Submits TMI-2 Cleanup Project Directorate Weekly Status Rept for Wk of 870105-11.Defueling,unplanned Intake of Radioactive Matl,Environ Monitoring & Auxiliary & Fuel Handling Bldg Activities Discussed
ML20207P102
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/12/1987
From: Travers W
Office of Nuclear Reactor Regulation
To: Harold Denton, Miraglia F
Office of Nuclear Reactor Regulation
References
CON-NRC-TMI-87-004, CON-NRC-TMI-87-4 NUDOCS 8701150045
Download: ML20207P102 (3)


Text

_

yQ '

ce-u b

?

Q(f ;

  • L.

Q' p

g a

January 12, 1986 3;

NRC/THI-87-004 MEMOPANDUM FOR:

liarold R. Denton, Director

- Office of Nuclear Reactor Regulation cc

.R Frank J. Miraglia, Director y{

Division of PWR Licensing-B o

N3 FROM:

William D. Travers Director

.i TifI-2 Cleanup Project Directorate y,

F'

SUBJECT:

NRC THI-2_ CLEANUP PROJECT DIRECTORATE WEEKLY STATUS

}ji, TEPORT FOR January 5 - 11, 1987

-y

,,f 1.

DEFUELING u~

Me Removal.of fuel fragments and drilled caterial from the "hard crust" y

region continued. The spade nucket remains the most effective tool.

The fuel removal rate varies with a canister per day or two as a

)

typical rate.

2.

UNPLANNED INTAVsE OF RADI0 ACTIVE MATERIAL P

On Friday, January 2,1987, a senior radiol'ogical control technician G

received an unplanned intake of radioactive natorials. !!e was T[;i performing routine survey coverage of a work activity in Makeup Punp Room-1-C which is-located at the 281 foot elevation of the Auxiliary ifj Building. A local air monitor alarued while the technician was v.

exiting the area. The preliminary assessment of the intake to the jr technician is 80 MPC-hr. The regulatory linit is 520 MPC-hr per y

calendar quarter. The event is still under review by the licensee S;

and the NRC onsite staff.

%w

  • f) 3.

ENVIR0M!! ENTAL !!ONITORING

'g p;p US Environmental Protection Agency (EPA) sample analysis results

('A show that THI site liquid effluents are in accordance with e,

regulatory limits, HRC requirements, and the City of Lancaster E

Agreement, y

THI water effluents are sanpled from the station (Units 1 and 2) j.

discharge and analyzed by EPA. Gama spectrum analyses of the seven py daily composited samples December 12 - 27, 1986 indicated no TilI-2 related radioactivity.

5 EPA's gacma spectrum analysis of the NRC's TMI. outdoor air sample Q

for December 19, 1986 through January 9,1987 showed no reactor j

related radioactivity.

O A

X;.

8701150045 870112

([ ""*

kDR ADocg 05000320 PDR 3

... ~ ~.

s-om>

- nac r:au sas no soi uncu a 4o OFFICIAL. RECORD COPY

4 l

liarold R. Denton 2

January 12, 1987 Frank J. Miraglia I;RC/THI-87-004 The Lancaster water works intake ceaposited seven daily seaples Deceuber 21 - 27, 1986. The gama spectrum analyzed by EPA showed no reactor related radioactivity.

4.

AUXILIARY AliD FUEL llAf!DLIl!G BUILDII;G ACTIVITIES Testing was cor:pleted on the Fuel Handling Duilding Ventilation Systen.

Reclanation of Defueling Water Cleanup Systen (DUCS) filters continues.

Pr epurction and loading of the fuel shipping cask continued during the week.

5.

Imc EVALUATIONS It! PROGRESS Technical Specification Change Request nu;;,bers 49, 51, 52, and 54.

Recovery Operaticas Plan Change nunbers 31 and 33.

Solid Uaste Facility Technical Evaluation Report.

ifcavy Load Safety Evaluation Report, Revision 3.

Disposal of Processed Later Report.

Safety Evaluation Report for Use of Plasma Arc Cutting Torch.

Tcupornry Reactor Vessel Filtration Systeu Safety Evaluation Report, Revision 3.

Pressurizer Defueling Safety Evaluation Report.

Safety Evaluation for the Adoition of Congulant to the RCS was approved on January 5,1937.

Revised Defueling Canister Dewatering Criteria was approved on January 7, 1937.

6.

f;EETIt.GS Dr. Uillian D. Travers, Director, TriI Cleanup Project Directorate, will neet with THI Alert on Janudry 14,1937 at 7:30 PM in liarrisburg to discuss the subject of the accident generated water deposition.

The next necting of the Advisory Panel for the Decontanination of Three Nile Island Unit 2 will be held on January 21, 1937 frca 7:00 to 10:00 PM at the Lancaster Council Chanbers, Public Safety Building, 201 fiorth Duke Street, Lancaster, PA.

Persons desiring to speak before the Advisory Panel are requested to contact Nr. Thorus Saithgall at 717-::91-1042, or write hic at 2122

!!arietta Avenue, Lancaster, PA 17603.

original signed by John Thomas for:

Willien D. Travers Director THI-2 Cleanup Project Directorate

"'C'>

^">

une ro.:.u ais tio so> uncu o2d OFFICIAL RECORD COPY

. '1 liarold R, Denton 3

January 12, 1987 Frank J. !!iraglia flRC/Ti1I-87-004 Il!TERf(AL DISTRIBUTI0ii CEHTRAL FILE fRC PDR LCCAL POR EDO GCC EPA DOE RI Regional Adninistretor RI Division Directors Public Affairs, RI Stste Liaison, RI Tlil !!Q r/f T!!I SITE r/f Ti!I-2 Project Section File Till-1 P.esident Office (5)

T!!I Cleanup Project Directorate (14) 4 Cl,,,

,TM,IC,$ g h OFFICE) TMIC

,TM1CP P

y,TM C J,T,ho as,>,,,,,

, WTv,e r,s.,,,,

suRN e >

,s,,

DATE)

[ [O7 7

1[l2[b7 1[ Q/b7

..s.......

N RC F._. RM 318 (10 80) NRCM 0240 OFFICIAL RECORD COPY