKnighton from REdackson re:
Draft Seismic License Condition for Diablo Canyon (5 pages)
- 15. 7/11/84 Memo for RHVollmer from JNTaylor re:
Effectiveness of QA Portion of the Diablo Canyon IDVP (5 pages)
- 16. 7/18/84 Memo for TMNovak from JPKnight re:
Supplemental Safety Evaluation Report Input Addressing the Allegations Contained in a Letter by GAP, Dated May 31, 1984 (TAC No. 54434) (2 pages)
- 17. 7/20/84 Memo for DGEisenhut from TWBishop re:
Diablo Canyon Unit 1 (DN 50-275) Construction Status and Operational Readiness Report (MC 94300) (54 pages) 18.
10/2/84 Memo for GKnighton from Glear re:
Diablo Canyon - Masonry Wall Design (6.pages) 19.
10/3/84 Memo for RMBernero, NJGrace, TPSpeis, HLThompson, RHVollmer from DEisenhut re:
Diablo Canyon Unit 2 Review (8 pages) 20.
10/10/84 Memo for DGEisenhut from RHVollmer re:
Diablo Canyon Unit 2 Review (3 pages) 21.
12/4/84 Memo for DFKirsch from GWKnighton re: Assignment of Allegations in July 31, 1984 GAP 2.206 Petition and Amendments (2 pages) 22.
12/7/84 Memo for HRDenton from JLieberman re: Amended 2.206 Petition RE: Diablo Canyon (6 pages)
- 23. 12/19/84 Memo for TMNovak from DMCrutchfield re:
Proposed License Condition and Safeguards SER Input - Diablo Canyon Nuclear Power Station, Unit 2 (13 pages)
- 24. 1/28/85 Memo for RSB Members from BWSheron re: Auto Closure Interlocks for PWR Residual Heat Removal (RHR) Systems (6 pages)
- 25. 1/31/85 Memo for GWKnighton from WPGammill re:
Diablo Canyon Allegations (3 pages) 26, 2/6/85 Memo for TMNovak from RWHouston re:
Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Additional Input to SER Supplement No. 29 (3 pages)
Re:
F01A-86-197 Appendix B (cont'd)
- 27. 3/4/85 Memo for TMNovak from RJBosnak re: Evaluation of Allegations on Diablo Canyon Units 1 and 2 (7 pages)
- 28. 3/5/85 Memo for TMNovak from LSRubenstein re: Response to Diablo Canyon Allegation No.1545, Auxiliary Systems Branch (7 pages)
- 29. 3/5/85 Memo for TNovak from RBosnak re: Evaluation of Allegations on Diablo Canyon Units 1 and 2 (5 pages)
- 30. 3/5/85 Memo for TI:ovak from RBosnak re: Evaluation of Allegation on Diablo Canyon Units 1 and 2 (13 pages)
- 31. 3/21/85 Memo for TNovak from JKnight re: Evaluation of Allegations on Diablo Canyon Unit 1 (3 pages)
- 32. 4/4/85 Memo for GWKnighton from DPCleary re: Diablo Canyon Allegations 1505 and 1506 (8 pages) 4
- 33. 6/17/85 Memo for TMNovak from WVJohnston re:
Safety Evaluation of Allegations 1513 thru 1518 (TAC #54434) Diablo Canyon (DCP),
Units 1 and 2 (5 pages)
- 34. 7/15/85 Memo for TMNovak from RJBosnak re: Evaluation of Allegations on Diablo Canyon Units 1 and 2 (12 pages) 4
- 35. 7/31/85 Memo for HRDenton from TPSpeis re: ACRS Comments on Seismic Program for Diablo Canyon (1 page)
- 36. 8/6/85 Note for HRDenton from GHCunningham, III re:
Diablo Canyon Unit 2 - Commission Decision Authorizing Issuance of Full Power License (11 pages)