ML20207P398

From kanterella
Jump to navigation Jump to search
Forwards Final Element Repts for Six Elements,Addressing Const,Operations & QA Employee Concerns.All Concerns Re Plant,Including Anchorages,Addressed.Listing of Rept Numbers & Related Employee Concerns Also Encl to Aid in NRC Review
ML20207P398
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/09/1987
From: Mcdonald J
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
NRC OFFICE OF ADMINISTRATION (ADM), Office of Nuclear Reactor Regulation
Shared Package
ML20207P399 List:
References
NUDOCS 8701160102
Download: ML20207P398 (10)


Text

'

TENNESSEE VALLEY AUTHORITY d Watts Bar Nuclear Plant P. O. Box 800 Spring City Tennessee 37381 January 9. 1987 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC. 20555 Attention: Nr. Harold Denton, Director of Nuclear Reactor Regulation In the Matter of the Application of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 EMPLOYEE CONCERNS TASK GROUP (ECTG)

Enclosure I provides a listing of the report numbers, the related employee concerns, a.1 the previous submittal dates if applicable. To assist you in your review of these reports, Enclosure 2 provides a comparison between the ECTG Writer's Guide recommended report format and the transmitted reports. The reports from the quality assurance category comply fully with the Writer's Guide.

Enclosure 3 transmits the final element reports for 6 elements addressing Sequoyah Nuclear Plant employee conceras in the following categories:

Construction - 3 report Operations - 3 reports Quality Assurance - 2 reports As indicated by the report cover sheets, these reports have completed final review by the Senior Review Panel and the Employee Concern Task Group management. With these final reports, all employee concerns related to Sequoyah have been addressed for 11300, Anchorages; and Quality Assurance Subcategory 80400, Nonconformance Control and Corrective Action.

Please telephone Martha Martin at (615) 365-3587 (Watts Bar) if you have any questions.

Very truly yours, TENNESSEE VALLEY AUTHORITY

  1. M*

J. A. Mcdonald Watts Bar Nuclear Plant hD 2 Site Licensing Manager I(

cc (See page 2.):

8701160102 870109 PDR ADOCK 05000327 PDR p ,

An Equal Opportunity Employer L

.- g

/ ~U.S. Nuclear Regulatory Commission cc (Enclosures):

Mr. James N. Taylor. Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D. C. 20555 U.S. Nuclear Regulatory Commission Region II Attn: Mr. Gary Zech 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia ,30323 Nr. 8. J. Youngblood, Project Director PWR Project Directorate #4 Division of PWR Licensing - A U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Room 440, 5 Story Phillips Bethesda, Maryland 20814 3181T l

l l

/

l

    1. Closurg ,

? ENCLOSURE 1 Page 1 of 2 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUNBER ISSUE Construction 11301 *IN-85-031-001 Design of Plates (Final) *IN-85-109-X04

  • 0E-QMS-8
  • IN-85-033-001
  • IN-85-103-001
  • These concerns evaluated in subcategory 11301-SQN for SQN anly and subcategory 10400 for the other sites.

NOTE: Initial report transmitted 11/17/86.

Operations 30102 KK-85-122-008 Diesel Generator Reliability (Final) II-85-122-009 Problems 11-85-122-010 IN-85-323-001 WI-85-100-003 NAS-85-001 NOTE: Initial report transmitted 10/21/86.

Operation 30807 IN-85-948-001 Clan Control Program (Final) IN-85-948-002 IN-85-948-003 NOTE: Initial report transmitted 11/04/86.

Operations 31101 K1-85-024-001 Health Physics Staff Training (Final) XI-85-102-009 XI-85-102-012 NOTE: Initial report transmitted 9/15/86.

Quality Assurance 80203 00-85-005-003 Inspection Performance (Final) IK-85-023-X02

  • I-86-101-SQN SQN-6-009-001
  • Concern I-86-101-SQN added after 9/26/86.

NOTE: An initial report was not necessary. This will be the only submittal for 80203, l

ENCLOSURE 1 Page 2 of 2 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUNBER ISSUE Quality Assurance 80402 SQN-86-002-004 Management's Interference (Final) XX-85-102-010 in Deviation Reporting

  • II-85-070-006
  • Concern XI-85-070-006 transferred to 30704.

NOTE: An initial report was not necessary. This will be the only submittal for 80402.

3181T l

l w

_ _ - . , _ _ -- . - - - - - _ - -_.,-------.my_

. ,-- e,- p. ,, . , , , , , , , -wy.-,,.9.,y- , i+%ww , , v.,w---- ,, -- - - -

4 N

t A

L I

Enclosure 2

7-

~

, . CONSTRUCTION CATEGORY E citstra 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue I. Introduction Characterization II. Summary of Perceived Problem 2.0 Summary IV. Summary of Findings Conclusions (Portion) 3.0 Evaluators Cover Sheet Information 4.0 Evaluation III. Evaluation i

Process Nethodology 5.0 Findings IV. Summary of Findings 6.0 Root Cause V. Root Cause (Collective Significance)** ** Overall Root Cause will not be considered at this report level.

7.0 Attachments / VIII. Attachmants List of Concerns i

Other items included VI. Corrective Actions in Construction Element (To be provided by Reports line orgainzations) l VII. Generic Applicability l

1905T r

6 i

OPERATIONS CATEGORY En:1:stre 2 .,

s ECTG WRITER'S GUIDE OPERATIONS (OP) ELEMENT REPORTS NOTES /CONNENTS

, 1.0 Issue I. Title The brief introduction Characterization Very brief introduction touches on the source of the concerns.

l l

2.0 Summary I. Title 1. The Conclusions are Very brief introduction towards the end of the findings.

III. Finding (Conclusions) .2. The Conclusions services as a summary of the findings.

4 i

3.0 Evaluators Cover Sheet 1. The printed name of the original evaluator (s) appears on the cover sheet.

l 2. The peer reviewer and j CEG-H approval signa-tures are also on the

cover sheet.

i 4.0 Evaluation II. Specific Evaluation

Process Methodology 5.0 Findings III. Findings l

l 1880T j -

1

Rac1:sure 2 .=

ECTG WRITER'S GUIDE OPERATIONS (OP) ELNENT REPORTS NOTES /COIRfENTS 6.0 Root Cause IV. Root Cause 1. At the element level i (Collective Significance) the Root Cause is often not,identifible.

2. Collective significance is not addressed at the element report level.

I 7.0 Attachments / II. Specific Evaluation 1. A list of the concerns List of Concerns Nethodology with text are included within this section.

2. Other reports are sometimes attached.

i

~

l i

1 1

l i

I Enclosure 3 t

I l

_ - _- - .. . - . . . - . . . _-