Text

~

76 T e

RET. URN 10 39ii-SS OBatteHe Columbus Division 505 King Avertue Columbus, Ohio 4 3201-1693 March 6, 1987 I;ll@"'3$f 4*'4'4 L124f Docket 70-8; Request for Amendment N,

RECENED to License No. SNM-7 f

MAR 1619%g )3 Mr. Leland Rouse

[

Advanced Fuel and Spent

du.s.tWDEA"N[

Fuel Reprocessing q'

Net s

Division of Fuel Cycle and Material Safety iD#'"

E 4

U.S. Nuclear Regulatory Commission g

^

Washington, D.C.

20555

Dear Mr. Rouse:

This is a formal request for an amendment to Battelle Columbus License SNM-7 to authorize the possession of not more than fifteen (15) curies of old fission and activation products that remain in the decommissioned and retired Battelle Research Reactor. This residual activity was previously authorized and possessed under License No. R-4 a " possess but not operate" retired research reactor. This residual radioactivity will be completely removed at a later date when all the nuclear facilities at our West Jefferson Nuclear Sciences Area are decantaminated and decommissioned.

In support of this requested amendment, we have enclosed revised pages to our Renewal Application Document, BCL 1081.

Revised pages are enclosed for pages vii and 1.9.

We have also enclosed our check for $150 to cover the processing fee associated with this administrative action.

Should you require additional information in order to proceed with the amendment please call me at (614) 879-5228.

Very truly yours,

)y l-0 9

oocKtito NN Harley L. Toy g

USNRc uc ar Services and f

MAR 161987) {2 NC.,-),Wf,),ffg., y NRC Licensing Coordinator 3

"l,-ll,"

,3 35 -

,,,, x.,,n 3 e q

um. sttn0N j

fg,3 g. c g, D C*U C"'"

HLT:jv Ca.: a...-u.a J. 2 ff{Q,* '

4/DT E ]

3C D h 7 J

Enc. (3)

O

~-

f DC C

d

development activities are conducted. This part describes the internal procedures and management philosophy for conducting assured health and

'~

safety perfonnance in all the Laboratories' activities. The procedures and descriptions outlined in Part II may be changed without prior notifi-cation or approval of the NRC, provided that the changed procedures remain within the overall criteria stated in Part I of this renewal application, and that the changes are made with the appropriate Battelle-Columbus internal review (Radiological Safety Committee) and approval steps as outlined in'Part I.

Maximum Quantity of Special Nuclear Material and Byproduct Material Which Licensee May Possess at Any One Time Under This License Special Nuclear Material West Jefferson Site Byproduct, Source, and/o'r Chemical and/or Maximum Amount that Special Nuclear Material Physical Forin Licensee May Possess At Any One Time Under This License (a) Uranium enriched in the Any 125 kilograms of contained.

U-235 isotope (,)

U-235 plus the associated

--irradiated and unseparated plutonium Uranium enriched in the Any 1900 grams of contained U-235 isotope U-235

--unirradiated Plutonium (Pu-238 Sealed source 13 grams principal isotope)

Plutonium (Pu-239 0xide 17 grams principal isotope)

Residual Radioactivity Old Fission 15 Ci Associated with the and Activation Retired Battelle Products ResearchRea;ctor (a)

Licensee is also authorized to possess any source material NOTE:

that may be contained in the irradiated uranium of the first item above.

Document No.

RENEWAL APPLICATION BCL-1081 Revision No.

2 Date 3/6/87 Pace vii Supersedes Revision No.

O Date Page

,__.-..,._,n,

_,-_,w.__, _ _. _, __ _ _, _ _ _, _ _,. _ _, _. _ _ _ _ _ _, _ _,,., _. _,,

4 1.3.4.

Hot Cell Radioactive Work Pennit Prior to start-up of any operations in the Hot Cell Laboratory involving a potential radiatior hazard, a Radioactive Work Permit must be filed with the resident Health Physicist, and the Industrial Safety Representative before operations are initiated. The ALARA considerations are'also addressed by the RWP.

The form also addresses the. description of the work, necessary protective clothing and equipment to. be utilized.

Preoperational personnel-dose estimates are required before the work can be initiated. The. Radioactive Work Permit is discussed in 4

, greater detail in Part II.

1.3.5. ' Control 'of' Residual ' Contamination at 'the' Retired Battelle Research' Reactor The Radiological Safety Officer (RS0) shall serve as the Retired Facility Site Representative for the Retired Battelle ResearchReactor_(BRR). His responsibilities shall include internal submission of radiation monitoring reports for the BRR to the Manager of Nuclear Services. Further, annual radiation monitoring reports shall be submitted to NMSS.

The RS0 shall control access to the BRR and review, and approve all applications for the usage of space at the BRR which is housed in Building JN-3.

i Document No.

RENEWAL APPLICATION BCL-1081 Revision th).

I Date 3/6/87 Page 1.9 Supersedes Revision No.

O Date Page

.