ML20207R116
| ML20207R116 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/25/1987 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 1-SR-87-009, 1-SR-87-9, ANPP-00159-JGH, ANPP-159-JGH, NUDOCS 8703110224 | |
| Download: ML20207R116 (2) | |
Text
,
/ ^ l, ;?
a RECEIVED tiitc Arizona Nuclear Power Projectf337 fM -2 $I I: 20 P.o. box 52034 e PHOENIX. ARIZONA 85072-2M4 ANPP-00159-JgggJEM-96.03 February 25,19dy ME Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368
Subject:
Palo Verde Nuclear Generating Station Unit I and 2 Docket Nos. STN 50-528 and 50-529 (License NPF-41 and NPF-51)
Special Report 1-SR-87-009 File: 87-020-404
Dear Mr. Martin:
Attached please find a Special Report 1-SR-87-009 prepared and submitted pursuant to Technical Specifications 3.4.4 and 6.9.2.
This report discusses Steam Generator tubes plugged as a result of an Inservice Inspection.
If you have any questions, please contact Tom Bradish, Compliance Supervisor at (602) 932-5300, Ext. 6936.
Very tr ly yours, Y ' JL $
J. G. Haynes Vice President Nuclear Production JGH/TDS/JEM/cid i
Attachment cc:
O. M. DeMichele (all w/a)
E. E. Van Brunt, Jr.
R. P. Zimmerman R. C. Sorenson E. A. Licitra A. C. Gehr INED Records Center
~
B 03110224 870225 PDR ADOCK 0500 8
S ff-d/
e c ; ?,,~
e
~ PAID VERDE. NUCLEAR GENERATING STATION.
' Special Report 1-SR-87-009' Steam Generator: Tube Plugging Docket Nos.'STN-528 and STN-529.
2 :
-License Nos. NPF-41 and NPF 1 4
.This'special r hort is required. by Palo Verde Unit 1 Technical Specification 3.4.4
~
section 4.4.4'.5 REPORTS a, ~ within 15 days following the ~ completion of each inservice
- inspection of, steam generator tubes.
On February 17, 1987, Palo Verde Unit 1 was in Mode 5 (COLD SHUTDOWN), when an inservice inspection of_both steam generators was completed. The inspection resulted in the plugging of 20 tubes in steam generator number 1 and 14 tubes in steam generator number 2.
The complete results of the steam generator _ tube inservice inspection will be submitted to the Commission in a Special Report within 12 months ~following completion of the inspection as required by Technical Specification section 4.4.4.5 REPORTS b.
Unit 2 was also in Mode 5 (COLD SHUTDOWN) at this time.
'A management decision was
.made to inspect the steam generator tubes in the areas that tubes were plugged in Unit 1.
There were 30 tubes plugged in steam generator number 1 and 21 tubes plugged in' steam generator number 2.
This was not an inservice inspection in Unit 2, but a voluntary, prudent management action in an effort to prevent future tube leaks. Therefore, this is a voluntary section of the report and is not required by Technical Specifications.
k.