ML20209A963

From kanterella
Jump to navigation Jump to search
Forwards Std Order for DOE Work 60-80-198 for Lll.Order Clarifies Requirements for Reporting Uncertainties in Reactor Safety Research Results.Authorization Requested
ML20209A963
Person / Time
Issue date: 09/08/1980
From: Murley T
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Lagrone J
ENERGY, DEPT. OF
Shared Package
ML20209A640 List: ... further results
References
FOIA-85-782 NUDOCS 8702030490
Download: ML20209A963 (6)


Text

.v .

.0 c.

(

SEP 8 1980 Mr. J. LaGrone, Manager San Francisco Operations Office U. S. Department of Energy ,

1333 Broadway-Wells Fargo Building Oakland, California 94612

Dear Mr. LaGrone:

FY 1980 NUCLEAR REGULATORY RESEARCH ORDER NO. 60-80-198 FOR LAWRENCE LIVERMORE LABORATORY Please authorize Lawrence Livemore Laboratory to execute the program described in the enclosed EC Order.

If this meets with your approval, it is requested that acceptance be indicated on the enclosed form and the original be returned to the NRC Controller with a copy to this office.

Sincerely,

(

i:

Thomas E. Murley, Director Division of Reactor Safety Research

Enclosures:

DIST

1. NRC Order YuSI Ser , RSR
2. Reporting Requirements Circ Chron Fabic, 'R cc w/ enclosures: Riggs rf Johnson, RSR R. W. Barber. DOE /NSC A. Puglise, CON Tong, RSR l D. D. Mayhew, DOE /ASEY:DFS J. Leonard, CON Kenneally, RSR E. W. McCauley, LLL Harbour, RSR Shao, RSR H. D. Mr Donald, LLL Brazee, RSR Beach, RSR C. K. Chou, LLL O'Brien, RSR Murley, RSR P. D. Smith, LLL Richa'rdson, RSR Hayes, RES G. H. Powell, UCL Berkeley Bagchi, RSR  :

8702030490 870120 Vagins, RSR 7 )

i PDR FOIA MORROW 85-782 PDR L! /

71b e R RS RS 4 [ RSR R{R ,,

e an Tong Fabic Johnson

{ g B ch' 4h80 '7/y80 J/2[/80 7 /3/ /80,, j 7//p/80 (

omcc> Bg8 1 -

RCMRj k RS . /

b RER.h RbR l b RS& L Scho ield Hay Ric r son Harbour Sha M[rle,y suaw c . ,

1 -- Rddhn ..mer .. .1Meo a 7a/8o 7 /= /8o 7/l'8o

. . . . . . . . - i . - . . . . , . . . . , . . . . 'l

a h

(

)

'.' s NRC somw 173 u s mucteam ptoutatomv cowwissioN omot a muwst a (2 78) 60-80-198 STANDARD ORDER FOR DOE WORK SEP 6 1980 ISEVED TO (DOE Offece) ISSUED BY. (NRC Officel ACCOUNTING CITATION APPmOPRIAT6oN sVMSOL San Francisco Operations Office Division of Reactor 31X0200.600 Safety Research . , , v ,c ,

PERFORMING ORGANIZATION AND LOCATION See Attached PsN NUMBE m Lawrence Livemore Laboratory See Attached WOR K PERIOD . THis ORDE R FIN TITLE FIXED D ESTIMATED D F R OM- To-See Attached OBLIGATION AVAILABILITY PROVIDED BY:

A THis ORDER S N/A S. TOT AL OF ORDERS PL ACE D PRIOR TO THIS DATE W6TH THE PERFORuiNG OmoaN Z ATION

' ' ' "5 * ' " * * "" ' " ' ' "

& N E I D E N/A C. TOTAL ORDERS TO DATE (TOTAL A 8m B) S N/A

( D. AMOktNT INCLUDED IN "C" APPLtCABLE TO THE " FIN NUMBE R" CITED IN THIS ORDER.

FINANCI AL FLEXISILITY; S

N/A O FUNDS WILL NOT BE REPROGRAMMED BETWEEN FINS. LINE D CONSTITUTES A LIMITATION ON OSLIGATIONS

' AUTHORIZE D.

O FUNDS MAY BE REPROGRAMMED NOT TO EXCEED 110% OF FIN LEVEL UP TO 880K. LINE C CONSTITUTES A LIMITATION ON OsLIGATIONS AUTHORIZED.

STANDARD TERMS AND CONDITIONS PROVIDED DOE ARE CONSIDERED PART OF THl$ ORDER UNLESS OTHERWISE NOTED. ,

ATTACHME NTS:

THE FOLLOWING ATTACHMENTS ARE HERESY SECURITY:

MADE A PART OF THIS ORDER: $ WORK ON THis ORDER IS NOT CLASSIFIED.

O STATEMENT 0F WOR K O WORK ON THiS ORDER INv0LvES CLASSIFIED D ADDITION AL TERMS AND CONDITIONS INFORMATION. NRC FORM 187 is ATTACHED.

QOTHER REMARKS:

This order clarifies requirements for reporting uncertainties in reactor safety research results. Attachment 3 is the RSR Policy and Standard Practice for Reporting Uncertainties in Reactor Safety Research. Enclosure 2 lists the degree of applicability of the standard practice to reactor safety research projects conducted at LLL.

l? M% AUTHOSIY / m1 1 ACCEPTING ORGANIZATION sichatumE Thomas E. FuMely, Directo

/ (/ / 1/g[ sioNATumE

( l 76TLE Division of Reactor Safety Research V . TITLE ,

  1. I SIRC FORM 173 (2 70) y --

.-,-m- . , i.-,.we - , - . - . y .._.,.,y,---y-- -- -, -- - ---r --i--

q-

~.

?-

  • K lll Encicsurs 2 DEGREE OF APPLICABILITY OF STANDARD PRACTICE FOR REPORTING UNCERTAINTIES IN REACTOR SAFETY RESEARCH CATEGORY
  • FIN TITLE BWR Containment Pool Dynamics B A0ll6 A

A0762 Load Combinations (SSMRP)

B A0136 Dynamic Analysis of Pipe Whip A

A0363 Piping Systems Reliability (Prev. B7028)

A A0139 SSMRP Seismic Input Project SSMRP Structural Project (Prev. B5614) A A0130 C

A0140 Tap A-40 Technical Support A

A0126 Seismic Safety Margin C

A0128 Dynamic Testing Methods B

A0133 Load Combinatic1s A0362 Load Combinations (SSMRP) B Categories are defined on next page

p r LAWRENCE l_IVERMORE LABORATORY NUCLEAR SYSTEMS SAFETY PROGRAM TF80-230 September 8, 1980 E. Aust GKSS Forschungszentrum Geesthacht GmbH Postfach 1160 - Reaktorstrasse 7 - 9 D-2054 Geesthacht - Tesperhude West Germany

Subject:

Video Tape of Rod Lens /CCTV Demonstration

Reference:

U.S. NRC/LLNL Liaison to the GKSS-PSS Program

Dear Hr. Aust:

Please find enclosed a color video tape (NTSC format, 60 Hz) with a demonstration of the rod lens /CCTV (closed-circuit television). system that we have successfully used at LLNL. This tape includes a brief description of the basic rod lens system, and also demonstrates application to the LLNL 1/5-Scale

, Mark I Pressure Suppression Experiment and to the two-phase flow metering spool developed by LLNL/EG&G for the PKL test facility in Erlangen, West Germany.

We hope that you will find this information of interest to your own program.

If you have any further questions, please do not hesitate to contact us.

Sincerely, is' e a .

arry . Holman, .E.

Ther o Fluid Mechanics Group GSH:lgd 8009.08/1231u cc: (w/o encl) ',

'T. Lee (NRC-RSR) '

i I

L // ,

yf W. v l

l M Fqa*%gxstw~ty Eriplo,cr Uw=sityof Cavorre PO Bom B'J8 L atynac C&!arna 94550 Teicphone(4tbH221100 Tws 910-386-8339 UCLLL L%1R

I. R d d JAPAN ATOMIC ENERGY RESEARCH INSTITUTE 2 /f,,,f/ .fc , y TOKAl RESEARCH ESTABLISHMENT TOKAl edUR4, NAKA-GUN. ISARAKI MEN k

September 11, 1980 Dear Sir; Enclosed are, please find out, the experimental data report (s) on the JAERI Full-Scale Mark II Containment Response Test.

Very truely yours, E Elib M. Shiba Division of Research Safety JAERI Tokai-mura, Naka-gun Ibaraki-ken, 319-11

, Japan

(

Enclosure : JAERI-M 8961 003910 t

- f-

.. (!

- l,

/n Y ?

. SEP111999 FY 1981 PROGRAM BRIEF PROGRAM: WRSR

(

TITLE: BWR CONTAINMENT POOL DYNAMICS FIN: A0ll6 CONTRACTOR: LLL SITE: LIVERMORE STATE: CALIFORNIA NRC TECHNICAL MONITOR: T. LEE PRINCIPAL INVESTIGATOR: E. MCCAULEY OBJECTIVE: LIAISON FOR FULL SCALE STEAM CONDENSATION TESTS BUDGET ACTIVITY: 601901012 FY 1981 SCOPE $276K THE FOLLOWING TASKS ARE TO BE PERFORMED AS A CONTINUATION OF THIS PROGRAM:

THE CONTRACTOR WILL ACT AS THE NRC'S PRINCIPLE LIAISON FOR THE FULL SCALE STEAM CONDENSATION TESTS THAT ARE BEING PERFORMED AT THE JAERI TEST FACILITY IN JAPAN, GKSS FACILITY IN GERMANY AND KU0SHENG PLANT IN TAIWAN. THE CONTRACTOR WILL BE f

THE DESIGNATED U.S. RECIPIENT OF DATA GENERATED BY THESE TESTS AND WILL:

1) GENERATE DATA REPORTS FOR EACH TEST AND DISSEMINATE TO DESIGNATED ORGANIZATIONS PER NRC INSTRUCTION.
2) PROVIDE TECHNICAL EVALUATION OF THE TEST DATA AND DEVELOP A MORE FUNDAMENTAL UNDERSTANDING 0F THE STEAM VENTING PHEN 0MENA. IT WOULD BE DESIRASLE THAT TECHNICAL EVALUATION OF JAERI AND KU0SHENG TEST RESULTS BE PLACED IN CONTEXT OF THE OVERALL TEST DATA BASE, THAT INCLUDES GKSS AND DOMESTIC SOURCES.

j 3) PERFORM OTHER LIAIS0N ACTIVITIES WITH THE JAERI, GKSS AND KU0SHENG TEST l PROGRAMS PER NRC INSTRUCTION.

l l 4) DATA REPORTS TO BE PROVIDED FOR EACH TEST. PROGRESS REPORTS TO BE PROVIDED TO NRC TECHNICAL MONITOR ON MONTHLY BASIS.

5) THOSE JAERI, GKSS AND KU0SHENG REPORTS (AND THEIR EVALUATIONS) THAT ARE DESIGNATED PROPRIETARY SHALL ONLY BE DISSEMINATED TO NRC. THE APPROPRIATE CARE IN HANDLING SUCH REPORTS MUST BE EXERCISED BY THE CONTRACTOR WHILE PROCURING TRANSLATIONS. ( ,

j

',j '

. .-. - - .. . . .