Forwards Test Abstract Describing Methodology to Be Used for Testing Heat Rejection Capability of Uhs,Per Commitment
ML20207P373
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/10/1987
From: Bailey J
GEORGIA POWER CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
GN-1309, NUDOCS 8701160077
Download: ML20207P373 (2)


Text

.._-

3 Southern Company Serwcca tre Post Offce Box 282 Waynesboro, Georgia 30830 Teleahone 404 7221543 404 722-8943 Vogtle Project January 10, 1987 Director of Nuclear Reactor Regulation File:

X7BC35 Attention: Mr. B. J. Youngblood Log:

GN-1309 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 ULTIMATE HEAT SINK HEAT REJECTION CAPABILITY TEST

Dear Mr. Denton:

In a' recent discussion with members of your staff, Georgia Power Company committed to provide a test abstract describing how the heat rejection capability of the ultimate heat sink will be tested.

Attached please find an abstract outlining GPC's plans for the test.

If _your staff requires any additional information, please do not hesitate to contact me.

Sincerely, J. A. Bailey Project Licensing Manager MSH:gww l

l Attachment xc:

R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. Feig B. W. Churchill, Esquire R. M. McManus i

M. A. Miller (2)

L. T. Gucwa B. Jones Vogtle Project File G. Bockhold, Jr.

t I-8701160077 870110 PDR ADOCK 05000424

[)81 A

PDR I l i

f TEST ABSTRACT 14.2.8.2.60 Ultimate Heat Sink Heat _ Rejection Capability Test l

A.

Objectives:

f f

1.

To determine the heat rejection capabilities of the NSCW cooling towers while operating under-partial heat load conditions.

2.

To evaluate the heat rejection capabilities of the NSCW cooling towers ' determined under test conditions and demonstrate that they meet the design requirements.

B.

Prerequisities:

l 1.

The NSCW systems are operable.

o i

2.

The plant is operated in a manner to provide the NSCW l

system with a heat load.

l C.

Test Method:

Heat rejection capability of NSCW cooling tower cells will l

be measured in accordance with CTI Bulletin ATC 105.

D.

Acceptance Criteria:

The heat rejection capability of the NSCW cooling towers, based on test conditions, are in accordance with design requirements.

t

- _ _ _ _,. _..