r
-
i
,
,
April 17, 1987
Docket Nos. 50-424
License Nos. NPF-61
/ Georgia Power Company
V ATTN: Mr. James P. O'Reilly
Senior Vice President
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRCINSPECTIONREPORTN0.50-424/87-01)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted
by L. Watson on January 5-9, 1987, and January 12-16, 1987.
The inspection
included a review of activities authorized for your Vogtle facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violation, references to pertinent requirements, and
elements to be includad in your response are described in the enclosed Notice
of Violation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by C. Julian)
8704290 $ h h424
Caudie A. Julian, Chief
Operations Branch
G
Division of Reactor Safety
Enclosures:
(See page 2)
k
c/
-.
.
.-
-
..
'
'
.
Georgia Power Company
2
April 17, 1987
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
A . E. Conway, Senior Vice President &
Project Director
i
d. Whitney,GeneralManagerProject
/. Support
D. Rice, Vice President, Project
VI. Engineering
H. Pinson, Vice President, Project
d. Construction
W. Hayes, Vogtle Quality
Assurance Manager
vs. B. Bockhold, General Manager,
j Nuclear Operations
A . Gucwa, Manager, Nuclear Safety
j nd Licensing
W. A. Bailey, Project Licensing
)(anager
t,6. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
I E. Joiner, Troutman, Sanders,
/.LockermanandAshmore
G. Ledbetter, Commissioner,
Department of Human Resources
!
d. H. Badger, Office of Planning
vd.andBudget
Kirkland, III, Counsel,
Office of the Consumer's Utility
h. Council
Feig, Georgians Against
Nuclear Energy
g B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
d r. O. H. Paris, Administrative Judge
4
!
Atomic Safety and Licensing Board
Panel
d A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
j
Panel
'
bec:
(See page 3)
'
-.
__
__
_ - - - . _ _ , . .
.
.
Georgia Power Company
3
April 17, 1987
.
cc w/encls:
. Reis, OGC
. M. Hill, IE
/ . Miller, NRR
J.Brach,ED0
M. Sinkule, RII
Ej Christnot, RII
WiRC Resident Inspector
Document Control Desk
State of Georgia
i
i
- i
.;.
RI
RIL
b
!A
v
on:es
MS y lock
MSink le
ljp/ /87
/87
/3
/87
j/ti
':
- , - _ _ -
.
- , _ . - -
- . . .
. - , ,
_.. , _ _ - . . . . . _ _
.
. - . .
. . .
.
. .