0 1
DOCKET No.
50-483 UNIT NAME CALLAWAY UNIT 1 DAR 3/10/87 COMPLETED BY B. W. KEITil TELEPIIONE 314/676 8742 PART A OPERATIONS
SUMMARY
The plant operated at approximately 100% power throughout the month with the exception of the power ramp up completion on 2/1/87 following the 1/30/87 maintenance outage.
PART B PORY AND SAFETY VALVE SUPT 4ARY None CA 8804 04/10/85
($P 72 04204 PAge 1 Of 4 0703100329 070220
((.Ml PDft ADUCK 03000403 li PDR
,f,
s Part C AVERACE DAILY UNIT POWER LEVEL DOCKET No.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 3/10/87 COMPLETED BY B. W. KEITH TELEP110NE 314/676-8742 HONTit s FEBRUARY 1987 AVF9 ACE DAILY POWER LEVEL AVERACE DAILY POWER LEVEL DAY (HWe Net)
DAY (HWe Net) 1 958 17 1112 2
1102 18 1110 1
1109 19 1111 4
1111 20 1111 5
1110 21 1112 6
1111 22 1112 7
1109 23 1111 8
1112 24 1111 9
1113 25 1110 10 1112 26 1106 11 1112 27 1107 12 1111 28 1105 13 1110 29 14 1108 30 15 1108 31 16 1113 CA 8804 04/10/A5 QDP 7Z.04204 rase 2 of 4
s s
Pcrt D OPERATINC DATA REPORT DOCKET NO.
50 483 UNIT NAME CALLAWAY UNIT 1 DATE 3/10/87 COMPLETED BY B. W. KEITil TELEPil0NE 314/676-8742 OPERATING STATUS (YTD CUM )
1.
REPORTING PERIOD: February 1987 CROSS IIOl'RS IN REPORTING PERIOD: 672 (1416 19238.5) 2.
CURRENTLY Al'Tl!ORIZED POWER LEVEL (Wt):
3411 MAX. DEPEND. CAPACITY (MWe-Net):
1120 DESIGN ELECTRICAL RATING (MWe-Net):
1171*
- At stretch power level which is not currently authorized under the Operating License.
3.
POWER LEVEL TO WillCII RESTRICTED (IF ANY) (MWe-Net):
100%
4 REASONS }VR RESTRICTION (IF ANY):
TilIS MONTil YR TO DATE CUMULATIVE 5.
NUMBER OF 110URS REACTOR WAS CRITICAL...............
672.0 1394.2 17164.3 6.
REACTOR RESERVE SlflJTDOWN ll0URS.....................
0 0
0 7.
I!OURS CENERATOR ON LINE............................
672.0 1389.0 16700.9 8
LWIT RESERVE S!!UTDOWN 110URS........................
0 0
0 9.
CPOSS 11TERMAL ENERCY CENERATED (MWil)...............
2,278,365 4,588,402 53,158,297 10 CROSS ELECTRICAL ENERCY CENERATED (MWil)............
777,540 1,562,867 17,956,005
- 11. NET ELECTRICAL ENERCY CENERATED (MWil)..............
742,289 1,491,387 17,059,287
- 12. REACTOR S ERVICE FACTOR.............................
100%
98.5%
89.2%
- 13. REACTOR AVAlt. ABILITY FACTOR........................
100%
98.5%
89.2%
14 LW IT SERVI CE FACTOR................................
100%
98.1%
86.8%
- 15. UNIT AVAILABILITY FACTOR...........................
100%
98.1%
86.8%
16 TWIT CA PACITY FACTOR (Us i ng MDC)...................
98.6%
94.0%
79.2%
I 17.
l' NIT CAPACITY FACTOR (Uiting Design MWe)............
94.3%
89.9%
75.7%
18 (W IT IV RCED OUTACE RATE............................
0.0%
1.9%
4.6%
19 SifUTDOWN.i SCllEDULED OVER NEXT 6 MONTllS (TYPE, DATE, AND Dt* RATION OF EACll):
l 37 'ay planned maintenance outage starting April 4, 1987.
l 20 IF S!(UT fx4N AT END OF KEPORTING ITRIOD, EST! HATED DATE OF STARIUP:
CA 8804 04/10/85 4
QDP ZZ 04204 Pase 3 of 4
e Part E LWIT SHUIDOLWS AND P06TR REDUCTIONS DOCKET NO.
50-483 LMIT NAME CALLAWAY LWIT 1 DATE 3/10/87 COMPLETED BY B. W. KEITH TELEPHONE 314/676-8742 REPORT. M : FEBRUARY 1987 MEIHOD OF TYPE SHUITINC D0kW F: FORCED DURATION THE REACTOR OR DATE S: SGETLED (HOCRS)
REASON REDUCING PCL'ER.
CORRECTIVE ACTIONS / COMMENTS Mone SL'MMUtY:
REASON MET" D A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR IEST 2: MANUAL SCRAM C: REFUELING 3: AUIDMATIC SCRAM D: RECULA11)RY RESTRICTION 4: OTHER (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE C: OPERATIONAL ERROR (EXPIAIN)
CA-#804 R: 011ER (EXPIAIN) 04/10/85 QDP-ZZ-04204 Page 4 of 4
.I.
.1 Uivxw Etscraic n
Casaney Filant March 12, 1987 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-1462
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT FEBRUARY 1987 The enclosed Monthly Operating Report for February 1987 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
4m G. L. Randolph Manager, Callaway Plant sb W$ 0 W 9
reMET DA/TPS/DhP/BWKdra Enclosure cc: Distribution attached lf s al Maky Mhest PO Box 6;O fusart MO 6525f
'd,-
f, e
~
cc distribution for ULNRC-1462 3
J with enclosures Mr. W. L. Forney, Chief Project Section IA U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 4
Mr. Paul O'Connor (2 copies)
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 i
NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 j
Jefferson City, MO 65102 i