ML20207R116

From kanterella
Jump to navigation Jump to search
Special Rept 1-SR-87-009:on 870217,tubes in Steam Generators 1 & 2 Plugged,Resulting from Inservice Insp of Both.Mgt Decision to Inspect Unit 2 Found 30 Tubes Plugged in Steam Generator 1 & 21 Tubes in 2
ML20207R116
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/25/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
1-SR-87-009, 1-SR-87-9, ANPP-00159-JGH, ANPP-159-JGH, NUDOCS 8703110224
Download: ML20207R116 (2)


Text

,

/ ^ l, ;?

a RECEIVED tiitc Arizona Nuclear P.o. box 52034 e PHOENIX.Power Projectf337 fM -2 $I I: 20 ARIZONA 85072-2M4 ANPP-00159-JgggJEM-96.03 February 25,19dy ME Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368

Subject:

Palo Verde Nuclear Generating Station Unit I and 2 Docket Nos. STN 50-528 and 50-529 (License NPF-41 and NPF-51)

Special Report 1-SR-87-009 ,

File: 87-020-404 i

Dear Mr. Martin:

Attached please find a Special Report 1-SR-87-009 prepared and submitted pursuant I to Technical Specifications 3.4.4 and 6.9.2. This report discusses Steam Generator tubes plugged as a result of an Inservice Inspection.

If you have any questions, please contact Tom Bradish, Compliance Supervisor l at (602) 932-5300, Ext. 6936.  !

Very tr ly yours, Y ' JL $

J. G. Haynes Vice President Nuclear Production JGH/TDS/JEM/cid i

Attachment cc: O. M. DeMichele (all w/a)

E. E. Van Brunt, Jr.

R. P. Zimmerman R. C. Sorenson E. A. Licitra A. C. Gehr INED Records Center

~

B 03110224 870225 8 PDR ADOCK 0500 S

ff-d/

e c ; ? , ,~ -

e

~ PAID VERDE. NUCLEAR GENERATING STATION.

' Special Report 1-SR-87-009' Steam Generator: Tube Plugging 2 : Docket Nos.'STN-528 and STN-529.

-License Nos. NPF-41 and NPF 4 1

.This'special r hort is required. by Palo Verde Unit 1 Technical Specification 3.4.4

~

section 4.4.4'.5 REPORTS a, ~ within 15 days following the ~ completion of each inservice

inspection of, steam generator tubes.

On February 17, 1987, Palo Verde Unit 1 was in Mode 5 (COLD SHUTDOWN), when an inservice inspection of_both steam generators was completed. The inspection resulted in the plugging of 20 tubes in steam generator number 1 and 14 tubes in steam generator number 2.

The complete results of the steam generator _ tube inservice inspection will be submitted to the Commission in a Special Report within 12 months ~following completion of the inspection as required by Technical Specification section 4.4.4.5 REPORTS b.

Unit 2 was also in Mode 5 (COLD SHUTDOWN) at this time. 'A management decision was

.made to inspect the steam generator tubes in the areas that tubes were plugged in Unit 1. There were 30 tubes plugged in steam generator number 1 and 21 tubes plugged in' steam generator number 2.

This was not an inservice inspection in Unit 2, but a voluntary, prudent management action in an effort to prevent future tube leaks. Therefore, this is a voluntary section of the report and is not required by Technical Specifications.

k.