HOPE CREEK GENERATION STATION MONTHLY OPERATING
SUMMARY
DECEMBER 1986 The-Hope ' Creek Generating Station. completed the power. ascension program during December 1986 with the total program lasting 245 days.
During the month the unit successfully performed an MSIV closure test on December 3 and after restart, completed a Full Load Rejection Test on' December 6, 1986.
Following this-test, the
. unit was restarted on December 11, '1986 and completed a 189 hour0.00219 days <br />0.0525 hours <br />3.125e-4 weeks <br />7.19145e-5 months <br /> warrantly run (at' greater than 95% power) at 1434 on December 19, 1986 at which time the unit was declared ready for commercial operation.
The. unit continued to operate at essentially full power for the remainder of the month with the only load reduction taking place on December _26, 1986 at the request of the Electric System Operator due to low electrical system demand.
I --
WJM:t1b t
8701200347 B61231 PDR ADOCK 05000354 2 Es4 R
'/s i
r- -
I, -
AVERA0E DAILY UNIT POWER LEVEL 86-354 DOCKET NO.
UNIT Hope Creek Gen. Station 01/07/87 DATE COMPLETED BY H. Jensen TELEPHONE (609) 339-5261 December, 1986 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)
(MWe-Net) 660 1927 3
37 2
18 548 857 383 948 3
39 0
1984 4
20 639 1928 5
21 436 1920 6
22 0
1934 7
23 U
1933 8
24 0
1923 9
25 0
1006 10 26 16 1926 11 27 631 1930 12 28 972 1965 13 29 1922 1024 34 30 1946 15 31 81 16
4
-9 t
OPERA' TING DATA REPORT DOCKET NO.86-354 UNIT Bope Creek Gen. Sta.
DATE 1/01/87 COMPLETED BY H. Jensen TELEPHONE (609)339-5261 L
OPERATING ~ STATUS
'1.
REPORTING PERIOD Dec '86 GROSS HOURS IN REPORTING PERIOD 744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt) 3293 MAX. DEPEND.-CAPACITY (MWe-Net) 1978 DESIGN ELECTRICAL RATING (MWe-Net) 1967 3
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net)
None 4.
REASONS FOR RESTRICTION (IF ANY)
THIS YR TO MONTH-DATE CUMULATIVE 5
NO. OF HOURS REACTOR WAS CRITICAL 698 2679 2679 6.
- REACTOR RESERVE SHUTDOWN HOURS 9
9 8
7 HOURS GENERATOR ON LINE 585.6 1678.6 1678.6 8.
UNIT RESERVE SHUTDOWN HOURS 9
9 9
9 GROSS THERMAL ENERGY GENERATED (MWH) 1,793,799-3,624,915 3,624,915
+
10.
GROSS ELECTRICAL ENERGY GEMERATED (MWH) 587,352 1,992,659 1,992,659 i
11.
NET _ ELECTRICAL ENERGY GENERATED (MWH) 557,884 1,939,839 1,039,839 12.
REACTOR SERVICE FACTOR 13 REACTOR AVAILABILITY FACTOR 14.
UNIT SERVICE FACTOR 15 UNIT AVAILABILITY FACTOR r
16.
UNIT CAPACITY FACTOR (Using Design MDC) 17 UNIT CAPACITY FACTOR (Using Design MWe)
. 18.
UNIT FORCED OUTAGE DATE 19 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION): None i
i 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 6/28/86 INITIAL ELECTRICITY 8/1/86 COMMERCIAL OPERATION Under review
[:I OPERATING DATA REPORT UNIT SHUTDOWNS AND-POWER REDUCTIONS86-354' DOCEET NO.
UNIT NAME Hope Creek Gen. Sta..
DATE 01/01/87 COMPLETED BY H.
Jensen December'86 TELEPHONE (609)339-5261 REPORT MONTH METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F FORCED DURATION REASON REDUCING CORRECTIVE ACTION /
N 0 '.
DATE S SCHEDULED (HOURS)
(1)
POWER (2)
.COMMEllTS 19 12/3 P'
41.2 B
3 Power Ascension MSIV Full Isolation Test, Full Scram.
20 12/6 P
117 6 B
3 Power Ascension 1001l Load Rejection Test.,
21 12/1 5 F
0 A
4 Condensate Domin.
Problems.
22 12/1 3
F 0
A 4
B-MG Set Brush-Failure.
i i
I
SUMMARY
O PSIEG
~
Public Service Electric and Gas Company P.O. Box L Hancocks Bridge, New Jersey 08038 Hope Creek Operations January 7, 1987 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Dear Sir:
MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION UNIT 1 DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for December are being forwarded to you.
Sincerely yours,
[l, $ t b&
R. S. Sa]vesen General Manager -
Hope Creek Operations WJM:t1b Attachment C Distribution l
/
lb The Energy People I
v> n n m u, ins