ML20207N868

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1988 for Callaway Plant Unit 1
ML20207N868
Person / Time
Site: Callaway 
Issue date: 09/30/1988
From: Blosser J, Mccann R
UNION ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
ULNRC-1843, NUDOCS 8810190429
Download: ML20207N868 (6)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

DOCKET No.

50-483 LNIT NAME CAIJRAY L' NIT 1 1

DATE 10-07-88 t

t COMPLETED BY R. J. McCann TELEril0NE 314/676 8243 I

1 i

l PART A CPERATIONS SLtNARY l

l The plant operated at approximately 100% power with the following exceptions.

1) On Septester 2,1988, a reactor trip on S/C Lo Lo level occurred due to a trip of 2 condensate i

pumps caused by inadvertent opentes of a potential trawformer on PB03. Power operations resumed on September 3, 1988 I

2) On September 23, 1968, power was reduced to below 48% (P-8 setpt) to allow replacement of a RCS flow transmitter (BB-FI 416). Full power operations resumed on September 24, 1988 i

s J

t PART B PORV AND SAFE 7Y VALVE Sl' WARY

[

k None f

,1 i

4 l

1 l

t t

1

?

i

?

I l

l i

I l

8910190429 880930

[,g ADOCK 0500g:@3 DR f

Ptge 1 of 4

-t f

+

I l

Part C i

AVERACE DAILY UNIT POWER LEVEL t

i DOCKET No.

50-483 i

i UNIT NAME CALLAWAY UNIT 1 t

DATE 10 07 88 L

COMPLETED BY R. J. McCann TELEPHONE 314/676 8243 HONTH:

Septer.ter 1988 l

6 AYERACE DAILY POWER LEVEL AVERACE DAILY POWER LEVEL l

DAY (HWe-Net)

DAY (HWo het) 1 1165 17 1144 i

?

629 18 1144 l

3 49 19 1148 4

4 410 20 l'.63 l

\\

5 890 21 1155 i

6 1158 22 1140 7

1157 23 1118 I

)

8 1155 24 467

{

i f

l 9

1157 25 767 l

\\

10 1154 26 1058 1

11 1147 27 1156 L

l 12 1141 28 1153

[

13 1150 29 1154

[

l!

l 14 1156 30 1156 I

15 1150 I

1 16 1143 t

I

(

Page 2 of 4

(

{

1

Per* D OPE MTING l>ATA REPORT DOCKET NO.

50 483 UNIT NAME CALLAWAY UNIT 1 DATE 10 07 88 COMPLETED BY R. J. McCann TELEPH0ht 314/676 824) t CPDATIt:C STATUS (YID

_CU_M )

1 REPORTINC PERIOD: SEPTEMBER 1988 CAOSS HCtlRS IN REPORTING PERIOD:

720 6576 33157.5 l

2 CURRENTLY AUINORIEED PC4TR LEVEL (Wt):

356),

HAX. DEFEND, CAPACITY (HWe* Net): 1120*

DESICN ELECnICAL RATINC (MWe Net):

1171 3.

POWER LEVEL TO MIICH RESTRICTED (IT ANY) (MWe Net):

4 REASOhS FOR RESTRICTION (IF AKY):

THIS HohTH YR TO DATE CtHULATIVE i

5.

NUNSER OT liOURS REACTOR WAS CRITICAL...............

699.2 6146.6 28125.3 l

6 REACTOR RESERVE SifUTDCAN HOURS.....................

0 0

0 7.

HOUR S CEN ERATOR ON LINE............................

695 6090.0 27544.5 8

UNIT RESERVE SHUTDOWN !!OURS........................

0 0

0 9

CROSS TITRMAL ENERCT CDERATED (WH)...............

2,295,718 20,819,809 89,091,589 10 CROSS ELECTRICAL DERCT CENDATED (SH)............

775,759 7,065,722 30,107,442

11. NET ELECTRICAL ENERCY CENERATED (SH)..............

737,598 6,724,079 28,533,122

12. REACTOR SERVICE FACTOR.............................

97.1 93.5 84.8 13 REACIOR AVAILABILITY FACEOR........................

97.1 93.5 84.8 14 UNIT SERVICi FACIUR................................

96.5 92.6 83.1 15 UNIT AVAIULBILITY FACTOR...........................

96,5 92.6 83.1

16. UNIT CAPACITY FACTOR (Using HDC)...................

91.5*

91.3*

76.8*

17 UN IT CAPACITY FACIOR ( Us ing De s i gn MWe )............

87,5 87.3 73.5

18. UNIT TORCED OUTACE RATE............................

3.47 4.18 4.32 19 SHLTDC%%S SCllEDULED CVER NEXT 6 H0tGVS (TTPE, DATE AND DURATION OF EACH):

20. IF SFUT DOWN AT EhD CF REPORTINC PERIOD, ESTIMTED DATE OF STARItT:
  • Re unit capacity factor (using HDC) reflects use of the HDC value prior to uprating to 3565 Wt.

A uprated MC value will not be determined untti Iste in 1968.

Fase 3 of 4

~~

Part E e*

L3IT SHUIDOWNS AND PC'AR REICCTIONS DOCKET bO.

50-483 13IT RAME CALIEAT L' NIT 1 EATE 10-07-88 COMPLETED BY R. J. McCann TELEPIN.f:E 314/676-8234 REPORT NONTH: SEPTDSER 1988

?CTDOD OF TYPE S3ETTINC DOL'N F: FORCED DUPJLTION T11E REACTUR OR DATE 5: SCHEDL* LED (lKWRS)

REASOM REICClNC PobTR CORRECTITE ACTIONS / COMMENTS 18 9-02-88 F

25 C

3 Km Trip on S/G Io to level due to trip of 2 Condensate Ptsps by inad-vertent opening of potential transforswr PB03. LER 88-010 19 9-23-88 5

0 D

t.

Reduced power telow m to replace RCS Flow Tracantter StHMARY:

IIASON IdETHOD A EQUIPF12."I TAILL'RE (EIPLAIN) 3: MA.WAL B: MAINT. OR TEST 2: E W AL SCRAM C: REFTELIhc 3: AUTWATIC SCRAM D: RECULATORT RESTRICTION 4: CHIIR (EIPLAIN)

E CFERAIDR TRAINING AND LICENSE EIAMINATION F ADMINISTRATIVE C: OPEPATIONAL ERROR (EIPIAIN) i N: DIHER (EIPLAIB)

Page 4 of 4

a UNlON ELECTRIC COMPANY canoen nant October 7. 1988 g

Nuclear Regulatory Com:nission Document Control Desk Washington, DC 20555 ULNRC-1843 Dear Sir DOCKET NUMBER 50-483 CALLAWAY PLANT UdIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPEPATING REPORT SEPTEhBER 1988 The enclosed Monthly Operating Report for September 1988 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

3/ w J. D. Blosser Manager. Callaway Plant nkNA 1V'h MET /DSH/ TAM /P.JM/cre l

Enclosure cca Distribution attached l

l fELY NWeg Ad2est PO Box 620 Fum NO 65254

  1. l l

~

~ i?

{!

cc distribution for ULNRC-1843 with enclosures Mr. Robert DeFayette. Chief Project Section IA U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn. IL 60137 l'r. Thomas Alexion (2 copies)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Aver.ca Bethesda. MD 2:'014 NRC Pesident Ynspector Manager. Electric relartment Missouri Public Service Commission P. O. Box 360 Jefferson City MO 65102 t

1

- -