.a AVSRAGE DAILY UNIT POWER LEVEL' i
Docket No.
50-272 Unit Name,_
Salem # 1 Date January 10,1987 Completed by-Pell White
. Telephone 609-935-6000 Extension 4451-
' Month December 1986 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET)
(MWe-NET) 1 1137 17
-1135' 2
1137 18 1135~
~3 1132 19 1123 4
1132 20 1133 5
1132 21 1114 6
1132 22 1126 7-1032 23 1121 8
1131' 24 1119 9
1135 25 1132 10 1133 26 1068 11 1128 27 917 12 1129 28 1041 13 1124 29 1117
-14 1135 30 954 15 1135 31 875 16 1135
-P. 8.1-7 R1' J
\\/ l 870'1200470 B61231 I
.i.
PDR ADOCK 05000272 R
,..., _.. _ _,,. _,. ~, - -. -. _. _ _, -... _ _.. - _.. _. - _ _ ~. _. -
nr
.. OP$ RATING DATA REPORT' Docket No.50-272 Date ' January 10,1987-n Telephone 935-6000
' Completed:by Pell White Extension *4451
-Operating Status
~
.l.
Unit Name Salem No.
1.
Notes 12.-
Reporting Period
' December 1986 3.
Licensed Thermal Power (NWt) 3411
- 4..
Nameplate Rating (Gross ' MWe)
ITN 5..
Design' Electrical Rating (Net MWe) '
IIT3
=6.
Maximum Dependable Capacity (Gross MWe)TITF 7.
~ Maximum Dependable Capacity (Net MWe) ITDT 8.
If Changes Occur in Capacity Ratings (items 3 through 7) since Last.
Report,.Give Reason N/A
.9..
Power Level to'Which Restricted, if any (Net MWe)
Variable
- 10. Reasons for Restrictions, if any Variable power restrictions due to power transformer This Month Year to Date Cumulative
- 11. Hours in Reporting Period
-744 8760 83329
- 12. No. of Hrs. Reactor was Critical 744 7037.2 51282.6
- 13. Reactor Reserve-Shutdown Mrs.
0 0
0 14.-Hours Generator On-Line 744 6923.8 49428.6
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2493341 22172017 152656046-l
'17.-Gross Elec. Energy Generated l.
(MWH) 848180 7401990 50698000 l
- 18. Net Elec. Energy Generated (MWH) 819757 7079276 48184768
- 19. Unit Service Factor 100 79.0 59.3 l-
- 20. Unit' Availability Factor
-100 79.0 59.3
- 21. Unit Capacity Factor
[
(using MDC Net) 99.6 73.1 52.3
- 22. Unit Capacity Factor _
(using DER Net) 98.8 72.5 51.9
- 23. Unit Forced Outage Rate 0
9.5 26.5
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
[
2-10 Replace Aux Power Transformer - 10 Days
- 25. If shutdown at end o'f Report Period, Estimated Date of Startup:
i N/A l
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved l.
L.
Initial Criticality 9/30/76 12/11/76 Initial Electricity 11/1/76 12/25/76 Commercial Operation 12/20/76 6/30/77 8-1-7.R2 i
UNIT SHUTDOWN AND POWER REDUCTIONS-DockSt No.50-272 REPORT MONTH DECEMBER 1986 Unit Name salem No.1 Date January 10,1986 Completed by Pell White Telephone 609-935-6000 Extension 4451 Method of Duration Shutting License Cause and Corrective No.
Date Type Hours Reason Down Event System Component Action to 1
2 Reactor Report Code 4 Code 5 Prevent Recurrence Station Power Load Transformer Station 786 12-27 F
6 B
Reduction EG TRANSF Power Auxiliary Station Power Load Transformer Station EG TRANSF Power Auxiliary 788 12-27 F
17 B
Reduction Station Power Load Transformer Station EG TRANSF Power Auxiliary 796 12-30 F
.6 B
Reduction Station Power Load Transformer Station EG TRANSF Power Auxiliary 798 12-30 F
15.0 B
Reduction Station Power Load Transformer Station EG TRANSF Power Auxiliary 802 12-31 F
15.3 B
Reduction Station Power Let!
Transformer Station EG TRANSF Power Auxiliary 804 12-31 F
8.7 B
Recoction 3' Method 4 Exhibit G 5 Exhibit 1 1
2 Reason F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram.
for Prepara-Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161) 1
- = = -
7-MAJOR PLANT MODIFICATIONS DOCKET NO.:
50-272 REPORT MONTH-DECEMBER 1986 UNIT NAME:
Salem 1 DATE:
January 10, 1987 COMPLETED BY:
L. Miller-TELEPHONE:
609/339-4497
- DCR NO.
PRINCIPAL SYSTEM SUBJECT There were no DCRs reported completed during the period.
DCR - Design Change Request
- -. =. - -. -.
. # -]
PSE&G SALEM GENERATING STATION'
'[
SAFETY RELATED WOPK ORDER LOG-SALEM UNIT 1
^
WO NO UNIT EQUIPMENT IDENTIFICATION 0099185857 j
1 SI FLOW METER 1
FAILURE DESCRIPTION:
THERE IS A FLANGE-LEAK ON'FE-0922 BETWEEN llSJ37-AND j
12SJ28.
PLEASE REPAIR AND INVESTIGATE.
CORRECTIVE ACTION:
REPLACED GASKETS AND TORQUED FLANGES..
1 i
8607230085 i
FAILURE DESCRIPTION:
- 11 CONTROL ROOM AIR CONDITION SUPPLY. FAN DISCHARGE j
FLEXIBLE EXPANSION COUPLING IS TORN.
THE TEAR IS ON THE IB SIDE.
REPLEASE REPAIR AS NECESSARY.
I CORRECTIVE ACTION:
REPLACED EXPANSION JOINT.
8608130319 1
REACTOR VESSEL LEVEL 4
FAILURE DESCRIPTION:
REMOTE DISPLAY ON CONT RM BEZEL IS IN MALFUNCTION WITH 1
SELF TEST FAILURE., REWORK AS NECESSARY.
1 4
j CORRECTIVE ACTION:
REPLACED Ull PRONG ON CHIP 5000H WITH TEST CHIP A2 4
BOARD.
REMOVED TEST CHIP AND REINSTALLED ORIGINAL CHIP.
VERIFIED PROPER OPERATION.
1 l
i i
1 1
SALEM UNIT 1 WO NO UNIT EQUIPMENT IDENTIFICATION 86011050070 1
250 VDC BATTERY FAILURE DESCRIPTION:
250 VDC BATTERY /WITH BATTERY ON FLOAT VERIFY EACH CONN CELL IS GREATER THAN 2.13V. FULL ELECTROLYTE AND SP GR GREATER THAN 1.200 (CORR TO 77 F). VERIFY CELL VOLTS HAVE NOT DECREASED MORE THAN 0.23V FROM ORIGINAL ACCEPT TEST PLUS SP GR HAS NOT DECREASED MORE THAN 0.02 FROM PREVIOUS TEST RESULT.
CORRECTIVE ACTION:
PERFORMED QUARTERLY TESTING ON BATTERY AS PER M3M PROCEDURE, BATTERY TESTED SAT, SELECTED NEW PILOT CELL 46.
8611300092 1
SW308 FAILURE DESCRIPTION:
THE VALVE FAILED TO OPEN WITH 130 PSIG IN SERVICE WATER HEADER. THE MOORE CONTROLLER SETPOINT HAD TO BE LOWERED TO APPROXIMATELY 90 PSIG BEFORE THE VALVE WOULD OPEN.
PLEASE VERIFY PROPER SETPOINT.
CORRECTIVE ACTION:
FOUND CONTROLLER OUT OF SPEC.
ALIGNED TO SPEC.
8611300106 1
SW311 FAILURE DESCRIPTION:
THE VALVE FAILED TO OPEN WITH 130 PSIG IN HEADER THE MOORE CONTROLLER SETPONT HAD TO BE LOWERED TO APPROXIMATELY 90 PSIG BEFORE THE VALVE WOULD OPEN.
PLEASE VERIFY PROPER SETPOINT.
CORRECTIVE ACTION:
FOUND CONTROLLER OUT OF SPEC.
ALIGNED TO SPEC.
N SALEM UNIT 1 WO NO UNIT EQUIPMENT IDENTIFICATION 8612010594 1
SSPS TRAIN B BUS 3 FAILURE DESCRIPTION:
THERE IS A BLOWN FUSE ON BUS 3 OF SSPS TRAIN B.
CORRECTIVE ACTION:
8612010870 1
AIR SUPPLY
~
FAILURE DESCRIPTION:
AIR SUPPLY LINE IS LEAKING AT FITTING ON 11WG13.
PLEASE REPAIR.
CORRECTIVE ACTION:
REPLACED PIPE FITTING AND FEMALE TUBING FITTING.
8612070121 1
REACTOR VESSEL LEVEL REMOTE DISPLAY FAILURE DESCRIPTION:
THE REMOTE DISPLAY IN THE CONTROL ROOM INTERMITTENTLY FAILS TO COMMUNICATE WITH THE MICROPROCESSOR, REQUIRING RESET OR POWER RESET.
REWORK AS NECESSARY, OR ASSIST VENDOR IN THE REWORK.
CORRECTIVE ACTION:
BOARD REPLACED PS2.
USED PS2 FROM A-ll BOARD.
REPLACED Z-3 ON WIRE BOARD OF THE REMOTE.
l
7 SALEM UNIT 1 WO NO UNIT EQUIPMENT IDENTIFICATION 8612090059 1
14 HOT LEG TEMPERATURE FAILURE DESCRIPTION:
- 14 RCS HOT LEG TEMP READING APPROXIMATELY 23 DEGREES HIGH.
READS 623 DEGREES FARENHEIT.
PLEASE REPAIR.
CORRECTIVE ACTION:
RECALIBRATED ITE-443A AND RECORDER ITR-443A FOUND IN SPEC.
ADJUSTED LOW LEVEL AMP TO BRING CLOSER TO REQUIRED OUTPUT.
READJUSTED RECORDER TO SPEC.
R612090661 1
13 RCP SEAL LEAKOFF INDICATOR FAILURE DESCRIPTION:
FLOW INDICATOR FAILED HIGH.
PLEASE FIX.
CORRECTIVE ACTION:
CLEANED CONTACTS ON PC BOARD AFTER FINDING ELECTRONICS FAILED HIGH.
RETURNED TO SERVICED.
VERIFIED READING AS PER CHART READING AND TRANSMITTER.
8612160049 1
11 BAT PUMP FAILURE DESCRIPTION:
11 BAT PUMP WILL NOT START FROM THE CONTROL ROOM.
NO PROBLEMS EVIDENT WITH THE BREAKER OR THE PUMP.
PLEASE INVESTIGATE AND REPAIR.
CORRECTIVE ACTION:
FOUND BREAKERS TRIPPING, MEGGERED MOTOR, FOUND SAT, UNCOUPLED MOTOR, FOUND PUMP SEIZED.
SALEM UNIT 1 WO NO UNIT EQUIPMENT IDENTIFICATION 8612180121 1
11 BAT PUMP FAILURE DESCRIPTION:
PUMP IS BOUND.
PLEASE INVESTIGATE AND REPAIR.
CORRECTIVE ACTION:
REPLACED OLD PUMP WITH REBUILT PUMP.
8612210011 1
11 SERVICE WATER PP STRAINER FAILURE DESCRIPTION:
THE STRAINER SHEAR KEYS HAVE SHEARED.
PLEASE REPAIR THE STRAINER AND REPLACE SHEAR KEYS, CORRECTIVE ACTION:
REPIJ.CED BOTTOM SHOES AND SHAFT.
8612290082 1
1CV41 GEARBOX FAILURE DESCRIPTON:
ICV 41, MOV, IS LEAKING OIL WEHRE THE CLUTCH HANDLE ENTERS THE GEARBOX.
PLEASE INVESTIGATE AND REPAIR, CORRECTIVE ACTION:
TIGHTENED UP ON GASKET COVER.
SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
- UNIT NO.'l DECEMBER 1986 The Unit began the period' operating at.100% power,.1130 MW Net. On December 7, 1986, power was briefly. reduced to 90% while work was performed on the Heater Drain Pumps..The work was completed and the Unit restored to 100% power the same day.
On December 26, 1986, power was briefly reduced to 70% to maintain system stability as per the
' load dispatcher's request.
The Unit was restored to-100% power.later the same day.
On December 27, 1986, power was reduced.to 81% due to Station Power Transformer load limitations.
Following a trip of Unit 2 on December 28, 1986, Unit No. 1 power was increased to 100% late the same morning.
Power was reduced to 81% on December 30, 1986, due to Station Power. Transformer load limitations. Late December 31, 1986, power was further reduced to 56% to clear a pressure transmitter line for No. 12 Steam Generator Feed Pump.
The Unit continued at_that-power for the remainder of the period.
REFUELING INFORMATION DOCKET NO.:
50-272 COMPLETED BY:
L.K. Miller UNIT NAME:
Salem 1 DATE:
January 10, 1987 TELEPHONE:
609/935-6000 EXTENSION:
4497 Month December 1986 1.
Refueling information has changed from last month:
YES NO X
2.
Scheduled date for next refueling:
September 12, 1987 3.
Scheduled date for restart following refueling November 26, 1987 4.
A)
Will Technical Specification changes or other license amendments be required?
YES NO NOT DETERMINED TO DATE X
B)
Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES NO X
If no, when is it scheduled?
August 1987 5.
Scheduled date(s) for submitting proposed licensing action:
August 1987 if required 6.
Important licensing considerations associated with refueling:
NONE 7.
Number of Fuel Assemblies:
A)
Incore 193 B)
In Spent Fuel Storage 380 8.
Present licensed spent fuel storage capacity:
1170 Future spent fuel storage capacity:
1170 9.
Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:
September 2001 8-1-7.R4
b 4
O PSEG-Public Service Electric and Gas Cornpany P.O. Box E Hancocks Bridge, New Jersey 08038 Salern Generating Station January 12, 1987 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission l
_ Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of December 1986 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Information Since ely yours, 6
J.
Z o, Jr.
Ge eral Manager - Salem Operations JR:sl cc:
Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Enclosures 8-1-7.R4 s'
\\\\ \\
The Energy People
\\
W JtA)it t 1,4, 9 ) M 4