a Omaha Public Power District 16i darney Omaha. Nebraska 68102 2247 402/536 4000 January 16, 1987 TS-FC-87-22 LIC-87-024 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
Inspection Report 86 Notice of Violation
Reference:
Docket No. 50-285 Gentlemen:
Omaha Public Power District (0 PPD) recently received your letter requesting additional information addressing the portion of Violation 285/8603-01 con-cerning valves F0-116, F0-117, F0-118 and F0-119.
OPPD's response is attached.
If OPPD can be of further assistance, please do not hesitate to contact us.
Sinc el R. L. Andrews Division Manager Nuclear Production RLA/rh Attachment c:
U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
Washington, D.C.
20036 Mr. P. H. Harrell, NRC Senior Resident Inspector 8701270230 870116 fEOI PDR ADOCK 05000285 G
PDR u.. r,n,,..
e Attachment to Docket: 50-285/86-03 OPPD's response to the NRC's requests for additional information regarding Inspection Report 50-285/86-03, dated December 19, 1986, are as follows:
a.
NRC Request Do records exist that indicate F0-118 was pro-vided as a Stockham valve by the diesel genera-tor supplier?
OPPD Response No.
b.
NRC Request Do records exist that indicate F0-116, F0-117 and F0-119 were provided as Crane valves by the diesel generator supplier?
OPPD Response No.
c.
NRC Request If the answer to a. and/or b. above is No, do you have records to show that the valves were properly receipt inspected and installed in accordance with approved design changes?
OPPD Response No.
d.
NRC Request If the answer to c. above is No, have you per-formed an engineering evaluation to verify that the valves installed in this safety-related sys-tem can perform their intended safety function?
OPPD Response Yes; OPPD has performed an engineering evalua-tion which concludes that valves F0-116, F0-117, F0-118 and F0-119 will perform their intended i
safety function.