Text
\\
20 APR 1987 Docket No. 50-354 Public Service Electric & Gas Company ATTN:
Mr. C. A. McNeill, Jr.
Senior Vice President - Nuclear Post Office Box 236 Hancocks Bridge, New Jersey 08038 Gentlemen:
Subject:
Discretionary Enforcement Relating to the "B" Hydrogen /0xygen Analyzer This letter is in response to your April 20, 1987 letter, requesting that NRC exercise discretionary enforcement in the case of the "B" Hydrogen /0xygen Analyzer at the Hope Creek Generating Station. A copy of your letter is attached for reference.
We have reviewed the basis for your request, and, noting the availability of the redundant channel, as well as the capability of the Post Accident Sampling System, an additional 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> period is granted for Technical Specification 3.3.7.5 for the specific case of the "B" Hydrogen /0xygen Analyzer. This period will expire at 9:37 a.m. on April 23, 1987. You will also note that this is less than the seven day extension you had requested.
You are reminded that, should either of the alternate methods described in the attached letter become inoperable, you shall immediately take steps to place the unit in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Cold Shutdown within the follow-ing 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
dditionally, in keeping with the NRC policy on discretionary enforcement, an extension beyond 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> will require an amendment to the Technical Speci. cations.
This extension, and the conditions detailed above, were discussed by Mr. Gallo of this office with Mr. S. Miltenberger, Vice President - Nuclear Operations, on April 20, 19L7.
Sincerely, l
00h $$$$jg PDR James M. Allan Deputy Regional Administrator
Attachment:
As stated 0FFICIAL RECORD COPY 6 NORRHOLM 4/20/87 - 0001.0.0 I
04/20/87 hN
\\
20 APR 1987 cc w/ enc 1:
R. S. Salvesen, General Manager, Hope Creek Operations A. E. Giardino, Manager, Station Quality Assurance W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic Electric Company L. A. Reiter, General Manager - Licensing and Reliability Rebecca A. Green, Bureau of Radiation Protection Public Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New Jersey bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief Robert J. Bores, DRSS T. Murley, NRR W. Butler, NRR G. Rivenbark, NRR J. Taylor, EDO J. Partlow, NRR B. Boger, NRR D. Holody, ES J. Gutierrez, RC b
RI.\\
P R.
AI:DRP
- DRP R
RS R-olm/rhl G
o ollins e
Johnston lan 4/L /87 4/f/87 4/go/87 4/1d/87 4/N/87 4h87 O
0FFICIAL RECORD COPY 6 NORRHOLM 4/20/87 - 0002.0.0 04/20/87