ML20207T429

From kanterella
Jump to navigation Jump to search
Confirms 870224 Telcon W/Hl Abercrombie Re 870226 Mgt Meeting to Discuss How Plant Complies W/Tech Specs W/Respect to Plant Operations Review Committee as Well as long-term & Interim Changes.Agenda Encl
ML20207T429
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/25/1987
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8703240005
Download: ML20207T429 (2)


Text

- - -

FEB 2 51987 Tennessee Valley Authority

,kATTN: Mr. 5. A. White Manager of Nuclear Power 6N 38A Lookout Place f

1101 Market Street.

Chattanooga, TN 37402-2801 f.

Gentlemen:

SUBJECT:

CONFIRMATION OYjiEETING SEQUOYAH - DC0KET N05, 50-327, AND 50-328 This confirms.. the tele ~ phone conversal.lon between Mr. H. L. Abercrombie of your staff and mys' elf on February 24, 1987, concerning a maragement meeting to be conducted in the Region II,0ffice on February 26, 1987, at 9:00 a.m.

We requested this meeting to discuss how Sequoyah is presently meeting its Technical Specifications with respect to the Plant Operations Review Committee, as.well as any l'ong term and interim changes planned to adopt the

" qualified reviewer" con'cep,t. A proposed meeting agenda is enclosed.

Should you have any question's regarding these arrangemen'ts, we will be pleased to discuss them.

Since' rely 7 ORIGINAL SIGN 50 gy

, GARY G. 2ECH

~ Gary G. Zech, Assistant Director Regional Inspections Division of TVA Projects Office of,Special Projects

.... j

Enclosure:

. Proposed Meeting Agenda

'~

,w/ encl:

l. L. Albercrombio, Site Director ljML.Gridley, Director clear Safety and Licensing

. W. Cantrell, Acting Director * '

clear Engineering

/

R. Harding, Site Licensiiig

. Manager bec w/oncl:

J: N. Grace

  • /'

(J: G. Keppler, OSP (f. D. Ebneter, OSP

&# A. Zwolinski, OSP M. D. Liaw, OSP

9. R. Connelly, OIA K.'P. Barr, RII F. R. McCoy, RII Rs E. Carroll, RII 441RC Resident Inspector NRC Document Control Desk State of Tennessee RII RIA R rrol cy/

r 3121/87 2/ivj/87

/87 h7 ztvr e

J FEB 25 15s7 ENCLOSURE PROPOSED MEETING AGENDA Tennessee Valley Authority February 26, 1987, 9:00 a.m.

I.

Opening Remarks NRC II. Discussion of Issues TVA/NRC A.

Implementation of Plant Operations Review Committee (PORC) Technical Specification (TS) Requirements, Including:

1.

PORC Composition i

2.

Quorum Requirements 3.

Items Reviewed and Process Utilized B.

Interim PORC Procedures and Practices C.

Planned TS Change (s) to Reduce PORC Work Load through the " Qualified Reviewer" Concept III. Closing Remarks NRC

,-,--n..-

-rr.


~e 4---

-w----

+ - - - - - -,-*-e-r-


- -----*---r-,r,---*-w-v,-

  • ---r

- - - -