February 26,~1987'
.
.
. Docket Nos. 50-327, 50-328
_ Jnnessee Valley Authority
T
M TTN: Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
,,
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT N05. 50-327/87-01 AND 50-328/87-01
' This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
M. A. Scott on January 6-8, 1987.
The inspection included a review of
activities authorized for your Sequoyah facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
l
Areas examined during the inspection are identified in the report. Within these
l
areas, -the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection,.no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by K. P. Barr)
8703230536 870226
O
0500g7
Kenneth P. Barr, Chief
TVA Projects Branch
Division of TVA Projects
i
Enclosure:
NRC Inspection Report
1
cc w/ encl:
(See page 2)
ili
- - - - -
ze n
..
. . . . . . .
.
[.
,7
'O
'
-.
.
'Tennesse balley Authority
2
February 26, 1987
' cg w/ encl:
>
f. L. Abercrombie, Site Director
.- -Jequoyah Nuclear Plant
tW. W. Cantrell, Acting Director
_yuclear. Engineering-
W. L. Gridley, Director
-Nuclear Safety and Licensing-
g)VR. Harding, Site Licensing
Manager
bec w/ enc 1:
J.-N. Grace, RII
-
.G. G. Zech, RII
/ G. Keppler, OSP
J. D. Ebneter, 0SP-
A. Zwolinski, OSP
-
D. Liaw, OSP
.R. Connelly, 0IA
K. P. Barr, RII
LNRC Resident Inspector
NRC Document Control Desk
State of 'lennessee
'
.
RII
RII
RII
I
&
.M
..
MScott:es
B
sie
C
ian
y-
22/g/87
2Y/
87
1
h
2.4hr /87
2
n