ML20209E140

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request.App a & B Documents Documents Re Plant in PDR
ML20209E140
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/05/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Holmes G
MHB TECHNICAL ASSOCIATES
References
FOIA-86-197, RTR-NUREG-1150 NUDOCS 8609100062
Download: ML20209E140 (5)


Text

. Phr o,p s,.

UNITED STATES Sa neof,,D

/

NUCLEAR REGULATORY COMMISSION l g, -.

.o s

WASHINGTON D.

C. 20555 g-

..y e4.....,/~

SEP 0 51986 Mr. G r. e f. A H;>!m A n m.: 2ut+

' c re: u l 1 n i MHb l et h n i m i l As..v i :-i t t.

1723 Um1111..n Avenue, Gu i t.e K IN REGPONSE REFER San A ee, CA si l :' -

Tu FOI A-86 -197 Dear Mt iiv lmes :

~ Thin le in regard to your request, pursuant to the Freedom of Inf ormat.le t 'Ac t, to which the NRC assigned the above number.

..X._

T5is i.- a t.arti*tI res pon:s e to your request We will

  • n.tify you upon completion of searub fer -ind review of any additional records subject to your request..

The statff has completed the search for nnu review of records subject to yvur request, and thio is t.he final-resevnse tv your request The NRC hus no recordu subject

  • 0 your request.

_y,_

R*.:ords eubject t.o your request are available for public it:elme t.ien and copying e t. t.he NRC Public Document Room 3

(FDR), 1717 11 S t roet., NW, Washincton, DC 20555, as not.ed

<in ths enclocure(s)

The PDR accension number is identified beside each reeerd <bseeription

_1._

Rewrds subject

  • o your request ar-being mede avullable for public inspect. ion and eupyinc at the NEC Publie D xument Room (FDR), 1717 H Street, NW, Washington, DC 20 J> 5 5, in the PDR file fvider under the above number and your name These records are listed on the enclosure (s).

W<

ar-enflusing ; n e t i u..

that pr.- i d e r i nf orma t.lun abou t charges and prue+-dur"s fer _bt.aining reevr Ja from t.be PDF Sincere);.

f t.g q.<: /Y //

W Dunnie H.

G r i :ir l ey, Direct.or rivision

? Rai.. and Records Offi;e o f Ahl n i: t.rn t i.an Euc l or.o r. l. n ) :

At a!4ted 8609100062 860905 PDR FOIA HOLMES86-197 PDR

Re: F0IA-86-197 Appendix A 1.

6/19/84 Memo for JBMartin from TWBishop re:

Results of Diablo Canyon Unit 1 Full Power Licensee Review Panel Considerations (8 pages) ANO: 8408070532 2.

9/28/84 Memo for DBeckham from RJPate re:

FY 1984 Operator Licensing Examinations (2 pages) AN0: 8410030187 3.

6/27/85 Letter from KFKirsch to JDShiffer re:

NRC Inspection of Containment Integrated Leak Rate Test, Diablo Canyon Unit 1 (6 pages) ANO: 8507230298 4.

7/30/85 Memo for File from Allegation Review Board re:

Diablo Canyon Allegation Review Board Meeting (35 pages) ANO:

8509040202 5.

11/14/85 Memo for File from Allegation Review Board Meeting re:

Diablo Canyon Allegation Review Board (23 pages) AN0:

8512020062 l

1

~

a Re:

F01A-86-197 Appendix B 1

1.

1/9/84 Memo for TMNovak from FRowsome re:

Transmittal of Assessment of PG&E Information Report on SISIP (8 pages) 2.

1/17/84 Memo for TMNovak from RWHouston re: Diablo Canyon Units 1 and 2 Low Pressure Injection Flow Alarm (1 page) 3.

2/17/64 Memo for HRDenton from JLiberman re: Mothers for Peace Petition Under 10 CFR 2.206 Concerning Diablo Canyon (6 pages) 4.

2/21/84 Memo for GKnighton from WHRegan, Jr. re:

Proposed Letter to Applicant - Diablo Canyon Nuclear Power Plant - Cultural Resources (3 pages) 5.

2/29/84 Memo for DGEisenhut from FJMiraglia re: Diablo Canyon: GE Magne-Blast Circuit Breakers (6 pages) 6.

3/1/84 Memo for GWKnighton from AThadani re:

Items for Inclusion in Letter Requesting Assistance from Region V in Assessing Acceptability of DCNPP SISIP (3 pages) 7.

3/14/84 Memo for ODParr from VSNoonan re:

Diablo Canyon Unit 1 SSER 20, Followup Item 5 (19 pages) 8.

3/16/84 Memo for VNoonan from 0Parr re:

Diablo Canyon 1 SSER 20, Followup Item 5 (1 page) 9.

3/23/84 Memo for JKnight from HPolk re:

Investigation of Anonymous Allegations 158 - 165 (2 pages)

10. 4/3/84 Memo for JMartin from DEisenhut re:

Diablo Canyons Systems Interaction Program (2 pages)

11. 4/9/84 Memo for TMNovak from WTRussell re:

Diablo Canyon Initial Test Program Changes (4 pages)

12. 4/9/84 Memo for JPKnight from REdackson re:

Diablo Canyon Seismic License Condition (1 page)

13. 4/12/84 Memo for Chairman Palladino, Commissioner Gilinsky, Roberts, 1

Asselstine, Bernthal from WJDircks re: Review of Diablo Canyon Piping Issues (enclosing report of review group, memo dated 4/12/84 for WDircks from RVollmer) (12 pages)

Re:

F0IA-86-197 Appendix B (cont'd)

14. 4/12/84 Memo for GWKnighton from REdackson re:

Draft Seismic License Condition for Diablo Canyon (5 pages)

15. 7/11/84 Memo for RHVollmer from JNTaylor re:

Effectiveness of QA Portion of the Diablo Canyon IDVP (5 pages)

16. 7/18/84 Memo for TMNovak from JPKnight re:

Supplemental Safety Evaluation Report Input Addressing the Allegations Contained in a Letter by GAP, Dated May 31, 1984 (TAC No. 54434) (2 pages)

17. 7/20/84 Memo for DGEisenhut from TWBishop re:

Diablo Canyon Unit 1 (DN 50-275) Construction Status and Operational Readiness Report (MC 94300) (54 pages) 18.

10/2/84 Memo for GKnighton from Glear re:

Diablo Canyon - Masonry Wall Design (6.pages) 19.

10/3/84 Memo for RMBernero, NJGrace, TPSpeis, HLThompson, RHVollmer from DEisenhut re:

Diablo Canyon Unit 2 Review (8 pages) 20.

10/10/84 Memo for DGEisenhut from RHVollmer re:

Diablo Canyon Unit 2 Review (3 pages) 21.

12/4/84 Memo for DFKirsch from GWKnighton re: Assignment of Allegations in July 31, 1984 GAP 2.206 Petition and Amendments (2 pages) 22.

12/7/84 Memo for HRDenton from JLieberman re: Amended 2.206 Petition RE: Diablo Canyon (6 pages)

23. 12/19/84 Memo for TMNovak from DMCrutchfield re:

Proposed License Condition and Safeguards SER Input - Diablo Canyon Nuclear Power Station, Unit 2 (13 pages)

24. 1/28/85 Memo for RSB Members from BWSheron re: Auto Closure Interlocks for PWR Residual Heat Removal (RHR) Systems (6 pages)
25. 1/31/85 Memo for GWKnighton from WPGammill re:

Diablo Canyon Allegations (3 pages) 26, 2/6/85 Memo for TMNovak from RWHouston re:

Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Additional Input to SER Supplement No. 29 (3 pages)

Re:

F01A-86-197 Appendix B (cont'd)

27. 3/4/85 Memo for TMNovak from RJBosnak re: Evaluation of Allegations on Diablo Canyon Units 1 and 2 (7 pages)
28. 3/5/85 Memo for TMNovak from LSRubenstein re: Response to Diablo Canyon Allegation No.1545, Auxiliary Systems Branch (7 pages)
29. 3/5/85 Memo for TNovak from RBosnak re: Evaluation of Allegations on Diablo Canyon Units 1 and 2 (5 pages)
30. 3/5/85 Memo for TI:ovak from RBosnak re: Evaluation of Allegation on Diablo Canyon Units 1 and 2 (13 pages)
31. 3/21/85 Memo for TNovak from JKnight re: Evaluation of Allegations on Diablo Canyon Unit 1 (3 pages)
32. 4/4/85 Memo for GWKnighton from DPCleary re: Diablo Canyon Allegations 1505 and 1506 (8 pages) 4
33. 6/17/85 Memo for TMNovak from WVJohnston re:

Safety Evaluation of Allegations 1513 thru 1518 (TAC #54434) Diablo Canyon (DCP),

Units 1 and 2 (5 pages)

34. 7/15/85 Memo for TMNovak from RJBosnak re: Evaluation of Allegations on Diablo Canyon Units 1 and 2 (12 pages) 4
35. 7/31/85 Memo for HRDenton from TPSpeis re: ACRS Comments on Seismic Program for Diablo Canyon (1 page)
36. 8/6/85 Note for HRDenton from GHCunningham, III re:

Diablo Canyon Unit 2 - Commission Decision Authorizing Issuance of Full Power License (11 pages)