VEfNONT YAlWEE NUCLEAR NWER STATION MONTH _Y STATISTICAL REPORT 86-12 FOR THE MONTH OF DECEMBER,1986 i
WDPF 0411 Original ADO $Ko jf
~
OPERATING OATA REPORT DOCKET 70.
50-271 DATE 870110 COWLETED BY G.A. Wallin TELEPHONE (802) 257-7711 OPERATING STATUS Notes:
1.
Unit Names Vermont Yankee
- 2.. Reporting Period:
December 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540
'5.
Design Electrical Rating (Net MWe):514(oc) 504(cc) 6.
Maximum Dependable Capacity (Gross MWe):
535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
NA 9.
Power level to which restricted, if any (Net MWe): N/A -
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Date Ctnulative
- 11. Hours in Reporting Period 744.00 8760.00
- 12. Number of Hours Reactor was Critical 744.00 4359.67 97470.73
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line '
744.00 4260.34 94978.69
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1171624.00 6566009.50 138675640.50
- 17. Gross Electrical Energy Generated (MWH) 397756.00 2172932.00 46128834.00
- 18. Net Electrical Energy Generated (MWH) 381731.00 1058426.00 43758676.00
- 19. Unit Service Factor 100.00 48.63 75.89
- 20. Unit Availability Factor 100.00 48.63-75.89
- 21. Unit Capacity Factor (using MOC Net) 101.80 46.62 69.37
- 22. Unit Capacity Factor (using DER Net) 99.82 45.72 68.02 i
- 23. Unit Forced Outage Rate 0.00 1.42 6.69
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
N/A
- 25. If shut down at end of report period, estimated date of startup:
N/A
- 26. Units in Test Status (prior to commercial' operation): N/A Forecast Achieved INITIAL CRITICALITY VYDPF 0411.01 INITIAL ELECTRICITY Original COWERCIAL OPERATION
AVERAGE DRILY LNIT POWER LEVEL DOCKET NO.
50-271 UNIT Vermont Yankee 04TE-870110-C0lfLETED BY G.A. Wallin TELEPK)NE (802) 257-7711 MONTH-December DAY AVERAGE M ILY POWER LEVEL DAY AVERAGE MILY POWER LEVEL
-(MWe-Net)
(MWe-Net) 1 519 17' 519 2
521 18 519 3
519 19 519 4
519 20 396 5
519-21 480 6
520 22 518 7
510 23 518
-8 520 24 519 9
519 25 519 10 519 26 519 11 519 27 519 12 519 28 515 13 519 29 518 14 513 30 518 15 518 31 519 16 519 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
VYDPF 0411.02 Original
TOCKET NO.
50-271 UNIT NAME vermont Yankee UNIT SHUTDOWNS AND F0WER REDUCTIONS D4TE 870110 COMPLETED BY G. A. Wallin REPORT K) NTH December TELEPH3NE (802) 257-7711 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report #
86-11 861207 S
0.00 B
4 N/A RB ZZZZZZ Power reduction for Turbine Power Bypass Valve testing.
Reduction 86-12 861220 S
0.00 B,H*
4 N/A RB CONROD Power reduction for a control roc Power pattern exchange and surveillance l Reduction testing.
I 2
3 4
F-Forced A-Equipment Failure (Explain)
Methods Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
WDPF 0411.03 G-Operational Error (Explain)
Exhibit I - Same Source Original
- H-Other (Explain)- Control Rod Pattern Exchange
DOCKET NO.
50-271 UNIT Vermont Yankee
[R TE 870110 COWLETED BY G.A. Wallin TELEPK)NE -
(802) 257-7711 REPORT K) NTH December SlMMRY OF OPERATING EXPERIENCES Highliohts Vermont Yankee operated at 98.9% of rated thermal power for the month.
Gross electrical generation was 397,756 MWH or 99.0% of design e
electrical capacity.
- Operating Sumary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 99.9% of rated thermal power.
861207 At 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, reduced power to 80% to perform Turbine surveillance.
(See Unit Shutdowns and Power Reductions) 861207 At 0150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br />, completed Turbine surveillance and a return to full power was started.
861220 At 0935 hours0.0108 days <br />0.26 hours <br />0.00155 weeks <br />3.557675e-4 months <br />, reduced power to 57% to perform Control Rod exer-cising and Turbine surveillance.
861220 At 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />, completed surveillances and initiated a Rod Pattern Exchange.
(See Unit Shutdowns and Power Reductions) 861220 At 1155 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.394775e-4 months <br />, completed the Rod Pattern Exchange.
861220 At 1201 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.569805e-4 months <br />, tripped off the "B" recirc pump.
861220 At 1437 hours0.0166 days <br />0.399 hours <br />0.00238 weeks <br />5.467785e-4 months <br />, started the "B" recirc pump and began a return to full power.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYOPF 0411.04 Original
,.. s e
VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR IIUNT ROAD VERNON, VERMONT 05354 VYV 87-1 January 10, 1987 U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C.
20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of December,1986.
Very truly yours, VERMONT YAM (EE NUO. EAR POWER CORP.
A[
Warren P.(Murph Vice President d
Manager of Operations WPM / TAW / mmh:MSR1.1/f4SR VYDPF 0411 Original I
t ft24 d,I I