Summary of 870107 Meeting W/Util in Bethesda,Md Re Current & Near Future Status of Spds,Atws,Updated FSAR Revs,Reg Guide 1.97,station Black (USI A-44),seismic Qualification (USI A-46) & 24-month Operating Cycle.List of Attendees Encl
ML20209D307
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/20/1987
From: Mcneil S
Office of Nuclear Reactor Regulation
To: Thadani A
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-44, REF-GTECI-A-46, REF-GTECI-EL, REF-GTECI-SC, RTR-REGGD-01.097, RTR-REGGD-1.097, TASK-A-44, TASK-A-46, TASK-OR NUDOCS 8702040453
Download: ML20209D307 (5)


Text

_

January 20, 1967 Docket Nos. 50-317 and 50-318 .

MEMORANDUM FOR: - Ashok C. Thadani', Director PWR Project Directorate #8 Division of PWR Licensing-B FROM: Scott Alexander McNeil, Project Manager PWR Project Directorate #8 Division of PWR Licensing-B

SUBJECT:

SUMARY OF MEETJ W HELD WITH BALTIMORE GAS & ELECTRIC COMPANY CONCERNIWG CURRENT AND FUTURE LICENSING ACTIONS.

The meeting was held on January 7,1987, from 9:30 a.m. to 4:00 p.m. at the Phillips Building in Bethesda, Maryland. The attendees are listed in Enclosure 1.

Background

In an effort to further enhance communications and to mitigate any diffi-culties in their working relationship with NRR,-BG&E has requested that meetings be held on a monthly or quarterly basis to discuss current and future licensing actions and any concerns that may exist at that time.

Meeting Summary This meeting was conducted for the primary purpose of providing NRR with a brief overview of the current and near future status of the following licensing actions:

Safety Parameter Display System (SPDS)

Anticipated Transient Without Scram (ATWS)

UFSAR Revisions Regulatory Guide' (R.G. ) 1.97 Station Blackout (USI A-44)

Seismic Qualification (USI A-46) 24-month Operating Cycle.

In addition, the status of schedular commitments and any other items of NRR or BG&E concern were to be discussed.

The following significant points were made during this discussion:

SPOS was on fichedule, but the critical path item was the determination if the computer had adequate capacity to fulfill its function. The licensee expects to resolve this issue in early February 1987.

8702040453 PDR 87d120 P

ADOCK 05000317 PDR

The licensee will be submitting a letter requesting an extension to th required implementation dates for ATWS modifications on Unit 2.

In addition, BG&E has requested a meeting on-site with the technical reviewer concerning the currently outstanding ATWS RAI. The NRC agreed that this would be a good idea.

BG&E is unconvinced that a portable diesel generator will solve the problems presented by a station blackout scenario. A load study is currently underway to detrmine if it will meet the unit's needs. In addition, the probability and effects of station blackout related RCP seal failure have yet to be determined. BG&E recommended that a meeting be held with the NRC in the future to discuss BG&E's station blackout plans. The NRC agreed with this proposal.

BG&E stated that their commitment to submit the DCRDR supplemental reqport was a low priority and would need an extension of 1 year to June 1988.

Changes to 26 TS requirements applicable to both Units 1 and 2 are still to be submitted in excess of those already received to support the 24-month cperating cycle. These changes dealt with TS in the following areas:

Instrumentation Calibrations AFAS Containment Leakage Rate Tests Fire Protection Diesel Generators Reactivity Monitoring and Control.

BG&E stated in response to NRC concerns that they would attempt to ensure that they met oral commitments in a timely fashion and that submittals to the NRC would be mailed on the day or soon after they were signed.

/s/

Scott Alexander McNeil, Project Manager PWR Project Directorate #8 Division of PWR Licensing-B cc: see attached list PBD-8: PBD : PBD-8:

P Ner SA 11:jch AThadani 01 e/87 01 /87 Olho/87

r I

Mr. J. A. Tiernan --

i Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant cc:

Mr. William T. Bowen, President Regional Administrator, Region I Calvert County Board of U.S. Nuclear Regulatory Commission Commissioners Office of Executive Director Prince Frederick, Maryland 20768 for Operations 631 Park Avenue D. A. Brune, Esq. King of Prussia, Pennys1vania 19406 General Counsel Baltimore Gas and Electric Company Mr. J. A. Tiernan P. O. Box 1475 Vice President-Nuclear Energy Baltimore, Maryland 21203 Baltimore Gas & Electric Company P. O. Box 1475 Jay E. Silberg Baltimore, MD 21203 Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. M. E. Bowman, General Supervisor Technical Services Engineering Calvert Cliffs Nuclear Power Plant MD Rts 2 & 4, P. O. Box 1535 Lusby, Maryland 20657-0073 Resident Inspector c/o U.S. Nuclear Regulatory Commission P. O. Box 437 Lusby, Maryland 20657-0073 Bechtel Power Corporation ATTN: Mr. D. E. Stewart Calvert Cliffs Project Engineer 15740 Shady Grove Road Gaithersburg, Maryland 20760 l Combustion Engineering, Inc.

l ATTN: Mr. W. R. Horlacher, III Project Manager l P. O. Box 500 l 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Department of Natural Resources l

Energy Administration, Power Plant Siting Program ATTN: Mr. T. Magette Tawes State Office Building l

Annapolis, Maryland 21204 l

' ~

7 l- LIST OF ATTENDEES MEETING WITH BALTIMORE GAS & ELECTRIC COMPANY JANUARY 7, 1987 Name Affiliation Marv Bowman BG&E Alex Marion BG&E William McCaugby BG&E Larry Salyards BG&E Scett McNeil NRR Ashok Thadani NRR 1

1

-MEETING SIM4ARY DISTRIBUTION Licensee: Baltimore Gas & Electric Company

  • Cdpfes also ent to those people on service (cc) list for subject plant.

'IbsidliffFileZ^5%

"NRC PDR~~~

Local POR PBO#8 Reading A.~Thadani S.A. McNeil OGC-Beth E. Jordan B. Grimes ACRS (10)'

cc: Licensee and Plant Service List i~

l.

(

l i

i-L