Text
-.
m NUCLEAR REACTOR LABORATORY 6,, gh j
AN INTERDEPARTMENTAL CENTER OF MASSACHUSETTS INSTITUTE OF TECHNOLOGY l
JOHN A. BERNARD 138 Albany Street, Cambrdge, MA 02139-4296 Activshon Analysis j y Director Telef ax No. (617) 253-7300 Coolant C* 2rrustry
~
i Director of Reactor Operatsons.
Tel. No. (617)
Nuclear Mechcene
), )
Pnncipal Research Engineer 253-4202 Reactor Engeneenng l
{-b I
i j j
July 8,1999 l
l 4
y Nuclear Regulatory Commission
[g Attn: Document Control Desk 5
Washington, D.C. 20555 h
Subject:
The renewal of Operating License No. R-37, Massachusetts Institute of Technology
(
l Research Reactor, Docket Nc. 50-20.
j Gentlemer,,
The Massachusetts Institute of Technology hereby requests renewal of Reactor Operating h
U License No. R-37. In addition, an increase in reactor power from 5000 kW to 6000 kW is
> r requested. Enclosed per your letter of 24 August 1998 are the following:
1 4
,1 1.
Updated Safety Analysis Report (SAR)
{
2.
Financial Qualifications f
l
/
3.
Environmental Report 4.
Technical Specifications
/
5.
Operator Requalification Program 4g t
Neither the Emergency Plan nor the Physical Security Plan are enclosed because no j
changes are mquested at this time.
i The following should be noted relative to the above submission. First, the format used for the SAR was NUREG-1537 with the exception that all coolant systems are described in Chapter 5 (as opposed to Chapters 5 and 9) and information on nuclear medicine is in a separate section, Chapter 17. Second, financial information on the MITR is contained in Chapter 15 of the SAR. In addition, a copy of MIT's latest financial statement is enc:ased.
s If our request for a power upgrade is approved, we will prepare and submit a plan for monitormg the pc?ver ascension.
l 9907120281 990708 DR ADOCK 0 yo emwm
18 %
I;w q
h 1
Please contact Dr. Hu or Dr. Bernard at (617)258-5860 or (617)253-4202, respectively, should you require any further information.
i.
L l
Sincerely,.
.(d Lin Wen Hu John A. Bernard Reactor Relicensing Engineer Director z
/
David J. Litster Vice-President for Research Senior Project Manager, cc:
USNRC NRR/ONDD Region I-Project Scientist USNRC Effluents Radiation Protection Section (ERPS)
FRSSB/DRSS j
)l