CONTAINMENT SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)
ACTION:
(Continued) 3.
With the suppression chamber average water temperature greater than 120 F, depressurize the reactor pressure vessel to less than 200 psig within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
With one suppression pool water temperature monitoring channel c.
inoperable, restore the inoperable channel (s) to OPERABLE status within 7 days or verify suppression pool temperature to be within the limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
d.
With both suppression pool water temperature monitoring channels inoperable, restore at least one inoperable channel to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
With one suppression chamber water level instrumentation channel in-e.
operable, restore the inoperable nw n-range suppression chamber water level channel to OPERABLE statu within 7 days or verify sup-pression pool water level to be within the limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, gg f.
With both suppression chamber water level instrumentation channels inoperable, restore at least one -
- range suppression chamber water level channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
g.
With the drywell-to-suppression chamber bypass leakage in excess of the limit, restore the bypass leakage to within the limit prior to increasing reactor coolant temperature above 200*F.
SURVEILLANCE REQUIREMENTS 4.6.2.1 The suppression chamber shall be demonstrated OPERABLE:
By verifying the suppression chamber water volume to be within the a.
limits at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
j b.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in OPERATIONAL CONDITION 1 or 2 by verifying l
the suppression chamber average water temperature to be less than or equal to 95'F, except:
1.
At least once per 5 minutes during testing which adds heat to fe the suppression chamber, by verifying the suppression chamber I
average water temperature less than or equal to 105'F.
l 2.
At least once per hour when suppression chamber average water temperature is greater than 95*F, by verifying:
a)
Suppression chamber average water temperature to be less than or equal to 110 F, and 8703180462 870312 PDR ADOCK 05000354 j
F PDR HOPE CREEK 3/4 6-13 1