ML20207T896
| ML20207T896 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/04/1987 |
| From: | Zech G NRC OFFICE OF SPECIAL PROJECTS |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20207T898 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8703240410 | |
| Download: ML20207T896 (2) | |
See also: IR 05000327/1986062
Text
. -
--- -
-
9.
.
O
o
.*
MAR 4 41987
+
Tennessee Valley Authority
t ATTN: Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN. 37402-2801
Gentlemen:
SUBJECT:
(INSPECTION REPORT NOS. 50-327/86-62 AND 50-328/86-62)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
M. W. Branch on November 12-21, 1986.
The inspection included a review of
J
activities authorized for your Sequoyah facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within these
areas, the inspection consisted of selective examinations of procedures and
. representative records, interviews with personnel, and observations of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements.
The violation, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice 'of
Violation.
This violation involved a failure to translate vendor requirements
regarding Hydrogen Analyzer installation into the Sequoyah design.
This inspection report identified several items which Region II considers restart
items, they are:
(1) operability of H2 analyzer
paragraph 8.1, (2) evaluation
of Unreviewed Safety Question Determination
(USQD) for Revision 3 -to the FSAR
regarding H analyzer accuracy
paragraph 8.1, (3) radiation protection review
z
of penetrations in shield building
paragraph 8.1, (4) followup of battery
room deficiencies
paragraph 8.m, and the Engineering Change Notice closecut
and FSAR update items addressed in the December 18, 1986 NRC letter
paragraph 5
and 9.
In accordance with Section 2.790 cf the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
8703240410 870304
ADOCK 05000327
O
llI
_ _ _ _ _ _ - - _
20/
.
.
_
_
_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
s
'
, .
'
.
-Tennessee Valley Authority
2
W 4 4 gj
Should you have any questions concerning this letter, please contact us.
Sincerely,
Gary G. Zech, Assistant Director
Regional Inspections
Division of TVA Projects
Office of Special Projects
Enclosures:
2. NRC Inspection Report
cc w/encls:
tE. L. Abercrombie, Site Director
Sequoyah Nuclear Plant
I R. Wallace, Plant Manager
W W. Cantrell, Acting Director
uclear Engineering
. L. Gridley, Director
yuclear Safety and Licensing
()r. R. Harding, Site Licensing
Manager
J,# w/encls:
bc
L . Keppler, OSP
bneter, 0SP
Zwolinski, OSP
'iaw, OSP
f.R.'Connelly,0IA
G. G. Zech, RII
K. P. Barr, RII
[NRd Resident Inspector
NRC Document Control Desk
State of Tennessee
'
RI
RII /
I
rady:er
'KBarr
) /13 /87
.14/9/87
24,/q/87
1
.
.
.
--
- - _ _ _ _ - _ - _ _ _ _ _ _ _ - _ - _ - _ _ _ _ _ _ _ _
-
.