ML20207P292
| ML20207P292 | |
| Person / Time | |
|---|---|
| Site: | Hatch, Vogtle, 05000000 |
| Issue date: | 01/08/1987 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| References | |
| NUDOCS 8701150363 | |
| Download: ML20207P292 (3) | |
Text
1
(
JAN 0 81987 Georgia Power Company
- ATTN: Mr. J. H. Miller, Jr.
President P. 0. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT:
SUBMITTAL OF ANNUAL EMERGENCY EXERCISE OBJECTIVES, DETAILED SCENARIOS AND CONTROLLER PACKAGES Our letter of October 11, 1984, requested a change in the schedule for submitting emergency exercise information. for NRC review.
With very few and minor exceptions, licensees in Region II have been most cooperative in complying with the requested schedule.
The letter also provided guidance for transmitting the scenarios and exercise objectives so as to protect them from inadvertent disclosure.
Several recent submittals were given routine distribution within the NRC and were sent to the Public Document Room prior to the exercise because they were not sent to the addressee as shown below.
In order to protect the scenario and exercise objectives from disclosure to participants, you are requested to address this information to the Chief.
Emergency Preparedness Section, U. S. Nuclear Regulatory Commission, Region II, at the letterhead address, marked "to be opened by addressee only."
We appreciate your cooperation.
Please call Mr. Thomas R.
Decker on (404) 331-2559 if you have any questions.
Sincerely, Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects cc:
(Seepage 2)
Ohk oj@fyy [
PDk_
t 0
.EE3 f
.m e-Georgia Power Company 2
cc:
J. P. O'Reilly, Senior Vice President Nuclear Operations J. T. Beckham, Vice President, Plant Hatch H. C. Nix, Site Operations General Manager A. Fraser, Acting Site QA Supervisor L. Gucwa, Manager, Nuclear Safety and Licensing R. E. Conway, Senior Vice President &
Project Director D. O. Foster, Vice President, Project Support P. D. Rice, Vice President, Project Engineering R. H. Pinson, Vice President, Project Construction R. A. Thomas, Vice President, Licensing D. S. Read, General Manager, Quality Assurance C. W. Hayes, Vogtle Quality Assurance Manager W. C. Ramsey, Manager -
Readiness Review G. B. Bockhold, General Manager, Nuclear Operations M. H. Googe, Project Construction Manager E. D. Groover, Quality Assurance Site Manager -
Construction J. A. Bailey, Project Licensing Manager G. F. Trowbridge, Esq., Shaw, Pittman, Potts and Trowbridge B. W. Cnurchill, Esq., Shaw, l
Pittman, Potts and Trowbridge E. L. Blake, Jr., Esq., Shaw, Pittman, Potts and Trowbridge l
J. E. Joiner, Troutman, Sanders, Lockerman and Ashmore J. G. Ledbetter, Coninissioner, Department of Human Resources C. H. Badger, Office of Planning and Budget D. Kirkland, III, Counsel, l
Office of the Consumer's Utility l
Cour.cil
Georgia Power Company 3
cc:
D. Feig, Georgians Against Nuclear Energy M. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board Panel Dr. O. H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel G. A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel bec: E. Reis 0GC W. M. Hill, IE M. Miller, NRR 1
W. Brach, EDO M. Sinkule, RII E. Christnot, RII NRC Resident Inspectors Document Control Desk State of Georgia Hugh S. Jordan, Executive Secretary RII RII II RII
[mT er DCollins AI atonis MSinkule 12/3//86 12/g/86 1/
86p.41f/ /p6 rfu+rell UI
)lJIS 7