ML20207T562
| ML20207T562 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/13/1987 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20207T563 | List: |
| References | |
| NUDOCS 8703240133 | |
| Download: ML20207T562 (2) | |
See also: IR 05000348/1987002
Text
'
~ _%-
,
/2
'
,
/
MAR 131997
Docket Nos. 50-348, 50-364
AJabamaPowerCompany
4TTN: Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-348/87-02 AND 50-364/87-02)
This refers to the Nuclear Reculatory Commission (NRC) inspection conducted by
Mr. W. Bradford on January 11 - February 10, 1987.
The inspection included a
review of activities authorized for your Farley facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified-in the enclosed inspection report.
NRC concerns relative to the defeating of automatic isolation of the Unit 1
RHR System, as discussed in Inspection Report 86-29, were discussed by
Mr. L. Reyes, Director, Division of Reacto.r Projects, NRC Region II, with you
and members of your staff in an Enforcement Conference held on February 10,
1987.
A summary of the Enforcement Conference is included in the enclosed
report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violation, references to pertinent requirements, and
elements to be included in your' response are described in the enclosed Notice
of Violation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room,
gy[2%h b
p
i
0
,,
._,
.
. _ . .
M3
t
- -
1
.
MAR 131987
'
,
' Alabama Power Company
2
Stiould you have any questions concerning this letter, please contat.t us.
Sincerely,
ORIGit:At. Si3NED BYa
j HELSON GRACE
J. Nelson Grace
Regional Administrator
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
- 0. Whitt, Executive Vice President
AVD.Woodard,GeneralManager-
Nuclear Plant
y G. Hairston,-III, General Manager -
Nuclear Support
bP/ W. McGowan, Manager-Safety Audit
and Engineering Review
g/K. Osterholtz, Supervisor-Safety
Audit and Engineering Review
bSc w/encls:
~ ERC Resident Inspector
1
f Reeves, Project Manager, NRR
Document Control Desk
State of Alabama
.
_a
h,q
RI
RII
RI
pyy
I
0f0/87
0ff87
3/o/
//
0 i
r_
RII
p,
GJenkins
03//2187