Forwards SALP Repts 50-456/87-01 & 50-457/87-01 for Dec 1985 - Nov 1986.Performance Acceptable & Directed Toward Quality Const & Safe Initial Startup Activities
ML20207R450
Person / Time
Site: Braidwood  
Issue date: 03/09/1987
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20207R451 List:
References
NUDOCS 8703170239
Download: ML20207R450 (3)


See also: IR 05000456/1987001

Text

m

..

.

E

p

MAR

9 1987

Docket No. 50-456

Docket No. 50-457

Comonwealth Edison Company

ATTN: Mr. Cordell Reed

-Vice President

Post Office Box 767

Chicago, IL -60690

Gentlemen:

Enclosed for your review, prior to our scheduled meeting of March 17, 1987,

is the SALP 6 Board Report for the Braidwood Station, covering the period

December 1, 1985, through November 30, 1986.

In accordance with NRC policy, I have reviewed the SALP Board assessment and

concur with their ratings. Overall,'we find that your performance was

acceptable and directed toward quality construction, and safe initial startup

activities. Your performance had either remained the same or improved in

all functional areas during the assessment period resulting in either

Category 1 or 2 ratings. This represents a significant accomplishment

considering the transitional construction /preoperational/ operational phases

that the station underwent ar.d the extensive effort required by you to resolve

construction and licensing issues, all of which required a large commitment

of resources. However, a continued high level of management attention should

be directed toward the implementation of the operational program to assure

continued good performance. Highlights of the report are set forth below:

1.

Several functional areas relating to the plant construction area,

identified separately in the previous SALP reports, have been consolidated

into a single " construction" functional area in this report. This area

was rated Category 2, and represents the successful completion of

construction for Braidwood Unit 1 and acceptable performance for

construction of Braidwood Unit 2.

2.

In the functional areas of Operational Readiness and Initial Fuel

Loading, Preoperational Testing, and Quality Programs and Administrative

Controls Affecting Quality your performance was rated Category 1 with

the later two representing an improvement from Category 2s in the

previous assessment. These ratings are in recognition of the outstanding

work the Braidwood station has done in resolving the issues mentioned

above and in conducting testing and initial fuel loading activities.

3.

All other functional areas were rated Category 2, with no functional area

rating declining since the previous assessment.

!

B703170239 870309

PDR

ADOCK 05000456

'

C

PDR

M

b

&

.

.I

Comonwealth Edison Company

2

MAR

9IW

While you will have sufficient opportunity to present your coments at the

meeting on March 17, we also request written comments within 30 days after

the meeting. Upon receipt, your comments will be evaluated and our conclusion

relative to them will be provided to you.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the SALP

Report will be placed in the NRC's Public Document Room.

No reply to this letter is required at this time; however, should you have any

questions concerning the SALP Report, we would be pleased to discuss them with

you.

Sincerely,

W!bbi cf gud by!

A. be: hwie

A. Bert Davis

Acting Regional Administrator

Enclosure: SALP 6 Board Report

No. 50-456/87001; 50-457/87001

See Attached Distribution

%s

Nb

RIII

RIII

RIII

RIII

II RIII

RIII

C)JMcCormick-Barger/jp

u&f

\\

GL

b

b-

d-b

LHttle N

Ch ssotimos

Pjperiello Davis

gs

3 -5-s 7

$\\0

k\\d

8)'

'

1

,

9

e

Commonwealth Edison Company

3 MAR

g $$7

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance Division

E. Chan, OGC

J. Moore, OGC

G. Berry, OGC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

J. M. Taylor, Director, IE

H. R. Denton, Director, NRR

Regional Administrators

RI, RII, RIV, RV

L. W. Zech, Chairman

J. K. Asselstine, Commissioner

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner-

K. M. Carr, Commissioner

NRR Project Manager

H. L. Thompson, NRR

J. A. Axelrad, IE

M. R. Johnson, IE SALP Coordinator

RIII PRR

RIII SGA

State Liaison Officer, State of Illinois

INP0