ML20207S335
| ML20207S335 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 03/16/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20207S336 | List: |
| References | |
| NUDOCS 8703190284 | |
| Download: ML20207S335 (2) | |
See also: IR 05000267/1987005
Text
--
1
.a
1
n!AR 161987161987In Reply Refer To:
Docket: 50-267/87-05
Public Service Company of Colorado
ATTN:
R. O. Williams, Jr.
Vice President,-Nuclear
Operations
P. O. Box 840
Denver, Colorado
80201
Gentlemen:
L
This refers to the inspection conducted by Messrs. R. E. Farrell, P. W. Michaud,
and M. E. Skow of this office during the period February 1-28, 1987, of
activities authorized by NRC Operating License DPR-34 for Fort St. Vrain
!
Nuclear Generating Station, and to the discussion of our findings with you and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
licensee action on previous inspection findings, licensee action on IE
bulletins and generic letters, licensee action on IE Infonnation Notices,
licensee action on 10 CFR Part 21 reports, quality verification functions,
maintenance, surveillances, security, feedwater line integrity, and followup of
nonroutine events. Within these areas, the inspection consisted of selective
'
examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors. The inspection findings are
4
j
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
i
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
i
of the NRC's " Rules of Practice," Part 2 Title 10, Code of Federal
[
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
'We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
'
paragraph 2 of the enclosed report.
>
!
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
.
!
0
f
g
R V: RI
PI:RPB/
kPB/A
C:RPB
k
\\
REFarrell
Michuad
MESkow
JPJaudon
JEGaglfapdo
f
,
- 4M/87
h/@/87
/#/4-/87
%/@/87
5 /13/$b
i
8703190284 870316
'
ADOCK 05000267
i
G
. . . . ..
__.____ _ _ _ _ ____,_._______-_-_,__ _-
I
li
.
Public Service Company of Colorado
-2-
,
l
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
1
Original Signed By
J. E. Gag!!ardo
J. E. Gagliardo, Chief
,
'
Reactor Projects Branch
l
l
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
l
50-267/87-05
cc w/ enclosures:
Manager, Nuclear Production Division
Fort St. Vrain Nuclear Generating Station
16805 WCR 19 1/2
Platteville, Colorado
80651
- -
P. Tomlinson, Manager, Quality
Assurance Division
[
(Same Address)
l
Colorado Radiation Control Program Director
bcc distrib. by RIV:
- RPB
R. D. Martin, RA
!
- Resident Inspector
DRSP
- Section Chief (RPB/A)
- RIV File
- Section Chief (RSB/ES)
- R&SPB
- RSTS OPERATOR
- MIS System
'
- RSB
- M.
E. Skow
i
Public Utilities Commission
Enforcement Officer
- R. Hall
'
l
- w/766
i
I
!