Forwards Insp Repts 50-424/87-25 & 50-425/87-17 on 870317-20.No Violations or Deviations Noted
ML20209C499
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/13/1987
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20209C504 List:
References
NUDOCS 8704280694
Download: ML20209C499 (3)


See also: IR 05000424/1987025

Text

ht y

-

(

..

APR 131987

Docket Nos. 50-424, 50-425

License Nos. NPF-61, CPPR-109

Georgia, Power Company

ATTN:A r. James P. O'Reilly

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-424/ 87-25 AND 50-425/87-17

This refers to the Nuclear Regulatory Connission (NRC) inspection conducted by

J. R. Harris on February 17-20, 1987.

The inspection included a review of

activities authorized for your Vogtle facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identi-

fied.

.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

5

Thomas A. Peebles, Acting Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ encl:

(See page 2)

8704280694 870413

PDR

ADOCK 05000424

G

PDR

ZGci

. _ . - .

.

. _ _ .

-.

.-

.

- . - .

F ..

_-

.

APR 1 3 Iga 7

-

Georgia Power Company

2

)cc w/ enc 1:

V R. E. Conway, Senior Vice President &

/ Project Director

f. Whitney,' General Manager Project

j Support

JP. D. Rice, Vice President, Project

Engineering

MR.H.Pinson,VicePresident, Project

h. Construction

W. Hayes, Vogtle Quality

J . Assurance Manager

G

B. Bockhold, General Manager,

d.NuclearOperations

Gucwa, Manager, Nuclear Safety

and Licensing-

YJ. A. Bailey, Project Licensing

Manager

/8.W. Churchill,Esq.,Shaw,

\\d.Pittman,PottsandTrowbridge

E. Joiner, Troutman, Sanders,

Lockerman and Ashmore-

/ J. G. Ledbetter, Commissioner,

Department of Human Resources

V C. H. Badger, Office of Planning

j and Budget

@ . Kirkland, III, Counsel,

Office of the Consumer's Utility

j Council

V D. Feig, Georgians Against

Nuclear Energy

V M. B. Margulies, Esq. , Chairman,

Atomic Safety and Licensing Board

/ Panel

VDr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

j Panel

VG. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

bcc w/enci:

(See page 3)

.

}

'

,

_

_ _ . - _

_ . - -

_

_

.

. .

,

I

.. .

.

'

APR 131987

..

.

,

, .

Georgia Power- Company

3

bec w/ encl:

V E. Reis, OGC

y W. M. Hill, IE

/'M.-Miller,NRR

v W. Brach,*EDO

M. Sinkule, RII

E. Christnot, RII

/ NRC Resident Inspector

Document Control Desk

,

State of Georgia

!

i

.<

f

R

RII -

-

RII

e

RII

r is

onlo

Aferdt

MSinkule

/(L/87

1 / /87

0$/$ /87

02/ /87

..

. - .

-..

-

.

--

.

--

- - _

- .

._

,