a AVERAGE' DAILY UNIT POWER LEVEL
' DOCKET NO.' 50-423 UNIT Millstone Unit No.- 3 DAiE January 7, 1967 COMPLETED BY A. Elms TELEPHONE (203)-444-5388
-MONTH December DAY AVERAGE DAILY, POWER. LEVEL DAY AVERAGE' DAILY POWER LEVEL
.(MWe-Net)
-(MWe-Net) 1-1,144 17
- 1,145
~2 1,140 18 1,146 3
1,124 19 1,149 4
1,117 20 1,134 5'
1;143 21 1,146 6:
1,134-22 1,142 i7-1,144 23 1,147-8 1,143 24
~1,144 9
'1,144 -
25 1,146 10 1,144 26 1,142 11-.
1,144 27 1,143 12-1,141 28
- 1,143 13' 1,142 29 1,143 14 1,143 30 1,143 15 1,142 31 1,143 16 1,138
/
\\\\
3g22n88 8t6881=
PDR a
g
^
- 465 NRC OPERATING STATUS REPORT COMPLETED BY REACTOR ENGINEERIN6 H44444
- 1. DOCKET.... 50-423 OPERATING STATUS
- 2. REPORTINE PERIOD...KCENER 1986 00TA6E + ONLIE HOURS.. 0
+ 744
= 744
- 3. UTILITY CONTACT.................A. L. ELMS 203-444-5388
- HeseneH 4.
LICENSED THERMAL P0NER.........................................
3411
- M.LLSTONE e
- 5. NAMEPLA TE R ATIN6 (6ROSS ME)................................... 1,253 INI
- "Nii 3
- * * *4Hi4H I
- 7. MAI! MUM DEPENDABLE CAPACITY (GROSS WE).........................
!!97
- 8. RAIIMUM DEPENDABLE CAPACITY (NET ME)........................... 1141.93 9.
IF CHAN6ES OCCUR ABOVE SINCE LAST REPORT, REASONS ARE...........
N/A
- 10. PONER LEVEL TO NHICH RESTRICTED, IF ANY (NET WEl...............N/A
!!. REASON FOR RESTRICil0N, IF ANY....N/A MONTH YEAR TO DATE CUMULATIVE 10 'JATE 33333 333333333333 R33333333333333333
- 12. HOURS IN REPORTING PERIOD 744.0 6072.0 6072.0
- 13. HUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 5412.8 5412.8
- 14. REACTOR RESERVE SHUTDONN HOURS 0.0 83.2 83.2
- 15. HOURS GENERATOR ONLINE 744.0 5355.9 5355.9
- 16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 17. GROSS THERMAL ENER6Y BENERATED (MH) 2532654.0 17739924.2 17739924.2
- 18. 6ROSS ELECTRICAL ENERSY GENERATED (MNH) 885280.5 6133084.5 6133064.5
- 19. NET ELECTRICAL ENERGY SENERATED (MNH) 849236.2 5861762.7 5861762.7
- 20. UNIT SERVICE FACTOR 100.0 88.2 88.2
- 21. UNIT AVAILABILITY FACTOR 100.0 88.2 88.2
- 22. UNIT CAPACITY FACTOR (USING MDC NET) 100.0 84.1 84.1
- 23. UNIT CAPACITY FACTOR (USING DER NET) 98.9 83.7 83.7
- 24. UNIT FORCED 00TA6E RATE 0.0 11.8 11.8
- 25. UNIT FORCED DUTAGE HOURS 0.0 716.1 716.1 SHUIDONNE SCHEDULED OVER NEIT S!! MONTHS (TYPE, DATE, AND DURATION OF EACH)..............
March 14 1987 - Mid Cycle Outage - Approxisately 4 weeks IF CURRENTLY SHUIDO W, ESTIMATED STARTUP DATE......N/A
i 4
i UNIT SHUTDOWNS AND POWER REDUCTIONS i
DOCKET NO. 50-423 UNIT Millstone Unit No. 3:~
l DATE January 7, 1987 i
COMPLETED BY A. Elms TELEPHONE (203) 444-5388 REPORT MONTH December 1986 I
Method of Licensee Cause & Corrective l.
Duration
. Shutting.
Event-System-Component Action to No.
Date Type (1) (Hours)
Reason (2)
Down Reactor (3) Report #
Code,_
Code Prevent Recurrence Nona l
i l
1 i
i 1
-Reason:
-Method:
Exhibit G - Instructions 2
3 4
F:
Forced S:
Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of. Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3.- Automatic Scram
-Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File.(NUREG-0161)
E - Operator Training & License
. previous month Examination 5 - Power Reduction S i
F - Administrative (Duration = 0).
Exhibit 1 --Same Source G - Operational Error (Explain) 9 - Other (Explain)_.
H - Other-(Explain) i 4
A N UTILITIES cenerai Offices. seiden street. seriin. Connecticut vY[
cn$a cone =,
P.O. BOX 270 e n*e **'ea wa c==
HARTFORD. CONNECTICUT 061414270
%Z",',17"T.'c;~
(203) 665 5000 f
L L
J January 12, 1987 MP-9905 Re:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423
Dear Sir:
In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 87-01 covering operations for the month of December is hereby forwarded.
Yoars truly, NORTHEAST NUCLEAR ENERGY COMPANY kt/f
^
tuCL -
Ste hen Scace Station Superintendent Millstone Nuclear Power Station SES/AE: sb Attachment cc: