ML20209C507

From kanterella
Jump to navigation Jump to search
Rev 3 to TVA Employee Concerns Special Program:Painting Requirements Re Welds
ML20209C507
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/23/1987
From: Bateman R, Joyce J, Rose J
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20209C049 List:
References
WP-08-SQN, WP-08-SQN-R03, WP-8-SQN, WP-8-SQN-R3, NUDOCS 8702040283
Download: ML20209C507 (22)


Text

.

TVA INPIAYIE CONCERNS REPORT NUMBER: WP-08-SQN SPECIAL PROGRAN REPORT TYPE: Welding Project REVISION NUMBER:

3 TITLE: Painting Requirements Related To Welds REASON POR REVISION:

Revised Corrective Action Plan - Attachment 6 SWEC SUNNARY STATENENT: N/A PREPARATION PREPARED BY:

Original Signed By J.'E. Rose 8-25-86 SIGNATURE DATE REVIEWS PEER:

Original Signed By R. N. Bateman 8-25-86 SIGNATURE

.DATE hf TECHNICAL REVIEW ONLY TAS ddi fit 67 b##M SIGNATURE DATE CONCURRENCES Oritinal Signed By CEG-H:_ L. E. Martin _

9-03-86 SRP:(h.L,,Js fu G)~df

/-2327 SIGNATURE DATE

/

SIGNATURE *((

DATE APPROVED BY:

MUSA -

ne-si NiA ECSP NANAG9R DATE /

NANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY)

  • SRP Secretary's signature denotes SRP concurrences are in files.

2242T 8702040283 870127 DR ADOCK 05000327 PDR

r WELDING PROJECT GENERIC EMPLOYEE CONCERN j

EVALUATION REPORT REPORT NUMBER: WP-08-SON, R1 DATE 08-26-86

SUBJECT:

PAINTING REQUIREMENTS RELATED TO WELDS CONCERNS CONSIDERED:

IN-85-273-001 IN-85-192-002 EI-85-059-001 IN-85-451-001 PREPARED BY

  • b.

b26

, OC, WP Ent_;

REVIEWED BY D

t'a5 M(o

. OC, WP n

REVIEWED BY ML dd

, QA, WP oc REVIEWED BY N

4

, CEG-H, WELDING A

r f

LM

, PROGRAM MANAGER APPROVED BY l

i v

(

=

Revision 1 incorporates comments made by the Senior Review Panel on 8/19/86.

I C

00270 s'

GENERIC ENPLOYEE CONCERN SUNNARY SHEET Report Number: WP-08-SON. R1 Report

Title:

PAINTING REQUIRENENTS RELATED TO WBl.DS I.

CONCERNS CONSIDERED:

IN-85-273-001 IN-85-192-002 EX-85-059-001 IN-85-451-001 II. ISSUES INVOLVED 1.

Welds over six feet off the floor have not been painted in the Reactor and Auxiliary Buildings.

2.

Unpainted welds are in evidence on conduit and pipe supports in the Reactor Building.

3.

Hanger welds should be painted as soon as they are finalized by QC.

4.

Rust causes welds to be weakened.

5.

Sandblasting removes metal from welds.

g-III. STATENENT OF CONCERN / ISSUE VALIDITY Validity: Y I

,N

, Substantiated: Y I

,N IV.

EFFECT ON HARDWARE AND/OR PROGRAN None V.

JUSTIFICATION Features are painted in accordance with engineering drawings and specifications.

VI.

RECOMMENDATION'AND/OR CORRECTIVE ACTION NEEDED

  • Completion of the protective coating reinspection and resultant corrective action under SQN-CAR-86-01-001 for Issues 1, 2, and 4.

VII.

REINSPECTION NEEDED: Y

,N

  • I VIII.

ISSUE CLOSURE By this report.

O Page 1 of 2 00270

- ~

l

~

~

WP-08-SQN, El

)

h II. ATTACNNENT 1.

Text of Employee Concerns 2.

SQN-CAR-86-01-001.

3.

Nemo from P. R. Wallace to C. R. Brimer dated 2/18/86 (S01860218833).

4.

Memo from B. N. Patterson to P. R. Wallace dated 4/7/86 (S01860403923).

5.

Memo from P. R. Wallace to H. B. Rankin dated 4/8/86 (S53860407930).

9 i

O.

I Page 2 of 2 00270

GENERIC ENPLOYEE CONCERN 1

Report Number: WP-08-SON. R1 Report

Title:

PAINTING REQUIRENENTS RELATED TO WELDS I

I.

SCOPE OF EVALUATION L

This engineering analysis covers the following WBN concerns determined to have possible generic implications at SQN:

IN-85-273-001 i

IN-85-192-002 EI-85-059-001 IN-85-451-001 II.

ISSUES ADDRESSED BY CONCERN (S)

Each concern was analyzed to determine the issues voiced by the concerned individuals. These issues are as follows:

1.

Welds over six feet off the floor have not been painted in the Reactor and Auxiliary buildings.

l 2.

Unpainted welds are in evidence on conduit and piping supports in L

the Reactor Building.

Ib 3.

Hanger welds should be painted as soon as they are finalized by QC.

4.

Rust causes welds to be weakened.

5.

Sandblasting removes metal from welds.

i III. CONCERN VALIDITY OR SUBSTANTIATION The prime consideration for application of protective coatings in l

nuclear facilities is one of effective prevention of build-up of l

radioactive contamination on the building, structures, components.

l and systems of the facility. A secondary consideration is to provide lR1 a smooth, impervious surface (via a paint system) which will permit l

subsequent decontamination activities. These two considerations are l

effectively met by using nuclear grade coating systems.

Using these l

basic considerations and additional environmental conditions, l

protective coating requirements are established by the Office of Engineering (OE) for every feature in the powerhouse. These requirements are transmitted to the Office of Construction (OC) or Nuclear Operations (NO) via drawings and specifications. The implementing organisations (OC or NO) cost the features based upon environmental conditions which that particular area will experience in plant operations. Not all areas are required to be coated.

A 4

Page 1 of 2 00270 v-wam-----

,-w.,,,,w-,--,-,,

,n-m--,

,.,--pn.-..~--,-wr.

,,,,nm-

__wn-e._..-,n,,,--

--e


n-,--

WP-08-SQN, R1 P!-

The general nature and large scope of issues 1 and 2 prevents a l

direct physical inspection of the Reactor and Auxiliary Buildings by l

Welding Project Ivaluators. A correspondence search and discussions l

with the Division of Nuclear Quality Assurance revealed that a comprehensive l l

reinspection of protective coatings has been initiated as the result l

of a QA survey.

The results of this survey are documented on lR1 SQN-CAR-86-01-001. An integral part of this reinspection program l

will include a 100 percent baseline coating inspection of the Level 1 l

and 2 coating areas at SQN. SQN-CAR-86-01-001 describes the details l

of the deficiencies in the Protective Coating Program. Coating l

deficiencies are being identified and appropriate corrective actions l

are being established which address both program deficiencies and l

repairs to coated features.

l There are no requirements which mandate a particular sequence of construction or modifications activities. The schedule is determined using prudent engineering judgement. OC or NO accomplishes coating operations based on a schedule intended to maximize efficiency in construction or modification activities.

All metallic materials oxidize (rust) to varying degrees. The engineering analysis of the need for coatings takes this characteristic into account. When a surface requires coating, the rust is removed.

l Removal is primarily by sandblasting which has been and continues to be p*~

an industry-wide acceptable method of preparation of metallic features l

for painting. The metal removed in this process is minimal.

In summary, the resolution of each issue is as follows:

Issues 1, 2, and 4 are closed pending completion of protective coating reinspection and resultant co.rrective action under SQN-CAR-86-01-001.

Issue 3 is closed because it is an observation of prudent construction practices.

Issue 5 is closed because the practice of sandblasting is an accepted practice in preparation of metals for painting.

l C

Page 2 of 2 00270 1

...lli. ~

______ZZZJ:

L W CCi1 3 [h

{

'04/03/88 CEMPLOYEE CONCERNS)

P:go 1 cf 2 08:40:27 i, LOC STATUS RESP

-GTC-PPP CFR INSP TC ------CONCERN-------

. PROBLEM, 10 i

413 NSRS 20 SR IN-BS-273-001 WCMHS ib/WORDS:

MISCELLANEDUS WELD RUSTING X: W Y: C, 2: N IN UNIT 1 REACTOR AND AUX BLDSS., WELDS ON PIPE SUPPORTS, SPECIFICALLY PIPE SUPPORTS INSTALLED DVER B FEET OFF THE FLOOR, HAVE NOT BEEN PAINTED AFTER i

SUPPORTS WERE COMPLETED AND QC ACCEPTED. CI IS CONCERNED THAT RUST / CORROSION WILL OCCUR TO THESE UNPAINTED WELDS AND WEAXEN THE PIPE SUPPORTS THUS PREVENTIG THESE PIPE SUPPORTS FROM PERFORMING INTENDED FUNCTIONS THEY WERE DESIGNED FOR.

CI DID NOT SPECIFY ANY PARTICULAR AREAS IN REACTOR BUILDING BUT STATED THAT PI[

l SUPPORTS FOR FIRE PROTECTION SYSTEM IN AUX BLDG SHOULD BE LOOKED AT.

l CONSTRUCTION DEPT. CONCERN. (NOTE: ERT IS ACTIVELY INVESTIGATING THIS GENERIC CONCERN UNDER DIFFERENT FILE NUMBERS.)

TECHNICAL COMMENTARY:

i ISSUE CONSIDERED: UNPAINTED WELDS ARE RUSTING.

LOC STATUS RESP

-QTC-PPP CFR INSP TC ------CONCERN-------

PROBLEM ID 182 NSRS SR IN-BS-192-002 WCDPS l

j KEYWORDS:

MISCELLANEOUS WELD RUSTING X: W Y: C 2: N NUMEROUS UNPAINTED WELDS ON CONDUIT AND PIPING SUPPORTS THROUGHOUT PLANT ARE STED. POSSIBLE LACX OF PROTECTIVE C0ATING. EXAMPLE: REACTOR BLDG UNIT 1 AZ.

i l DEGREES,.EL 720'.

TECANICAL COMMENTARY:

ISSUE CONSIDERED: UNPAINTED WELDS ARE RUSTED.

LOC STATUS RESP

-QTC-PPP CFR INSP TC ------CONCERN-------

PROBLEM io SR EX-BS-OSS-001 WCPTI XEYWORDS:

MISCELLANEDUS WELD RUSTING X: W Y: C 2: N WHY AREN'T MANGER WELDS AND PIPE WELDS PAINTED AS SOON AS THEY ARE FINALI2ED BT THE QC INSPECTOR AS COMPLETE AND ACCEPTABLE.

THE DELAY CAUSES WELDS TO RUST, AND THE PASSAGE OF TIME OR THE PROCESS OF CLEANING THE WELDS MIGHT BREAX THE "PINX" PAINT ON BOLTS.

RUSTING WEAXENS THE WELDS AND SANDBLASTING WILL REMOVE METAL, AND IS AN UNNECESSARY STEP CCOST) IF WELDS WERE PAINTED IMMEDIATEDLY.

(CONSTRUCTION DEPARTMENT CONCERN).

C/I HAS NO MORE INFORMATION.

TECHNICAL COMMENTARY:

ISSUES CONSIDERED:

1. UNPAINTED WELDS ARE RUSTED. CREPORT WP-08-SON)
2. TORQUE PUTTY COULD BE DAMAGED. C s

--r--.

Attrahment 1 t

'64/03/86 CEMPLOYEE CONCERNS)

Pago 2 cf 2

'OS:40:27

' LDC STATUS RESP

-QTC-PPP CFR INSP TC ------CONCERN-------

PRDBLEM ID A

ERT 20 SR IN-BS-451-001 WCMHY

. 5.

AZtWORDS:

MISCELLANEOUS WELD RUSTING X: W Y: C 2: N CI STATED IN 1984 THEY CPAINTERS) WERE INSTRUCTED NOT TO PAINT ANYTHING ABOVE S FT. IN RBI, PRESENTLY,THERE ARE RUSTY WELDS THROUGHOUT.

TECHNICAL COMMENTARY:

ISSUE CONSIDERED: UNPAINTED WELDS ARE RUSTED.

.. r,k, o

S l

l l

t G

e

W &=

e.,,s6NP iCORRECTIVE ACT10ll REPORT i

AI-12 Pego 14 of 16 Roy. 20 REPORT NO.

so

' CAR l86 01OTINITIATEDBY Clifford A. Crownover DATE 1/24/86 i

PLT.

CAR IYR MO NO REQUESTED BY (IF APPLICABLE)D. C. Craven /

h

)

YES ASSIGNED TO P. R. Wallace m.e AD/ERSE C00lTIW:

The Protective Coating Program as described in nI-10.14 (Rev.173 does not adequately implement the requirements contained in Section 6.2 of the FSAR, Construction Specifications G-55 (dated 9/17/84), G-14 (dated 8/29/84), and Architec-tural Design Standard DS-A.9.8.1 (dated 2/4/85).

(See Attachment for details.)

Reference Survey 21-86-S-002.

ROOT jf,e.

CAUSE (CAUSE ANALYSIS REQUIRED 8 NOT REQUIRED C:

. c.

..,m 1

CORRECTIVE ACT10tl (1)' REMEDIAL CORRECTIVE ACTIONS (S)

Sc4 Arracam N

-i!

d $

it Cf.

ESTIMATED CG4PLET!0fl DATE A-d M,Vt%

F a

-J a.

~

(2) ACTION (S) TO PREVENT RECURREtiCE d hh see A,wwo a

e m

~

~

EST!!%TED CCMPLETION DATE T4 W,WC4 o.

APPROVAL:

THERESOLUTIONOFTHEABOVEDESCRIBED~AINERSECONDITIONISAC RECOFMENDED BY Wlk PORC CHAIRMV1

,(F3R SIGrilFICANT PLANT CARS ONLY) DATE l

APPROVED BY

< > Xwe dI c.'

% Ie&,"./."T b'OR/ SITE DIRECTOR DATE l

CQ4PLETION - CORRECTIVE ACTION WAS COMPI.ETED ON.

AND IS READY FOR VERIFICATION BY QA.

RESPalSIBLE SUPERVISOR DATE VERIFICATION - CORRECTIVE ACTlal TAKEN AS DESCRIBED ABOVE OR WITH THE FOLLOWitJG DEVIATIONS

  • VERIFIED BY

/

DATE QA REP CLOSED BY_

q4 SUPERVISOR DATE 0043A/ mbt

'g i

'~

,a

~

a ggg gg; Page 2 of 4 in' 1.

The responsibility for these deficiencies involves various groups and organizations. Since these deficiencies all relate to the site Protec-2 tive Coating Program, it was determined that resulting corrective actioK~

~

would be more effective if tracked and handled under one corrective action report.

2.

Presently, there are m Nuclear Power upper tier documents describing a Protective Coating Program. The references to G-Specifications and Architectural Design Standards within this CAR are applicable because the notes on "As-Constructed" Drawing 46W466-1 refer to Construction Specifications G-41, G-42, and G-45 which were canceled. The index for -

Construction Specifications states that G-41, G-42, and G-45 were replaced by G-55.

C-55 refers to G-14 for selecting, specifying, applying, and inspecting architectural paints and coatings. G-14 refers to Endes Architectural Design Guide DG-A9.8.1 regarding Nuclear Service Level I applications.

l

?(a 1

  • e

v r.

Attcchment 2

.',v.

Pcgo 3 cf 4

~

,t..

3 1.

Contrary to the 'FSAR Section 6.2.1.6 no program.has been established

..,0 or implemented at Sequoyah to account for unident'ified/ uncontrolled coatings which have been applied to components installed in Level I coating areas.

(e.g., Coatings on vendor supplied equipment such as motors -

or junction boxes. Specifically, some instrument panel mounting plates -- -

to be installed in a Level I coating, area were coated using unapproved coatings (on MR A-564799) as specified on TVA drawing 46W600-23 without consideration for their impact on the percentage of unapproved coatings within containment.)

a.

MI-10.14 does not require the use of specific types of protective coatings for application on certain equipment as delineated in Section 6.2.1.6 of the FSAR.

(e.g., RCP motors, accumulators, stesa generators, etc.)

S O

. Corrective action must include:

(1) an evaluation (USQD, NCR,.

NOTE:

etc.) of any installation of unidentified coatings which asy not i,'

have been accounted for and (2) correction of drawings (i.e.,

a 46W600-23) which specifies use of an unapproved coating on

" ".i.

equipment to be installed in a Level I coating a'rea.

~;,

2.

MI-10.14 does not adequately implement the requirements of G-55, G-14, FSAR Section 6.2, and Architectural Design Standard DS-A.9.8.1.

Examples:

l v

a.

No definitions are contained in MI-10.14 to identify Level I and (f6 Level II coating areas as specified in Architectural Design Standard DS-4.9.8.1.

Additionally, MI-10.14 does not list those Level I coating surfaces which are located outside containment.

(For example, reactor coulant makeup water tank, essential air system tank interiors, emergency diesel fuel storage tank interiors, con-densate storage tanks', and chemical and volume control system /RCS makeup system tank interiors).

5 b.

Periodic surveillance' inspections of Level II coating system main-tenance are not specified in MI-10.14 or performed as required per Section 8.1.1 of G-55.

c.

MI-10.14 does not ensure that coatings which have been stored at 0

low temperatures are brought up to 70 F minimum before application as required in Section 4.3 of G-55.

d.

MI-10.14 does not implement the requirements for adhesion testing that are specified in Section 5.4 of G-55.

MI-10.14 does not require the use of the "Tooke" gauge for verifying i.

e.

adequate dry film thickness for substrates, which are not carbon steel as required pe'r Section 4.5 of G-55.

q NOTE:

Carbon ~ steel substrates are checked using a magnetic gauge.

4 L

3 f

'l.

e w

g

,mmg.,,

3--.

--,,,,,mc4,,

,y,

.____,,w,_,,,

P '.

Attac} ment 2 g!.y#

P:go 4 cf 4 P

~

's

~

l P

't../

f.

HI-10.14 references Construction Specifications G-41, G-42, and

(

.G-45 which have been canceled. Additionally, the SQN Protective Coatings Maintenance and Repair Manual is referenced in MI-10.14 1

but has not been approved (by PORC, etc.).

3.

Notes on Drawing 46W466-1 hav,e not been kept current to incorporate changes to Construction Specifications.

(For example, drawing notes contain references to G-41, G-42, and G-45 which have been canceled.

Attachment Cs to AI-25 were submitted during the performance of Survey 21-85-s-015 to correct this specific problem.)

Corrective actions should address not only those actions taken to correct these specific deficiencies, but also actions taken to further identify and correct other deficiencies within the Protective Coatings Program.

e S

9 Q:

e 0

.e o

e e

t e

1 g

4 r

4 4,

4

m he.

m n 02210 0

=

S01 860218 88S i

==== suiss omvenemsne

[

qMemorandum rzwwnssus nuzr wmomr t

iA p

(m

p. a. vallace, elaat saeagee, car. ros-r. sees.yah sect.e, elaat
c. a. sei ec, saangee, site services, our. is a. se,.eyan salear clast

,wm

==,

FEB 181986 srsJacT: 88QcofA5 usCLEAR FlaNT 1805) - mRRECTITI ACTION E87087 ICatl 30.

SQ-CAR-se-41-401 - EATS 30. 8461 - PROTECTIVE COATING PROGRAE ne followies analysis and corrective acties is belas done la order to correct all defleteacles identified in CAR No. SQ-CAS-86-01-001.

Boot Cause &aalysis ne costles probleme identified by this report were caused by the lack of a controlling apper-tier document for costles repairs and malatsasace.

Construction specificattees and procedures were adequate for the sov appilcatlee phase of the plaat, het they did not address all the aspects b

associated with repairlag and malateinlag the critical costlage estlet years of service. Additional F8AR requirements were set lacorporated v

late the plaat program.

T Corrective Actica T

1.

A new SQH is belas prepared to provide control of all precedures, methods. responsibilities. and documentation of all aspects of surface preparatica, costlag applicatlos and salatestate of all

{

to critically coated areas at SQN. H is apper-tier document will g

incorporate the requirements of all applicable G-specifications.

t-L-

M destga guides and standards, and as-coastructed dravlags and will establish procedores for decanesting templicate with sectica s.2 of g

the F8AR.

O 2.

In addittee to the laplementaties of a now SQE. which will provide C

overall progran centrol for aselear protective coatings. etter esisting mis will be revised as rogstred to comply with and support I

the new SQE. Included la these revisions will be a major revistos to NI-10.la, which will correct all of the deficiences addressed by the CAR. New procedures ul11 be issued as regatred to provide saadatory perledic serveillance laspections of all critically coated areas and to costrel a documentation leg of all secontrolled costlags laside primary costelament.

Attless to Prevent Betcarrence no implementaties of the program described above should correct all defieleacles seted by the Cat and shes14 provide complete control and consistost progres guidance to correct other deficleacles that may esist sad prevent roccurrence of problems of this satsre.

b Buv u.s. Sevines Roads Regularis en ska revrou Sesenes rios E

.~

=n

-r.

~-

.v_,__

2 P. R. Wallace SEQOOTAE NOC12&R FLANT (SQN) - CottRCTIVE ACTION REPORT (CAR) 50.

SQ CAR-86-01 001 - RATS NO. 8461 - PROTECTIVE COATIBG FROGRAN Attached is sa estilse for a reelsed acclear progres et SQN that will laclude all conceras addressed by the Neclear Safety Beelow Staff and the Quality Assurance Staff en Cat No. SQ-Cat-86-01-001.

C. R. 8rimer

F Ltt:RC Attachment cc (Attachment):

IIRS. MR 4N 721-C g

v This was prepared prlacipally by L. 5. Rogers.

T T

c3 M

o O

O e

e F

180C 5

A 4

4 0

8 T

2 1

1 1

1 2

S

/

/

/

/

/

/

E 4

3 3

2 3

2 no i

)

t s

e a

r s

s o

s r

e r

r t

r) y o

sg e

e O

w ow esp t o g

g T

o' ge l yr uR o

o r

ol aao t(

B R

D B

t e tH c S

/

/

E

/

( e S/ n

/ n n

n N

6

/f

/ sI) yo o

o C

r s

sr s

et t

t I

e t s t e4 y l w w

w S

g ay ag4 a ae e

e S

o t a t o M

t r r

r A

t SM StC(

SB B

B NO F

d I M e

TE A

d CT d

B A

8 A

AI 1

A 2

2 3

3 n

M o

S f

A i

C od R

t E

nd G

pf P

nae O

io S

o

,l R

r hi l

P D

cn Cst so s

d E

so; i arrg r

n G

S eis nl cot o e

a n

N S

dt a ibit nl l

o s

3 T

R mnrosti ect o

n m

i m

I E

ief af c o b

g s

t e

A D

aiA est pnp r

i e

c l

O D

rf niers um p

t n l

e b

4 C

A geI oc en e

so b

p o

odIi n;ci&s t

ei o

s r

E Y

r t e.

e n

tt r

n p

1 V

C pg&at c;, s e

a p

i I

N n

cst gsrs m

l c g

T E

gi I i i enreg e

ai e

t n

een r

if g

s i

C I

nd f s

.i nt ni u

ri a

l t

4 E

C iuli n T

I tl eroRi nit c

et r

u s

O F

acvacA aiga o

t r o

g i

R E

onel nS rano r

ae t

e s

P D

CiLciFt pec P

Mc S

R E

R 3

A E

Y L

T C

I 3

U R

)

)

)

)

)

)

N O

1 3

3 1

3 0

R

(

(

(

(

(

1 I

(

P

.sn 0

neo n

f &.

oei

.A o

e o

it t gQ i

v 1

i s

tI p n

d t

t m lt c

i if n

c ca or egr l o a

e t

er ra pnc s

d p

t g tP sis n

ng e

s oo n

nme o

an c e n

rr o.

I rD PP Cs o/&ti Hi nc I

p yan t s

.fl u

.pl rl a ea rg yae t nest eia ol n an tl c pov ei ghi ti e inir E

ei iri icegt aSr a et l e L

l t l ev e

L ns r

e d v n et T

cs at r cn ab odt nri si I

uo uoe eoAh u t na a ua ar T

NC QnS RNCCS sam MSM BC 5

4 1

6 1

3 M

A s

s T

Q Q

I I

M M

N S

S A

A P

P E

U w

V V

V V)

V)

R

)

)

)

)

C e

E E

E E

E O

N R

E E

B R

D

(

(

(

(

(

(

l 1

1

) 13:i3 4 144

.t Perform Baseline Determine present status 3A Rogers /OE elle Evaluation Identify Priority Determine present etstus 3A Rogers /0E 5/14 Items (REV) It! 10.14 Application Repair (2)

Future repairs 2E Brewton/ Rogers 3/14 of Protective Coating in the l

1 Reactor and Auxillery Bid *g (RET) Drawings All DWG's Relating (3)

E Isting discrepsacles tantin 7/14 to Coatings IQT (Materials) Paint & Equipment (2)

Contingency for emergency 4A Brewton/ Rogers Fil IQT (Services)

Contractor Repairs (2)

Contingency for emergency 48 Brewton/Bogers 7/1 Emergency Coating Inspection /

(1)

Basellne inspection ab Brewton/ Rogers 2/14 Contract NSBS Comuments/

(1)

Resolve open NSRS/ Employee Rogers /Geetchess 2/14 Employee Concerns Concern issues l

8804000276 80 1 860403 923 m-UNITED frATES OOVERN:lENT Memorandum rze== v4u27 AUNOMY TN

  • P. R. Wallace. Plant Hasager. ONP. P00 2. Sequerah Betteer Plaat "O " '

S. R. Fatterson. Superlatendent. Malatesance. OEP F08-2. Segeeyan teclear F1sa/7/n t

c'"

n araJECT:

SEQUOYAN NUCLSAR PLMrf (3Q5) - UNFAINTED MANotRS AND STRUCTURAL STEEL ORES SII FitT A80ft THE Fih0E - EMPLOftt CONCIRE NO. IN-85-243-402-8M' teforence: Remorsadun to you from N. L. Abercronele dated Febross? 13. 1986 "Reccanessations Generated Free the Generic Conceras Yast Force That sequire Action by four Orgaalastles" (300 860207 800)

Employee Concera 54. IN-85-243-002-SEP refers to a complete lack of coating en steel over 6 feet from the floor at Watts Bar Nuclear Flaat. This condition does set esist at SQN although some isolated areas are ancested er damaged.

M As part of the response to SQ-CAR-si-01-001, a comprehensive protective ccatings program was established. As fotogral part of the program is to g

perform a 100 percent baselles coating laspection of the levels 1 and 2 y

costlag areas et SQN. This inspectica will lattiste repolta of areas erith degraded costlag by means of the costlags preventative malatenance program.

N It is my position that our laspection and malatensace program is sofficleat to address the concerns and recommendations of this generic costera.

C*

C

8. M. Fatterson U

^

C3.B:W5V:DFO:MC

[

cc afM. MR 4M 721-C1 g

O fnis was prepared principally by

toss, COORDINATION: Check E. Browtos/ Electrical Relatessace. Sequerah Laasos E. Rogers / Nuclear Services Welding and Meta 11 arty Sectica, is SS 1110-C 4/7/86 - Dc:

H. L. Abercroncie. ONP, 0&PS-4. Sequoyah w/45D (attached)

Bus U.f. 5ssin es Beeds Regelsely en she reyed Seeinst non

= ~*wq g_ H. L. Abercre le t

4/pfos grry:

- m. A se =

Site Director O e. O n e 01P5-4. 50tt

.D - n =-.~.

a P. R. Wallare 4%fv

{- {a

_j Sequoyah Nuclear Plant

.. _._q ji

%M M. % 6..

l o :-,

su m -- - "" 5

_ Re:

50N - UNPAINTED HA3GEDS NID SIkuf.fuP At STEEL OVER SIX FEET ABOVE THE Ft 00R.

EMPLOYEE CONCERN fl0.

IN-95-?41-033'LP Plesse find attached cur reinenea

,m en n.

subject emolovee eenrern Attachment a_

PV cc:

Reg. Engineering Sectton - SQN n..

M N

7 d.=

[L

[l.

[L C

O-.

s,mr_==re,=

p

= a es e ====u.a..

...no u -

L.,

  • w

.w.

N*

co

e. m

~ww..,;1 7-

_,y,,

,5

< ?

)

3

\\

n m W :

.'s m v-== ns a I

l-

~

~ :f. 3.1n ~sc

~~.

' RIMS, M R 'N 72 A -c s53 8604of 980 a--

Is or, m. 0 2 6 3 UNITED ETATES 00VERNMENT Memorandum TEWESSEE VAU.ET AUTHORTTY To N. B. Rankta. Manager. Design Services. ONF. 03 Cat. Sequoyah Buclear Flast FROM i F. R. Wallace. Plant Manager. ONF. F08 2. Sequoyah Nuclear Flaat APR - 8 $66 DATE :

St'BJECT:

SEQUOTAE NUCLEAR FtANT (SQN)

  • ADDITION OF SPECIAL COATIFC SYSTDt3 FOR FROJECT CONSTRUCTION SPECIFICATION N2A931 Due to the implementation of a revised coating program at SQN. reference CAR #5Q-86-01-001 we are requesting the services of ADB for a revistom of Construction spectitcation N2A931. to incorporate various products that are available for Level 1 and !! coating appitcatione. Plant per-sossel have deterstned coating products that could be pesetbly used for Level I and 11 applications and have comp 11sd the attached list. New coattag systema that are acceptable should be incorporated tato 52A931.

Compatibility of new systens with exteting systene should be incorporated into N2A931 also. The trema with astertska should be addressed on a M

priority beste.

O O

g F. R. Wallace O!

M 4

eMA$sTAKsDF Attachment cca, RIMS, MR.4N 72A-Q__ _

D. F. Coetcheus. ONF. 58-2. Sequoyah This was prepared principally by C.

Brewton.

c' C

o O

$/045 L

Bur f *S. Savie:s Buds Ra cularis -re she fasrool Set,ern Plan

W.vqg Aft 44MEWt &

sew Coatten Svetees tevet 1 - Steet

1) NAL M500
2) EAL M500 and Ctll80 j
3) Amercoat #90 and C211sc
4) putec #1201 and C111sc
5) Carbostas 11sc and feeses 90-93
6) Taemec 90-93 lavet 11 - Steet
  • 1) E&L W3500 and C211
2) Amerlock 400 and C211
3) KAL #3500 es) Amerlock 400
  • $) Tasaec 90-93 tavet 11 - Censreta
1) NAL M119. E&L d5400, and EAL #3500
2) EAL #3500 and mobil 46:16 v

e3) R&L #3500 C3

+4) Amerlock 400 P3 new Coettaa Svetee Cocoatt6 titer g

level I - Steet

1) EAL M500 used w/Fhemottne 305
2) Notec 1201 used w/Phenottee 305
3) Amercoat to used w/Phenottne 305 g

lavet 11 - Jteet e

1) EAL W3500 used w/rbenottne 305
  • 2) Carbostac 11 used w/Taemec 90 93 C'
3) Amerlock 400 used w/ Pheno 1 Lee 305 O

CLEiDF 3/27/46 5/046

p a

WP-08-SQN, 31 Attechnext 6 Pego 1 cf 2 CORRRCTIVE ACTION PLAN j

1.

Problem Description No program has been established or implemented at Sequoyah Nuclear Plant (SQN) to account for unidentified / uncontrolled coating which have been applied to components installed in level I coating areas.

Also coating has not been applied to some components within the level 1 areas as required.

Corrective action report number SQ-CAR-86-01-001 has been initiated to correct the deficiencies noted. Corrective action will be tracked on CATD number WP-08-SQN-001.

2.

Corrective Action Plan A comprehensive protective coatings preventative maintenance program was established at SQN. An integral part of the program is to j

perform a 100 percent baseline coating inspection of the levels 1 and 2 coating areas. This inspection will initiate repairs of areas with degraded coatings.

A new SQN is being prepared to provide control of all procedures, methods, responsibilities and documentation of all aspects of l

surface, coating application and maintenance of all critically coated areas at SQN. This-upper-tier document will incorporate the l

requirements of all applicable specifications, design guides and standards, and as-constructed drawings and will establish procedure l

for documenting compliance with the FSAR.

In addition to the implementation of the new SQN, which will provide overall program control for nuclear protective coatings, other existing maintenance instruction procedures will be revised as required to comply with and support the new SQN. New procedures will be issued as required to provide mandatory periodic surveillance inspections of all critically coated areas and to control a documentation log of all uncontrolled coatings inside primary containment.

,b 8

5

-e 3.

Action to Prevent Recurrence The'implementatio of the program described above should correct all deficiencies noted by the CAR and should provide complete control and consistent program guidance to correct other deficiencies that may exist and prevent reoccurrence of problems of this nature.

+

b 8

s.

h Yk

,,.e, 4

, '3.,.,, ! -,.S

  • t 1s.

, nMw u. - is.

WP-08-SQN, R1 AttachmeIt 6 Pago 2 af 2 4.

Rusting conditions were found on the following Preventative Maintenance (PN) packages: RN-1474-364, PN-1434-364, PN-1435-364, PN-1439-364, PN-1438-364 PM-1519-364, PN-1520-364, PN-1521-364, PN-1436-364, PN-1437-364, PN-1473-364, and PN-1518-364. These PN packages are being evaluated by ONE. All rusting conditions have been given a repair priority of 2.

Priority 2 items are not required for rastart. NR's and WR's will be generated on these items after ONE completes their review. The implementation of the PN program will ensure that all aress of the containment will be inspected on a periodic basis. This will improve the basic condition of coatings inside the containment building, including welds.

l 2893T 9

r E

e s

t

' v [; t,.

1

~

1

a.

TVA ENPLOYRE CONCERNS RRPORT NUNBER: WP-19-SQN SPECIAL PROGRAN REPORT TYPE: Welding Project REVISION NUN 8ER: 1 TITLE: WBN Concerns With No Generic Application to SQN

~

REASON FOR REVISION:

N/A SUMNARY STATENENT:

ADD ATTACHMENT 3. Note of clarificat on on why WTG.did not treat the concern in WP,-19 as being generic to 'iequoyah.

PREPARATION PREPARED BY:

Original Signed By R. D. Briggs 07-31-86 SIGNATURE DATE REVIEWS PEER:

Original Signed By J. F. Lewis 07-31-86 SIGNATURE DATE TAS: TECHNICAL VIEW O l~?$ $

f'Y t'.

/

SIGNATURE DATE l

CONCURRENCES Original Signed By CEG-H:

L. E. Martin 08-18-86

/ ~ 2.5-87 SRP:

W l

SIGNATURE DATE SIGNATURE

  • DATE f

APPROVED BY:

~A l~ h hf N/A ECSP NANAGE(/

DATE '

NANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY)

  • SRP Secretary's signature denotes SRP concurrences are in files.

2242T Mt

  • s s

c,.

s p tst,e App-

l

'e WELDING PROJECT GENERIC EMPLOYSE CONCERN EVALU' TION REPORT A

REPORT NUMBER: WP-19-SON. R1 DATE 07/13/86

SUBJECT:

WBN CONCERNS WITH NO GENERIC APPLICABILITY TO SON CONCERNS CONSIDERED: SEE ATTACHMENT 1 PREPARED BY Original Signed by Robert D. Brigas 7/31/86

, OC WP REVIEWED BY Original Signed by James F. Lewis 7/31/86

, OC, WP REVIEWED BY Original Signed by R. P. Lynskey 8/13/86

, QA, WP REVIEWED BY Original Signed by L. E. Martin 8/18/86

, CEG-H, WELDING I

kbPROGRAMMANAGER APPROVED BY t

i l

Revision 1 to this report is being issued t add employee concerns which have been evaluated and determined not to be generically applicable to SQN.

l l

l 00380

GENERIC EMPLOYEE CONCERN

SUMMARY

SHEET Report Number: WP-19-SON. R1 Report

Title:

WBN CONCERNS WITH NO GENERIC APPLICABILITY TO SON I.

CONCERNS CONSIDERED: See Attachment 1.

II.

ISSUES INVOLVED Various.

III. STATEMENT OF CONCERN / ISSUE VALIDITY Validity:

Y

,N X, Substantiated: Y

,N I

IV.

EFFECT ON HARDWARE AND/0R PROGRAM None V.

JUSTIFICATION Detailed review of the subject concerns indicates that they are WBN specific and have no implication to SQN. This was determined by review of ERT reports and analysis of concern wording for direct identification of WBN locations, procedures, and other identifying statements.

VI.

RECOMMENDATION AND/0R CORRECTIVE ACTION NEEDED None VII. REINSPECTION NEEDED: Y

,N X

VIII. ISSUE CLOSURE By this report.

IX.

ATTACHMENTS, 1.

List of WBN Concerns With No Generic Applicability to SQN l

lR1 2.

Text of Employee Concerns l

Page 1 of 1 00380

GENERIC EMPLOYEE CONCERN Report Number: WP-19-SQN. El Report

Title:

WBN CONCERNS WITH NO GENERIC APPLICABILITY TO SQN I

The subject WBN specific Employee Concerns were evaluated to determine if they have generic applicability to SQN.

i The text of the concern was reviewed to determine if any direct references were made to SQN or WBN.

The criteria for classifying the WBN concerns as WBN-specific is as follows:

1.

Investigation of the specific concern by ERT or NSRS as a WBN issue.

2.

Text references to WBN procedures, locations, or features.

The attached Employee Concerns have been determined to be WBN-specific.

They are to be investigated as part of the WBN program and are closed as they relate to SQN by this report.

1 i

i Page 1 of 1 00380

l Page 1 of 1 GENERIC EMPLOYEE CONCERN Report Number: WP-19-SON. R1 Report

Title:

W8N CONCERNS WITH NO GENERIC APPLICABILITY TO SON IN-85-021-003-IN-85-965-001-WI-85-003-001-IN-85-612-006 IN-85-725-X15-IN-85-725-X14-IN-85-540-001-IN-86-143-002 IN-85-503-001 WI-85-034-001-IN-85-501-001-WI-85-030-008-IN-85-532-006 IN-85-021-X05-IN-85-335-002-IN-85-424-X13 IN-85-612-X07 IN-85-7 70-003-IN-85-770-XO7 IN-85-778-X07 IN-86-167-005-IN-86-167 -X06-WI-85-003-X02-IN-85-543-002 IN-85-299-003-l WI-85-055-001-lR1 WI-85-056-001-l l

s l

00380

08/23/86 (EMPLOYEE CONCERNS)

Attselmint 2

'08. 13:33 Pagn 1 of 9 CAT ISSUE PLANT PRIORITY ORG QTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

ERT A2 SR IN-85-021-003

.YWORDS:

CERTIFICATION IMPLEMENTATION UPDATE PROB: WCPOW STEAMFITTER'S WELDER CERTIFICATION CARDS HAVE BEEN BACK DATED 1 OR 2 WEEKS TO COVER WELDERS WHOSE CERTIFICATION CARDS WERE NOT RE-STAMPED AFTER THE 90 DAY CERTIFICATION PERIOD HAD EXPIRED. THIS OCCURRED WITH SEVERAL S/F WELDERS WHO WELDED DURING THE 90 DAY PERIOD. IN NOVEMBER 1984 Cl WAS GIVEN 2 WEEKS OFF BY GENERAL FOREMAN FORLETTING Cl'S 90 DAY CERTIFICATION CARD EXPIRE. Cl STATED HE HAD MADE 96 ASME CODE CLASS 2 WELDS DURING THE 90 DAY TIME PERIOD (AUG.-OCT.

1984). AFTER RETURNING TO WORK IN DECEMBER 1984 CI'S CERTIFICATION CARD WAS BACK DATED TO OCTOBER 31,1984. STEAMFITTER SHOP STEWARD (NAME GIVEN) HAS NAMES IR: IN-85-113-003 STAT:

RC:

TECHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10


CONCERN-------

W 1

A2 SR IN-85-965-001 KEYWORDS:

CERTIFICATION IMPLEMENTATION SPECIFIC PROB: WCPlF A WELDERS CERTIFICATION (NAME KNOWN) EXPlRED ON A WEDNESDAY. THIS WELDER WAS RE-CERTIFIED THE NEXT MONDAY, BUT THE CERTIFICATION WAS BACK-DATED TO PREVENT THE WORK PERFORMED BY THIS WELDER FROM BEING REJECTED. THIS WAS DONE ABOUT

.-16-80.

Cl HAS NO ADDITIONAL INFORMATION.

IR: IN-85-770-002 STAT:

RC:

TECHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W I

A2 NR Wi-85-003-001 KEYWORDS:

CERTIFICATION IMPLEMENTATION FALSE NONSPEC PROB: WCPlF WELDERS CERTIFICATION CARD WAS FALSlFIED. CMA RESPONSIBLE FOR BACKDATING.

CONCERN OCCURRED DURING MAY 27-JUNE 3,1985. WELDER PERFORMING DUTIES IN TURBINE l

BLOG. (UNIT 2). THIS CONCERN WAS ORIGINATED IN THE WELDING UPDATING OFFICE.

l IR: IN-85-770-002 STAT:

RC:

TECHNICAL COMMENTARY:

08/23/86 (EMPLOYEE CONCERNS)

Attschnint 2 08,:13:33 10 ------CONCERN gs 2 of 9 Pa

, CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD W

1 A2 SR IN-85-612-006

.YWORDS:

CERTIFICATION PROGRAM SPECIFIC PROB: WCPlF WELDER CERTIFICATION UPDATE IS INADEQUATE AND NOT ENFORCED PER AN ESTABLISHED SET OF CRITERIA. WELDERS GIVEN TIME OFF WITHOUT PAY FOR FAILURE TO UPDATE CERTIFICATIONS. (NAMES / DETAILS TO THE SPECIFIC CASE ARE KNOWN TO OTC AND WITH-HELD TO MAINTAIN CONFIDENTIALITY). CONSTRUCTION DEPT. CONCERN. Cl HAS NO MORE INFORMATION.

IR: IN-85-352-001 STAT:

RC:

TECHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W l

A4 SR IN-85-725-X15 KEYWORDS:

RECERTIFICATION PROGRAM SPECIFIC TES PL PROB: WCPlF THE CONTROL OF WELDER RECERTIFICATION TEST PLATES WAS INADEOUATE: TEST PLATES BEGUN BY ONE WELDER COULD HAVE BEEN COMPLETED BY ANOTHER WELDER. DETAll KNOWN TO OTC-WITHHELD TO MAINTAIN CONFIDENTIALITY.

IR: IN-85-725-X14 STAT:

RC:

.CHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

A4 NR IN-85-725-X14 KEYWORDS:

RECERTIFICATION PROGRAM ADMINISTRATIVE PROB: WCPTl t

WELDER RECERTIFICATION: PROGRAM HAD INADEOUATE SUPERVISORY OVERSIGHT: IT COULD HAVE BEEN POSSIBLE FOR A GOOD WELDER TO WELD THE TEST PLATES FOR AN INCAPABLE WELDER. DETAILS KNOWN TO OTC, WITHHELD TO MAINTAIN CONFIDENTIALITY.

IR: IN-85-725-X14 STAT:

RC:

TECHNICAL COMMENTARY:

i og.

08/23/86 (EMPLOYEE CONCERNS)

Attschm2nt 2 08, 13:33 10 ------CONCERNga 3 of 9 P4 CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 1

W 1

ERT A2 SR IN-85-540-001

.YWORDS:

CERTIFICATION IMPLEMENTATION UPDATE PROB: WCPlF l

INADEQUATE WELDER CERTIFICATION UPDATE. WELDER IS " PUNISHED" IF HE/SHE FORGETS TO UPDATE ON TIME YET THE UPDATE IS A FORMALITY. THERE IS NO \\ERIFICATION THE PROCESS WAS USED DURING THE 90 DAY PERIOD. EMPLOYEES ARE KEPT UPDATED EVEN THOUGH THEY DO NOT WELD FOR YEARS AT AT TIME.

IR: IN-85-352-001 STAT:

RC:

TECHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

A2 SR IN-86-143-002 KEYWORDS:

CERTIFICATION IMPLEMENTATION SPECIFIC PROB: WCPlF WELDER'S CERTIFICATION CARD WAS BACK-DATED AROUND 30 DAYS AFTER WELDER FAILED TO HAVE HIS CARD UP-DATED. CONSTRUCTION CONCERN. (NAMES / DETAILS KNOWN TO OTC AND RELEASE OF THIS INFORMATION COULD JEOPARDlZE CI'S CONFIDENTIALITY). Cl HAS NO ADDITIONAL INFORMATION.

IR: IN-85-770-002 STAT:

RC:

.CHNICAL COMMENTARY:

ISSUE CONSIDERED: WPO CONTINUITY RECORDS HAVE BEEN FALSIFIED.

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

ERT A2 IN-85-503-001 KEYWORDS:

NOT WELD RELATED PROB: XXXXX INDIVIDUAL (NAME KNOWN) IN CONCERNED INDIVIDUAL'S (HEREAFTER Cl) CREW WAS GIVEN 2 WEEKS OFF FOR FAILING TO HAVE WELDING CARD UPDATED BY WELD ENGINEERING.

INDIVIDUAL HAD PERFORMED REQUIRED WELDS BUT WAS OUT SICK ON THE DAY UPDATE WAS REQUIRED. OTHER INDIVIDUALS IN CI'S CREW WHO HAD FAILED TO GET THEIR CARDS UPDATED RECEIVED NO DISCIPLINARY ACTION OR HAD RECEIVED ONLY AN ORAL WARNING.

~

(ADDITIONAL INFORMATION AVAILABLE) 1R:

STAT:

RC:

TECHNICAL COMMENTARY:

08/23/88 (EMPLOYEE CONCERNS)

Attachm:nt 2 08.:13:33 Pegs 4 of 9 CAT ISSUE PLANT PRIORITY ORG QTC EGG INSP SD RD CD 10 ------CONCERN-------

W 1

SR Wl-85-084-001

.YWORDS:

CERTIFICATION PROGRAM UPDATE PROB: WCDPW Cl REPORTED THAT A WELDER, WHOSE CERTIFICATIONS HAD EXPIRED, WAS ALLOWED TO CHECK OUT ROD FROM THE ROD SHACK.

Cl EXPRESSED THAT THIS INDICATES THAT THE "NEW" WELDER RECERTIFICATION PROGRAM STILL DOES NOT WORK.

NAMES KNOWN.

CONSTRUCTION DEPT CONCERN.

Cl HAS NO FURTHER INFORMATION.

INCIDENT OCCURRED 10/85.

IR: Wi-85-084-001 STAT:

RC:

TECHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG QTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

ERT L2 SR IN-85-501-001 KEYWORDS:

ELECTRODE IMPLEMENTATION CONTROL PROB: WCPME UNUSED BUNDLES OF WELD ROD FREQUENTLY FOUND IN TRASH CANS 1.E.

TURBINE BLDG.,

708',729', AND 755' ELEVATIONS, UNIT #2 (15-20 RODS FOUND 6-7-85)

IR: IN-85-052-008 STAT:

RC:

'ECHNICAL COMMENTARY:

ISSUE CONSIDERED: ELECTRODE ACCOUNTABILITY.

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W I

P6 SR Wl-85-030-008 KEYWORDS:

REINSPECTION PROGRAM PAINT PROB: WCDPW THERE MAY HAVE BEEN THOUSANDS OF WELDS INSPECTED THROUGH CARBO-ZINC PRIMER.

HOWEVER, TVA REPORTS INDICATE THAT ONLY 100-150 WELDS WERE INSPECTED IN THIS MANNER EVEN THOUGH THERE IS NO DOCUMENTATION IDENTIFYING WHICH WELDS WERE INSPECTED THROUGH CARBO-ZINC PRIMER. NUC. POWER DEPT. CONCERN. Cl HAS NO ADDITIONAL INFORMATI,0N.

IR:

STAT:

RC:

TECHNICAL COMMENTARY:

ISSUE CONSIDERED: INSPECTION OF WELDS THROUGH PAINT.

~~

i

08/23/86 (EMPLOYEE CONCERNS)

Attachn:nt 2 l

-08.:13:33 Page 5.of 9 CAT ISSUE PLANT PRIORITY ORG QTC EGG INSP SD RD GD 10 ------CONCERN-------

W I

NSRS P3 SR IN-85-532-006

.YWORDS:

INSPECTION PROGRAM CRITERIA PROB: WCDPW CCP 4.13 VTC STATES THAT HANGER FILLET WELDS ARE TO BE 1/8-3/16" MAX. DWG.

47A050, SHEET IN, NOTE 50 STATES THAT WELDS MAY BE 100% OVERSIZE. THE QC HANGER CARDS STATE THAT THE INSTALLATION WAS INSPECTED PER OCP 4.13 VT

C. PROCEDURE

DWG NOW CONFLICTS WITH OVERSIZE WELDS THAT HAVE BEEN ACCEPTED. (NO SPECIFIC CASES GIVEN)

IR: 1-85-234-WBN STAT:

RC:

TECHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

ERT A3 SR IN-85-021-X05 KEYWORDS:

CERTIFICATION IMPLEMENTATION FALSE SPECIFIC PROB: WCPOW WELDERS CERTIFICATION CARDS WERE FALSIFIED. (DETAILS OF SPECIFIC CASE ARE KNOWN TO OTC AND WITHHELD TO MAINTAIN CONFIDENTIALITY) CONSTRUCTION CONCERN. Cl HAS NO MORE INFORMATION.

IR: IN-85-770-002 STAT:

RC:

.CHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

ERT SR IN-85-335-002 KEYWORDS:

CER'lFICATION IMPLEMENTATION SPECIFIC PROB: WCPOW l

WELDERS ON " RESTRICTIONS" (NOT ALLOWED TO WELD) ARE TOLD TO KEEP THElR CERTIFICATIONS UPDATED EVEN WITHOUT USING THE PROCESS OR TIME IN THE TEST SHOP.

(NAMES ARE KNOWN) 1R: IN-85-335-002 STAT:

RC:

l TECHNICAL COMMENTARY:

l l

l l

08/23/88 (EMPLOYEE CONCERNS)

'08:13:33 Page 6 of 9 CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

ERT A3 SR IN-85-424-X13

.YWORDS:

CERTIFICATION IMPLEMENTATION FALSE SPECIFIC PROB: WCPlF MANAGEMENT PERSONNEL FALSlFIED WELDER'S CERTIFICATION CARD. (DETAILS OF SPECIFIC CASE KNOWN TO OTC AND WITHED TO MAINTAIN CONFIDENTIALITY).

CONSTRUCTION CONCERN. Cl HAS NO MORE INFORMATION.

IR: IN-85-770-002 STAT:

RC:

TECHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

A3 SR IN-85-612-X07 KEYWORDS:

CERTIFICATION IMPLEMENTATION FALSE SPECIFIC PROB: WCPIF WELDER CERTIFICATION CARP FALSIFIED. (DETAILS TO THE SPECIFIC CASE KNOWN TO OTC AND WITHHELD TO MAINTAIN CONFIDENTIALITY). CONSTRUCTION DEPT. CONCERN.

Cl HAS NO MORE INFORMATION.

IR: IN-85-770-002 STAT:

RC:

TECHNICAL COMMENTARY:

iT ISSUE PLANT PRIORITY ORG QTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

SR IN-85-770-003 t

f i

KEYWORDS:

CERTIFICATION IMPLEMENTATION SPECIFIC PROB: WCPIF l

INDIVIDUALS POSSESSING INVALID WELDER CERTIFICATIONS. DETAILS KNOWN TO OTC, WITHELD DUE TO CONFIDENTIALITY REQUIREMENTS. CONSTRUCTION DEPARTMENT CONCERN.

IR: IN-85-352-001 STAT:

RC:

TECHNICAL COMMENTARY:

08/23/86 (EMPLOY @@

@@C@@CDC39D M@tcDEmn@ P2 08:13:33 Paga 7 of 9 CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD CD 10 ------CONCERN-------

W 1

A3 SR IN-85-770-X07 I

.YWORDS:

CERTIFICATION IMPLEMENTATION FALSE SPECIFIC PROB: WCPOW 1

l WELDERS (8) CERTIFICATION CARDS WERE FALSIFIED. (DETAILS TO THE SPECIFIC CASE ARE KNOWN TO OTC AND WITHHELD TO MAINTAIN CONFIDENTIALITY). Cl HAS NO MORE INFORMATION. CONSTRUCTION DEPT. CONCERN.

IR: IN-85-770-002 STAT:

RC:

TECHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

A3 SR IN-85-778-X07 KEYWORDS:

CERTIFICATION IMPLEMENTATION FALSE SPECIFIC PROB: WCPOW WELDER CERTIFICATION CARD FALSIFIED, (DETAILS TO SPECIFIC CASE ARE KNOWN TO OTC AND WITHHELD TO MAINTAIN CONFIDENTIALITY). CONSTRUCTION DEPT. CONERN. Cl HAS NO MORE INFORMATION.

IR: IN-85-770-002 STAT:

RC:

TECHNICAL COMMENTARY:

.T ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

A4 SR IN-86-167-005 KEYWORDS:

CERTIFICATION IMPLEMENTATION SPECIFIC PROB: WCPOW

\\

Cl IS CONCERNED THAT WELDER RE-OUALS (UPDATES) HAVE BEEN BACK DATED. (DETAILS ARE KNOWN TO OTC. WITHHELD DUE TO CONFIDENTIALITY.) CONSTR. DEPT. CONCERN. Cl HAS NO FURTHER INFORMATION.

IR: IN-85-770-002 STAT:

RC:

TECHNICAL COMMENTARY:

08/23/86 (EMPLOYEE CONCERNS)

Attachnemt 2 08:13:33 Paga 8 of 9 CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

SR IN-86-167-X06

.YWORDS:

CERTIFICATION IMPLEMENTATION FALSE SPECIFIC PROB: WCPlF WELDER CERTIFICATION CARD HAS.BEEN FALSIFIED. (DETAILS TO THE SPECIFIC CASE ARE KNOWN TO OTC AND WITHHELD TO MAINTAIN CONFIDENTIALITY). CONSTRUCTION DEPT.

CONCERN. Cl HAS NO MORE INFORMATION.

IR: IN-85-TTO-002 STAT:

RC:

TECHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

A3 SR Wi-85-003-X02 KEYWORDS:

CERTIFICATION IMPLEMENTATION FALSE SPECIFIC PROB: WCPIF WELDER CERTIFICATION CARD FALSIFIED. (DETAILS TO THE SPECIFIC CASE ARE KNOWN TO OTC AND WITHHELD TO MAINTAIN CONFIDENTIALITY). CONSTRUCTION DEPT. CONCERN. Cl HAS NO MORE INFORMATION.

IR: IN-85-770-002 STAT:

RC:

TECHNICAL COMMENTARY:

iT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10 ------CONCERN-------

W 1

ERT A4 SR IN-85-543-002 KEYWORDS:

CERTIFICATION PROGRAM UPDATE PROB: WCDPW WELDER CERTIFICATION UPDATE PROCEDURE IS INADEOUATE. WELDERS CAN BE OFF WORK OVER 90 DAYS AND NOT BE REQUIRED TO RE-TEST UPON RETURNING TO WORK.

IR: IN-85-352-001 STAT:

RC:

TECHNICAL COMMENTARY:

ISSUE CONSIDERED: WELDER PERFORMANCE OVALIFICATION UPDATE.

l l

Page 9 of 9 07/25/86 (EMPLOYEE CONCERNS) 03:11:22 CAT ISSUE PLANT PRIORITY ORG QTC EGG INSP SD RD GD 10 ------CONCERN------

l WE W

1 EGG S3 593 Y

SR IN-85-299-003 I

l KEYWORDS: WELDMENT QUALITY NONSPECIFIC PROB: WCMCU j

i l

SS WELDS SEEM TO HAV" EXCESS METAL REMOVED AT BUTT WELD JOINTS, ALSO THE l

WELDS EXHIBIT EXCESSI4E SHRINKAGE AT JOINTS.

THIS CONCERN IS GENERIC BUT R1 l HAVE EXAMPLES. THIS HAS BEEN NOTICED FOR THE PAST 6 YEARS IN BOTH UNITS.

I DETAILS KNOWN TO QTC, WITHHELD DUE TO CONFIDENTIALITY. CONSTRUCTION DEPT l

CONCERN..

I l

IR:

STAT:

RC:

EC-SP-6 WP-19-SQN l

l TECHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG QTC EGG INSP SD RD GD IO


CONCERN------

l WE W

1 EGG A4 511 Y

SR WI-85-055 001 l

l KEYWORDS:

RECERTIFICATION PROGRAM NONSPECIFIC PROB: WCDPW l

l THE WELDER CERTIFICATION TEST PRESENTLY BEING ADMINISTERED TO WELDERS AT WATTS R1 l BAR IN THE RECERTIFICATION EFFORTS FOLLOWING A RECENT STOP WORK ORDER (NO. 25),

l IS NOT IN COMPLIANCE WITH CODE (ASME SECTION IX).

CI HAS NO FURTHER INFORMATION.

l l

IR: WI-85-055-001 V STAT:

RC:

WP-19-SQN I

l TECHNICAL COMMENTARY:

CAT ISSUE PLANT PRIORITY ORG QTC EGG INSP SD RD GD 10 ------CONCERN------

l WE W

1 EGG A4 511 SR WI-85-056-001 l

l KEYWORDS:

RECERTIFICATION PROGRAM SPECIFIC PROB: WCDPW l

I l

l CI WAS TOLD (BY WELDERS WHO ARE IN THE PROCESS OF RETESTING) THAT THEY ARE R1 i BEING TESTED ON FLAT PLATE, IN THE FLAT POSITION, FOR WELDING PIPE USING THE l

T.I.G. AND S.M.A.W. PROCESSES.

THIS IS NOT IN ACCORDANCE WITH ASME CODE l

REQUIREMENTS. CI HAS NO FURTHER INFORMATION.

a l

l IR: WI-85-055-001 V STAT:

RC:

WP-19-SQN l

l TECHNICAL COMMENTARY:

l l

I

-, _ ~. _

WP-19-SQN Page 1 of 1

(

Note of clarification on why WTG did not treat the concerns in WP-19 as being generic to Sequoyah.

The Weld Project took issue with the ECTG's methodology and/or process of making concerns generic to Sequoyah and opted to perform it's own independent evaluation.

The weld project's evaluation consisted of a detail analysis of the concerns and their associated NSRS/ERT investigation reports.

In addition the weld project used some of TVA's senior level welding engineers to determine if the specific issues in question had any generic relevance to Sequoyah.

The result of the weld project review is included in subject report which primarily identifies the concerns and the method used by senior level welding engineers to evaluate the concerns.

Although the weld project did not document the logic used in evaluating each concern the accuracy of the evaluation is supported by the findings and conclusions contained in the other Weld Project Reports.

It is the opinion of the Weld Project that the differences in the evaluation of the concern is related to'the use of the additional information found in the reports as opposed to only using the text of the concern. The evaluation of the concern on the report level under the ECTG Program will resolve any remaining differences between ECTG and WTG on what should be considered generic to Sequoyah.

__