ML20207M877

From kanterella
Jump to navigation Jump to search
Responds to Informing of Changes to Safeguards Plan.Some Changes Inconsistent W/Provisions of 10CFR50.54(p).Corrected Plan Pages Should Be Resubmitted to Maintain Plan Continuity.Encl Withheld (Ref 10CFR73.21)
ML20207M877
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/31/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8701130319
Download: ML20207M877 (2)


Text

.

  • DEC 311986 In Reply Refer to:

Docket: 50-298 Nebraska Public Power District ATTN: J. M. Pflant, Manager, Technical Staff - Nuclear Power Group P. O. Box 499 Columbus, Nebraska 68601

Dear Sir:

This is in response to your letter of October 13, 1986, regarding changes to the Cooper Nuclear Station Safeguards Plan. We have reviewed the information contained in the security plan revision and have determined that portions of that plan are consistent with the provisions of 10 CFR 50.54(p) and'are therefore acceptable. However, as indicated in the enclosure, certain other portions decrease plan effectiveness and are therefore inconsistent with the provisions of 50.54(p). Accordingly, you are to follow your previously approved plan in regard to these items. Resubmit corrected plan pages as necessary to maintain plan continuity.

Should you want to pursue changing the security plan with respect to the changes set forth in the enclosure, you should resubmit under the provisions of 10 CFR 50.90.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefs e, the enclosed Safeguards Attachment will not be placed in the Public Document Room.

If you have any questions concerning this matter, please contact A. B. Earnest at (817)860-8146.

Sincerely, N Signed by-R. E. Hall" /N J. E. Gagliard6', Chief Reactor Projects Branch

Enclosure:

Safeguards Attachment cc: (see next page)

~.

8701130319 861231 PDR ADOCK 05000298 p PDR RIV:EP C:EP&S9S C:R&S I C: /A IR ABEarn LAYand G WLFishedtp JPJaudon JEGagliardo

/3/)S/86 g/g86 k).4&/86 )1 y/4/86 9 g t/ y/86 Casework Number 50-298/11-XA ENCLOSURE CONTAINS Og SAFEGUARDS INFORMATION.

UPON SEPARATION THIS I I PAGE IS DECONTROLLED.

. =

Nebraska Public Power District cc w/o Safeguards:

Guy Horn, Division Manager of Nuclear Operations Cooper Nuclear Station P. O. Box 98 Brownville, Nebraska 68321 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bec w/ copy of licensee's letter and Safeguards

Attachment:

RIV Security File G. McCorkle, NMSS J. Gibson, SSPD/NRR IE File Resident Inspector R. D. Martin, RA Security Inspector Chief, EP&SPS R. L. Bangart, DRS&S bec w/ copy of licensee's letter w/o Safeguards

Attachment:

4MB RG01 RPB Section Chief (RPB/A)

Project Inspector (RPB/A)

RIV File MIS RITS Operator W. L. Fisher, R&SPB R&SPB E. H. Johnson, DRS&P 50.54(p) Book ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.

UPON SEPARATION THIS PAGE IS DECONTROLLED.

COOPER NUCLEAR ST ATION Nebraska Public Power District

" ' " * "A"<"OO?s L"".^i?^ ""'

CNSS860772 October 13, 1986 ATD.C!"C CENTAINS _

Hr. Robert D. Martin ,N4=

Regional Administrator SAFE UARDS U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 1000

)@@$bk Arlington, Texas 76011

Subject:

Cooper Nuclear Station Safeguards Plan; p Report of Change-Revision Number Sixteen -

Dear Mr. Martin:

Changes to the Physical Security Plan and Contingency Plan (Volumes I of the Safeguards Plan) are being submitted to reflect recent changes at Cooper Nuclear Station. These changes include the addition of a vital area door, a camera relocation, clarification of authority to suspend plan requirements and several minor changes. These changes are annotated by sidebars.

Accordingly, Nebraska Public Power District is submitting, in accordance with tha provisions of 10CFR Part 50.54(p), a Report of Change to the Cooper Nuclear Station Safeguards Plan, Revision Fifteen. Upon incorporation of this change,' the current Safeguards Plan becomes Revision Sixteen. We believe the enclosed change does not decrease the safeguards effectiveness of the plan.

The material enclosed herewith contains Safeguards Information as defined by 10CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited. Therefore, we request the material, with the exception of the cover letter, to be withheld from public disclosure.

1

/

L. G. Kunci Vice President - Nuclear LGK:liTil:bs SG.LO'2 7 WM When separated from Enclosures. y b

Randle this Document as Deamtro!Ied.

.n ,, ....--_. _

m%

e October 13, 1986 Mr. Robert D. Martin Page 2

Enclosures:

(6 copies of Plan and Volume I title pages, pages 1. 7, 8, 10, 12, 19, 20, 22; Attachment B, page 1 and 2 of 3; Drawings 3.1 and 3.2.)

cc: Director Office of Nuclear Reactor Regulation Attention: Document Control Desk U.S. Nuclear Regt'latory Commission

/ Washington, D.C. 20555 w/o enc 1.

f 7 0 ! E. JJN' INS SA51JARDS lERMA"l0N V,tei separated from M"-

K ,1fi t!.h Dat -

I

. - _ - - - - - ,___r - , . _ , _ - . _ - _ _ _ _ _ - - . . - - - . , _ _ _ . - . _ _ _ . -