p n neo,

\\

UNITED STATES p

g j

NUCLEAR REGULATORY COMMISSION 7

WASHINGTON, D.C. 20066-0001

%g February 26, 1999 MEMORANDUM TO:

William D. Travers Executive Director for Operations FROM:

Joseph A. Murphy, Chairman Committee To Review Generic quir nts

SUBJECT:

MINUTES OF THE CRGR MEETING NUMBER 322 The Committee To Review Generic Requirements (CRGR) met on Friday, June 12,1998, from 9:00 am to 12:30 pm. Attachment 1 contains a list of attendees.

G. Lainas, J. Strosnider, T. Reed and E. Murphy, all of NRR, briefed the Committee on the

- steam generator tube integrity package consisting of a proposed generic letter and a draft regulatory guide (DG-1074). The staff's presentation material is included in Attachment 2. The CRGR made extensive comments on the scope and contents of the generic letter, which were addressed by the staff prior to formal CRGR review for endorsement on July 21,1999, at CRGR meeting No. 325. The minutes of that meeting, which were issued on February 26,1999, contain details.

Also at this meeting, J. Roe (NRR) presented for CRGR review and endorsement the final rule on financial assurance for decommissioning nuclear power plants. The staff's presentation material is included as Attachment 3. The CRGR had deferred the review of this rulemaking at the proposed rule stage. At this mceting, the Committee made minor comments and endorsed it for issuance.

In accordance with the EDO's July 18,1983 directive conceming " Feedback and Closure of CRGR Review," a written response is required m.... the cognizant office to report agreement or disagreement with the CRGR recommendations in these minutes. The response is to be forwarded to the CRGR Chairman and if there is disagreement with the CRGR recommendations, to the EDO for decision making.

Questions concerning these meeting minutes should be referred to Raji Tripathi (415-7584).

Attachments: As stated cc:

Commission (5)

SECY F. Miraglia, DEDR M. Knapp, DEDE M. Springer, ADM J. Larkins, ACRS

,\\y K. Cyr, OGC H. Bell, OlG S. Collins, NRR A. Thadani, NMSS g

C. Paperiello, NMSS J. Lieberman, OE H. Miller, RI L. Reyes, Rll J. Dyer, Rlli E. Merschoff, RIV J. Strosnider, NRR D. Matthe j c RM FIlli CENTER J ' - g,pf '/

K d f rF 6 H(d 6A 2

mann rn r M NTFR P,M 9903190021 990226 4*'

PDR REVOP NROCRC MEETINO322 PDR

MEMORANDUM TO:

Willi:m D. Trnv:rs February 26, 1999 Ex:cutiva Dir:ctor for Operations e

FROM:

Joseph A. Murphy, Chairman (Original /s/ by J. Murphy) l Committee to Review Generic Requirements

SUBJECT:

MINUTES OF THE CRGR MEETING NUMBER 322 The Committee To Review Generic Requirements (CRGR) met on Friday, June 12,1998, from 9:00 am to 12:30 pm.' Attachment 1 contains a list of attendees.

l l

G. Lainas, J. Strosnider, T. Reed and E. Murphy, all of NRR, briefed the Committee on the

. steam generator tube integrity package consisting of a proposed generic letter and a draft i

regulatory guide (DG-1074). The staff's presentation materialis included in Attachment 2. The CRGR made extensive comments on the scope and contents of the generic letter, which were addressed by the staff prior to formal CRGR review for endorsement on July 21,1999, at CRGR 3

meeting No. 325. The minutes of that meeting, which were issued on February 26,1999, l

contain details.

Also at this meeting, J. Roe (NRR) presented for CRGR review and endorsement the final rule on financial assurance for decommissioning nuclear power plants. The staff's presentation materialis included as Attachment 3. The CRGR had deferred the review of this rulemaking at l

the proposed rule stage. At this meeting, the Committee made minor comments and endorsed it for issuance.-

l in accordance with the EDO's July 18,198'i directive conceming " Feedback and Closure of CRGR Review," a written response is requ. red from the cognizant office to report agreement or disagreement with the CRGR recommendations in these minutes. The response is to be forwarded to the CRGR Chairman and if there is disagreement with the CRGR l

recommendations, to the EDO for decision making.

Questions conceming these meeting minutes should be referred to Raji Tripathi (415-7584).

h

. Attachments: As stated j

i cc:

Commission (5)

SECY l

F. Miraglia, DEDR M. Knapp, DEDE j

. M. Springer, ADM J. Larkins, ACRS i

K. Cyr, OGC H. Bell, OlG.

i S. Collins, NRR A. Thadani, NMSS

^

C. Paperiello, NMSS J. Lieberman, OE H. Miller, RI J. Dyer, Rlli ~

L. Reyes, Ril l

E. Merschoff, RIV J. Strosnider, NRR.

D. Matthews, NRR Distnbution:

File Center (w/atts.) PDR (NRC/CRGR)(w/o atts.)

CRGR SF CRGR CF l

4 STreby JMitchell RTripathi JJohnson, OCM BSheron DDambly JJohnson, Ril MVirgilio MFederline GWest i

GHolahan ESullivan' Treed EMurphy SLong l

RAuluck '

' RWood BRichter ASingh i

DISK /DOCUMENTNAME: S:\\CRGR\\ MINUTES.322 l

' To recove a copy of this document indicate in the bor "C" = copy w/o attachment, "E" = Copy w/ attachment, "Naa No copy OFC' CRGR

[

C:CR I

NAME RTripathi JAMu

[

DATE 24h 2

f OFFICIAL RECORD COPY j

w

,,.y

.m

Attendance List

CRGR Meeting No.-322 June 12,1998 CRGR MEMBERS NRC STAFF T. Martin G. Lainas, NP.R B. Sheron for F. Miraglia D. Matthews, NRR J. Murphy G. Holahan, NRR D. Dambly J. Strosnider, NRR F. Combs for M. Knapp E. Sullivan, NRR J. Dyer, RIV (Video teleconferencing T. Reed, NRR S. Long, NRR R. Auluck, NRR B. Richter, NRR R. Wood, NRR CRGR STAFF OEDO Staff R. Tripathi J. Mitchell ACRS STAFF A. Singh

,1

=

Minutes of CR'GR Meeting No. 322, June 12,1998 i

i i

i i

I l

1 1

1 l

l l

[

PRESENTATION MATERIAL USED BY THE STAFF i

i v

4

. 'h 4

i

,-,-.,,,-,,....n-,.-

~-

a,,,,,,

,~..-

n,-.

--n,

.n-,

V c3E$ REG

'~]

j I

., + + + + #.

i CRGR BRIEFING i

i i

\\

STEAM GENERATOR TUBE INTEGRITY REVISION TO REGULATORY FRAMEWORK r

I t

6 m!

D a M "

JUNE 12,1998

  • K

.... c.mmo.1-mosumsscoe.

,0...

J n~

a!

8 N!

N!

t

A AGENDA e

INTRODUCTION l

l e

OVERVIEW OF PROPOSED GL 98-XX i

e INDUSTRY ACTIONS e

DIFFERING PROFESSIONAL OPINION l

h i

i i

i i

i 1

)

1 i

BACKGROUND i

e BRIEFED CRGR SEPTElW3ER 1997 ON PROPOSED SG GL STATUS l

DISCUSSED THE REVISED REGULATORY APPROACH (FROM RULE TO GL):

e REGULATORY EFFORT BEGAN IN EARLY 1994 AS A RULEMAKING DEVELOPED DRAFT RULE, DRAFT REGULATORY GUIDE, PERFORMED RISK ASSESSMENT PERFORMED REGULATORY ANALYSIS (COMPLETED IN MARCHIAPRIL 1997) j i

e REGULATORY ANALYSIS CONCLUSIONS:

CURRENT TS DO NOT ENSURE SG TUBE INTEGRITY PER GOVERNING REGULATION AND LICENSING BASIS f

COMPLIANCE ISSUE: AMENABLE TO A GL' APPROACH I

COULD NOT GENERICALLY BACKFIT NEW RISK REQUIREMENTS (FAILED THE V/l TEST)

NEW REPAIR CRITERIA PROPOSALS OR INCREASES IN ACCIDENT LEAKAGE NEED TO BE SUPPORTED WITH RISK I

1 2

i i

i

i BACKGROUND CONT' s

COMSECY-97-013 PROVIDED ABOVE CONCLUSIONS TO THE COMMISSION 1

COMMISSION AGREED TO REVISED APPROACH IN SRM DATED JUNE 30,1997 e

i

\\

l l-i e

9 4

I i

3 a

o

l PROPOSED GL 98-XX i

SG TUBE INTEGRITY LICENSING BASIS i

e 10 CFR 50 APPENDICES A (GDC-14,30,31 OR EQUIVALENT) AND B (CRITERIA IX, XVI)-MOST IMPORTANT ARE:

APP A GDC 14: RCPB "SHALL BE DESIGNED, FABRICATED, ERECTED, AND TESTED SO AS TO HAVE AN EXTREMELY LOW PROBABILITY OF ABNORMAL LEAKAGE, RAPIDLY i

PROPAGATING FAILURE, AND OF GROSS RUPTURE" APP B CRITERlON IX: " CONTROL OF SPECIAL PROCESSES"- MEASURES SHALL BE ESTABLISHED TO ASSURE THAT SPECIAL PROCESSES INCLUDING... NONDESTRUCTIVE l

TESTING ARE CONTROLLED AND ACCOMPLISHED BY QUALIFIED PERSONAL WITH j

QUALIFIED PROCEDURES...

APP B CRITERlON XVI: " CORRECTIVE ACTION"- MEASURES SHALL BE ESTABLISHED TO ASSURE THAT CONDITIONS ADVERSE TO QUALITY... ARE PROMPTLY IDENTIFIED AND CORRECTED i

l 10 CFR50.55a (CODES AND STANDARDS)-ASME SECTION 111 AND 5iECTION XI:

e RCPB COMPONENTS DESIGNED TO ASME SECTION lli i

i ASME SECTION XI DEFAULTS TO TECHNICAL SPECIFICATIONS IF DIFFERENT FROM IWB-j 1

2000 - SG INSPECTION IS GOVERNED BY TSs t

i 4

5

l I

i

{

PROPOSED GL 98-XX l

LICENSING BASIS CONT' l

QUALIFICATION OF ECT EQUIPMENT, PROCEDURES, AND PERSONNEL - ASME CODE i

SECTION XI FSAR: SPECIFICALLY CHAPTER 15 EVENTS ANALYZED PER PART 100 AND GDC 19 (RCP e

l LOCKED ROTOR, RCCA EJECTION, MSLB, SGTR) i 4

l e

TECHNICAL SPECIFICATIONS (SG LCO/SR, SG LEAKAGE LIMITS):

l SG TSs: 3% INITIAL SAMPLE / EXPANSION PER "C" CATEGORIES,40% TW REPAIR

)

CRITERIA, OPERABLE WHEN REPAIRED, NDE QUALIFICATION NOT ADDRESSED,'

i INSPECTION FREQUENCY FUNCTION OF "C" CATEGORY SG LEAKAGE TSs: TYPICALLY 1 GPM TOTAL LEAKAGE OR 500 GPDISG (SOME CASES REDUCED TO 150 GPDISG) i I

l i

t 5

l

(

l PROPOSED GL 98-XX REGULATORY ISSUE l

e COMPLIANCE WITH CURRENT TSs ALONE DOES NOT ENSURE SG TUBE INTEGRITY IS l

MAINTAINED AS REQUIRED BY GOVERNING REGULATIONS AND LICENSING BASIS:

TS REQ'TS FOR INSPECTION AND REPAIR ARE PRESCRIPTIVE AND OUT-OF-DATE i

l TS DOES NOT FOCUS ON ENSURING SG TUBE INTEGRITY FOR OPERATING CYCLE l

MEETING TS REQ'TS DOES NOT, BY ITSELF, ENSURE TUBE INTEGRITY i

3 e

CURRENT TSs SHORTCOMINGS HAVE BEEN AGGRAVATED BY EMERGENCE OF SCC AS DOMINANT DEGRADATION MECHANISM:

l RELIABLE SCC DETECTION AND SIZING DEPEND ON THE AFPLICATION OF NDE l

TECHNIQUES WHICH ARE OUTSIDE THE SCOPE OF TS AND ASME SECTION XI REQUIREMENTS NDE SIZING ERROR AND DEGRADATION GROWTH RATES CAN BE SUBSTANTIALLY HIGHER THAN THAT ALLOWED FOR IN THE TS REPAIR CRITERIA AND INSPECTION INTERVAL i

6 i

PROPOSED GL 98-XX REGULATORY ISSUE CONT' TS FREQUENCY AND TUBE SAMPLING REQ'TS ARE NOT DESIGNED TO ENSURE TUBES ARE INSPECTED BEFORE INTEGRITY IS IMPAIRED i

GIVEN TS SHORTCOMINGS LICENSEES WITH SIGNIFICANT DEGRADATION FREQUENTLY FIND e

IT NECESSARY TO IMPLEMENT ACTIONS BEYOND TS AND CODE REQ'TS TO ENSURE TUBE INTEGRITY (AD HOC PROCESS) o INTERIM ACTION:

i j

NRC STAFF INTERACTS WITH LICENSEES ON "AD HOC" BASIS TO ENSURE THAT TUBE l

INTEGRITY IS MAINTAINED GiVEN THE CURRENT TS SHORTCOMINGS l

ISSUANCE OF NUMEROUS GLs AND ins (e.g., GL 95-03, GL 97-05, GL 97-06)

AS A RESULT, CURRENTLY THERE IS NOT A SAFETY PROBLEM STEMMING FROM THE TS l

lNADEQUAClES e

GIVEN THAT THE " PROBLEM" IS A " BROKEN" TS-NRC STAFF CONCLUDED BEST FIX WAS TO AMEND TSs AS NEEDED TO ENSURE TUBE INTEGRITY IS MAINTAINED - ACCORDINGLY DEVELOPED PROPOSED GL 98-XX 7

i

i j

(

PROPOSED GL 98-XX l

PURPOSE i

o PURPOSE OF PROPOSED GENERIC LETTER:

1 i

INFORMS PWR LICENSEES OF PROBLEMS WITH CURRENT TSs AND THAT ACTIONS l

BEYOND CURRENT TSs ARE NECESSARY TO ENSURE TUBE INTEGRITY PER GOVERNING

{

REGULATIONS 1

REQUESTS LICENSEES AMEND TSs PER GL TS GUIDANCE OR IMPLEMENT EQUIVALENT I

LICENSEE SPECIFIED ACTIONS SUCH AS TO ENSURE TUBE INTEGRITY REQUIRES RESPONSE PER 10 CFR 50.54(f) D!SCUSSING PLANNED ACTIONS AND l

SUPPORTING SCHEDULE i

o SG TUBE INTEGRITY DEFINED:

SG TUBES MUST BE CAPABLE OF PERFORMING THEIR SAFETY FUNCTIONS CONSISTENT l

WITH LICENSING BASIS 4

i l

8

b i

l PROPOSED GL 98-XX REQUESTED ACTIONS / SUPPORTING INFORMATtON l

i e

REQUESTED ACTIONS AND SUPPORTING INFORMATION:

REQUESTS ADDRESSEES TO REVISE TSs PER MODEL GL TSs i

OR, PROPOSE ALTERNATIVE WITH SUPPORTING BASIS i

ALSO MAY PROPOSE FLEX TS PER EXAMPLE TSs, ALTERNATIVE REPAIR CRITERIA, OR USE OF PROBABIL!STIC STRUCTURAL CRITERIA - NEED TO SUPPORT WITH RISK

{

ASSESSMENT PER RG 1.174 e

REQUIRED RESPONSE PER 50.54(f):

i i

LICENSEES TO PROVIDE A DESCRIPTION OF PROPOSED COURSE OF ACTION AND i

SUPPORTING SAFETY BASIS FOR MONITORING AND MAINTAINING SG TUBE INTEGRITY LICENSEES TO PROVIDE A SCHEDULE FOR IEt?LEMENTATION i

o RESPONSE TIME:

i i

l AT LEAST 6 MONTHS PRIOR TO NEXT REFUELING OUTAGE THAT OCCURS ONE YEAR l

FOLLOWING DATE OF GL 9

~

i

~

i j

PROPOSED GL 98-XX i

MODEL TSs i,

e ATTACHES MODEL TSs DESIGNED TO REPLACE CURRENT SG TS:

MODEL TSs (TO BE DISCUSSED IN DETAILED CRGR MTG) INCORPORATE KEY i

PROGRAMMATIC FEATURES SUCH AS CONDITION, OPERATIONAL ASSESSMENT, NDE l

QUALIFICATION, PERFORMANCE CRITERIA) l' e

ATTACHES EXAMPLE TS FOR LICENSEES WHO WISH TO IMPL EMENT " FLEX" DOSE ASSESSMENT APPROACH

" FLEX" TS INTENDED TO PROVIDED FLEXIBILITY TO LICENSEES TO ADJUST RCS SPECIFIC ACTIVITY TO ENABLE INCREASES IN CALCULATED ACCIDENT INDUCED LEAKAGE-WITHOUT THE NEED FOR A TS AMENDMENT FOR CACH CHANGE i

i i

i I

l 10 M

PROPOSED GL 98-XX NEW PROPOSALS e

LICENSEES MAY PROPOSE:

NEW REPAIR CRITERIA I

I l

PROBABILISTIC CRITERIA.

l l

INCREASES IN ACCIDENT INDUCED LEAKAGE IMPLEMENTATION OF " FLEX" TS l

i i

e POTENTIAL RISK IMPLICATIONS (SEE NUREG-1570):

s RISK MAY INCREASE DEPENDENT OM "HE AMOUNT, SEVERITY, AND LOCATION OF DEGRADATION LEFT IN SERVICE SHOULD BE SUPPORTED BY A RISK ASSESSMENT WITH CONSIDERATION OF DEFENSE-IN-DEPTH FOLLOWING RG 1.174 GUIDELINES RISK ASSESSMENT NEEDS TO CONSIDER EACH DEGRADATION FOR WHICH PROPOSED APPROACH IS BEING APPLIED 1

l 11 i

1

,,.,,,c

..w,-

w -- wm -y e.- v g -

  • e we

~_m, w

PROPOSED GL 98-XX 10 CFR 50.54(f) JUSTIFICATION INFORMATION REQUESTED IS NEEDED TO VERIFY LICENSEE COMPLIANCE WITH THE e

CURRENT LICENSING BASIS FOR THE FACILITY l

l PWR LICENSEES ARE DOING MORE THAN MINIMUM TS SRs (IN RESPONSE TO AD HOC e

ACTIONS):

PROPOSED GL FORMALLY ESTABLISHES STAFF POSITION j

REQUIRES LICENSEES TO FORMALLY DOCUMENT THEIR ACTIONS l

REQUESTED INFORMATION WILL ENABLE STAFF TO DETERMINE WHETHER ADDITIONAL l

ACTIONS ARE NECESSARY PURSUANT TO 50.54(f)

SATISFIES 50.54(f) CRITERIA-NO MEED FOR ADDITIONAL JUSTlFICATION e

i i

i i

1 i

12 l

i i

j PROPOSED GL 98-XX j

10 CFR 50.109 BACKFIT JUSTIFICATION BASIS FOR INVOKING 50.109(a)(4)(i) " COMPLIANCE EXCEPTION":

e FOLLOWING ONLY THE CURRENT MINIMUM TS REQUIREMENTS CAN AND HAS RESULTED l

IN PWRs NOT MAINTAINING SG TUBE INTEGRITY TO ENSURE TUBE INTEGRITY IS MAINTAINED PER GDC 14 (OR ITS EQUIVALENT) NEED TO DO MORE THAN MINIMUM TS REQUIREMENTS j

PWR LICENSEES CURRENTLY DO MORE THAN THE MINIMUM TS REQUIREMENTS IN RESPONSE TO STAFF AD HOC REGULATION PWR LICENSEES MAY NEED TO TAKE ADDITIONAL ACTIONS AS A RESULT OF GL 98-XX i

l (WILL DEFINITELY NEED TO TAKE ACTIONS BEYOND CURREJT TSs)

IF, DUE TO GL 98-XX, PWR LICENSEES MUST TAKE ADDITIONAL ACTIONS BEYOND CNRRENT i

e TS REQUIREMENTS THIS IS REQUIRED TO COMPLY WITH GOVERNING REGULATIONS -

l PRINCIPALLY 10 CFR 50 APPENDIX A GDC 14 (OR THE EQUIVALENT) AND 10 CFR 50 APPENDIX j

B CRITERlON XVI l

I SATISriES COMPLIANCE EXCEPTION CRITERIA OF PER 50.109(a)(4)(i) e i

i 13 L

l l

l l

REGULATORY ATTRIBUTES l

FOR MODEL TSS AND DG-1074 i

l e

PERFORMANCE-BASED: FOCUS ON MAINTAINING STRUCTURAL AND LEAKAGE INTEGRITY FOR OPERATING CYCLE CONSISTENT WITH APPLICABLE REGULATIONS AND LICENSING l

BASIS l

j e

RISK-lNFORMED: ENSURE THAT THE REGULATORY STRUCTURE MAINTAINS RISK AT AN l

ACCEPTABLE LEVEL i

l e

4DAPTABILITY: ENABLE NEW' APPROACHES / TECHNOLOGY TO BE IMPLEMENTED WITHOUT l

NEED FOR TS AMENDMENT / STAFF REVIEW (CONSISTENT WITH PERFORMANCE-BASED STRUCTURE) i e

FLEXfBILITY: ENABLE DEGRADATION SPECIFIC MGMT-HOWEVER REQUIRES E3DSM STRATEGIES TO BE DEVELOPED i

e NDElNCENTIVES: PROVIDE INCENTIVES TO PWR LICENSEES TO DEVELOP AND IMPLEMENT i

NEW NDE TECHNOLOGY e

INTEGRATED TECHNICAL APPROACH: ENSURE THAT KEY TECHNICAL ISSUES ARE l

ADDRESSED (e.g., MATERIALS, SYSTEMS, RISK, RAD PROTECTION ISSUES)

I 4

14 i

i

PROGRAM STRATEGY /

STEAM GENERATOR TUBE INTEGRITY G,l*f. ). :

NDE I

Qualification /

Validation 1 r Condities Monitoring 1 r Per-infarm NRC no /,,formance mana m epm.

Criteria Satisfied I

1 r yes3 r Corrective Operational Actions a

= met a

3 7 Per-no formance Criteria Satisfied 7

yes Plug /

Submit Ostage Repalt Report 3 r a

Preventive Messurse 1 r PlantD Monitor

~

Restartj laakage j

u-w

-e--e se


*--,--m-,--wwwe

+ e e w.

+ce**e*e-r,-

w----m----ar-

--1---wee-e---++--e**

te ws-e r--r -wt w-

-=--w-

-r*---

  • = = = -T-

INDUSTRY ACTIONS l

1 l

INDUSTRY HAS DEVELOPED, AND VOTED TO ADOPT AN INITIATIVE ADDRESSING SG TUBE e

l INTEGRITY: NEl 97-06" STEAM GENERATOR PROGRAM GUIDELINES":

1 PROVIDED TO STAFF FOR INFORMATION (NOT SUBMITTED FOR REVIEW)

I INDUSTRY VIEWS NEl 97-06 AS AN EFFECTIVE ALTERNATIVE TO THE PROPOSED GL-STAFF e

HAS SUGGESTED THAT INDUSTRY COMMENT ON PROPOSED GL ACCORDINGLY e

STAFF'S REGULATORY EFFORT HAS CAUSED INDUSTRY TO DEVELOP:

)

NEl 97-06 (PARALLELS DG-1074) i REVISION 5 TO ISI GUIDELINES I

OPERATIONAL LEAKAGE MONITORING GUIDELINES SG TUBE INTEGRITY ASSESSMENT GUIDELINES (NOT YET PROVIDED TO STAFF)

IN41TU PRESSURE TESTING GUIDELINES (NOT YET PROVIDED TO STAFF) l 4

e RESOLUTION OF PUBLIC COMMENTS ON PROPOSED GL 98-XX IS LIKELY TO RESULT IN A l

CONVERGENCE OF NRC AND INDUSTRY APPROACHES 16 f

=

w-

+

+

,.,,4m--w-w-

,=

w+,

5 m-,- -,,.,, -,,. -. -

.,,vr-,.%w

,g,

,,w e g --, w e, w,-ww e v,,

.,-%,,+,

w. -g e, w-p g,, m y m,,
l l

DIFFERING PROFESSIONAL OPINION l

CONCERNING SG TUBE INTEGRITY i

i DPO CONSIDERATION DOCUMENT IS AN INTEGRATED REPORT OF HOW THE DPO ISSUES i

WERE CONSIDERED DURING THE DEVELOPMENT OF THE PROPOSED GL (AND DRAFT RULE) l NOT DISCUSSING IN DETAll STAFF'S CONSIDERATION OF DPO FOR OVERVIEW-IF CRGR e

I WISHES CAN DISCUSS IN DETAll AT CRGR MEETING CURRENTLY SCH5DULED FOR JULY 4

r i

4 6

l i

i 17 l

1

... -,, -- -w e

-.-.-... _ _.... _ _.. _..__ -., _.. _ ~ _. _. _._ _ _ __..... _._ _. _....._ _.__. _..

t L

i :.

Minutes of CRGR Meeting No. 322, June 12,1998 I

t t

I t

i i

r I

h i

i, a

L, I

t.

t.

1 3

I

.i 4

i.

r s

t PRESENTATION MATERIAL USED BY THE STAFF.

)

i t

1 i

I i

f v

i

-j l

I i

i ge 1

4

(.

l 1

i

. _, u.

CRSit f~,As 49 q

ue 32u (6)l*/* F) i l

FINAL RULE --

FINANCIAL ASSURANCE REQUIREMENTS FOR DECOMMISSIONING NUCLEAR POWER REACTORS I

i BRIEFING OF THE CRGR JUNE 12,1998 l

i l

--h.m.%

s mA 44

&A---n.u

.h e R..A

=

6

+W

' ~

h.

-; =

w L.

u Aa l

BACKGROUND l

i THE NRC PUBLISHED AN ADVANCE NOTICE OF PROPOSED RULEMAKING ON FINANCIAL ASSURANCE REQUIREMENTS FOR DECOMMISSIONING IN THE FEDERAL REGISTER ON APRIL 8,1996.

l THE NRC RECEIVED APPROXIMATELY 650 COMMENTS FROM 42 j

RESPONDENTS.

BASED ON COMMENTS ON THE ANPR, THE NRC DEVELOPED A PROPOSED RULE THAT IT PUBLISHED IN THE FEDERAL REGISTER ON SEPTEMBER 10,1997.

i THE.NRC RECEIVED 33 COMMENT LETTERS AND OVER 200 COMMENTS COVERING OVER 50 ISSUES ON THE PROPOSED RULE.

THESE INCLUDED LETTERS FROM 25 LICENSEES OR LICENSEE ORGANIZATIONS,5 STATE AGENCIES OR.PUCs,2 PUBLIC INTEREST i

GROUPS, AND 1 UNAFFILIATED INDIVIDUAL.

THE NRC ALSO ISSUED DRAFT SRPs AND GUIDANCE TO ACCOMPANY THE PROPOSED RULE.

i

1 i

q

]

2

SUMMARY

OF CURRENT RULE THE CURRENT RULE DISTINGUISHES BETWEEN " ELECTRIC UTILdTY" LICENSEES AND OTHERS WITH RESPECT TO PROVIDING I

DECOMMISSIONING FUNDING ASSURANCE.

THE ASSUMPTION BEHIND THIS DISTINCTION IS THAT AN " ELECTRIC UTILITY" CAN RECOVER ITS COSTS OF DECOMMISSIONING FROM RATEPAYERS AS MANDATED BY ITS RATE REGULATOR (S).

j VIRTUALLY ALL POWER REACTOR LICENSEES MEET THE NRC DEFINITION OF " ELECTRIC UTILITY" AND USE THE EXTERNAL i

SINKING FUND METHOD OF FUNDING ASSURANCE.

i OTHER ASSURANCE METHODS ALLOWED IN 9 50.75(e) INCLUDE-

-- PREPAYMENT; j

-- SURETY BONDS, LETTERS OF CREDIT, AND PARENT AND SELF GUARANTEES; AND

-- OTHER GUARANTEE METHODS.

1

?

SUMMARY

OF FINAL RULE i

i t

I ELIMINATES RELIANCE ON DEFINITION OF " ELECTRIC UTILITY" IN 9 50.2 FOR DECOMMISSIONING FUNDING ASSURANCE.

INCORPORATES THAT DISTINCTION IN 9 50.75.

-i MAJOR ELEMENTS OF FINAL RULE.

-- BROADENS ALLOWABLE ASSURANCE MECHANISMS TO INCLUDE NON-BYPASSABLE WIRES CHARGES AND, UNDER CERTAIN l

CIRCUMSTANCES, LONG-TERM CONTRACTS; i

-- ALLOWS A CREDIT FOR EARNINGS ON EXTERNAL SINKING j

FUNDS OF 2% (OR GREATER, IF PUC/FERC APPROVED);

IMPOSES A REPORTING REQUIREMENT ON THE STATUS OF i

DECOMMISSIONING FUNDS TO SIMPLIFY PROCESS OF j

COLLECTING THIS INFORMATION.

OTHER ELEMENT: REDEFINITION OF " FEDERAL LICENSEE" l

-- ONLY TVA IS AFFEOTED; NO SIGNIFICANT IMPACT.

l I

I

l 4

f i

SUMMARY

AND CONCLUSIONS i

[

i f

FINAL RULE IS NECESSARY TO ADDRESS POWER REACTOR RATE l

DEREGULATION ISSUES AS THEY MAY AFFECT DECOMMISSIONING FUNDING ASSURANCE i

THE STAFF BELIEVES THAT THE FINAL RULE DOES NOT REPRESENT A BACKFIT AND REPRESENTS AN EASING OF BURDEN ON POWER REACTOR LICENSEES.

i i

- I

February 26, 1999 MEMORANDUM TO:

Wilrzm D. Tr:vtra

^

Ex:cutiva Dir:ctor for Oper;tions i

1

- FROM:

Joseph A. Murphy, Chairman (Original /s/ by J. Murphy)

Committee to Review Generic Requirements

SUBJECT:

MINUTES OF THE CRGR MEETING NUMBER 322 1

t The Committee To Review Generic. Requirements (CRGR) met on Friday, June 12,1998, from 9:00 am to 12:30 pm. Attachment 1 contains a list of attendees.

G. Lainas, J. Strosnider, T. Reed and E. Murphy, all of NRR, briefed the Committee on the steam generator tube integrity oackage consisting of a proposed generic letter and a draft l

l regulatory guide (DG-1074). Die staffs presentation material is included in Attachment 2. The CRGR made extensive comments on the scope and contents of the generic letter, which were addressed by the staff prior to formal CRGR review for endorsement on July 21,1999, at CRGR j

meeting No. 325. The minutes of that meeting, which were issued on February 26,1999, contain details.

i Also at this meeting, J. Roe (NRR) presented for CRGR review and endorsement the final rule on financial assurance for decommissioning nuclear power plants. The staff's presentation materialis included as Attachment 3. The CRGR had deferred the review of this rulemaking at.

l the proposed rule stage. At this meetireg, the Committee made minor comments and endorsed it-forissuance.

In accordance with the EDO's July 18,1983 directive conceming " Feedback and Closure of l

CRGR Review," a written response is required from the cognizant office to rcport agreement or disagreement with the CRGR recommendations in these minutes. The response is to be forwarded to the CRGR Chairman and if there is disagreement with the CRGR recommendations, to the EDO for decision making.

Questions concerning these meeting minutes should be referred to Raji Tripathi (415-7584).

j J

Attachments: As stated t

cc:

Commission (5)

SECY

' F. Miraglia, DEDR M. Knapp, DEDE l

[

M. Springer, ADM J. Larkins, ACRS PDR i

K. Cyr, OGC H. Bell, OlG I

S. Collins, NRR A. Thadani, NMSS

)

C. Paperiello, NMSS J. Liebeiman, OE i

H. Miller, RI L.Reyes,Ril

.l J. Dyer, Rlli E. Merschoff, RIV

- J. Strosnider, NRR D. Matthews, NRR Distnbution:

File Center (w/atts.) PDR (NRC/CRGR)(w/o atts.)

CRGR SF CRGR CF STreby '

JMitchell RTripathi JJohnson, OCM BSheron 1

DDambly.

JJohnson, Ril MVirgilio MFederline GWest

.j GHolahan ESullivan Treed EMurphy SLong I

RAuluck RWood BRichter ASingh D;SKlDOCUMENT NAME: S:\\CRGR\\ MINUTES 022 i

To recetve a copy of this document. Indicate in the bor 'C' = Copy w/o u. chment "E's Copy w/sttachment. "N" = No copy j

OFC CRGR

'[

C:CRk /s b

NAME RTripathi

'JAMu l

DATE 24.

2a/4" i l f

. OFFICIAL RECORD COPY j

r

~

~%..

f(Mu g

i UNITED STATES

}

NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 30856 4001 yg*

February 26, 1999 MEMORANDUM TO:

William D. Travers y

Executive Director for Operations FROM:

Joseph A. Murphy, Chairman Committee To Review Generic quir nts

SUBJECT:

MINUTES OF THE CRGR MEETING NUMBER 322 The Committee To Review Generic Requirements (CRGR) met on Friday, June 12,1998, from 9:00 am to 12:30 pm. Attachment 1 contains a list of attendees.

G. Lainas, J. Strosnider, T. Reed and E. Murphy, all of NRR, briefed the Committee on the steam generator tube integrity package consisting of a proposed generic letter and a draft regulatory guide (DG-1074). The staff's presentation materialis included in Attachment 2. The CRGR made extensive comments on the scope and contents of tM generic letter, which were addressed by the staff prior to formal CRGR review for endorsement on July 21,1999, at CRGR meeting No. 325. The minutes of that meeting, which were issued on February 26,1999, contain details.

Also at this meeting, J. Roe (NRR) presented for CRGR review and endorsement the final rule on financial assurance for decommissioning nuclear power plants. The staff's presentation material is included as Attachment 3. The CRGR had deferred the review of

!s rulemaking at the proposed rule stage. At this meeting, the Committee made minor comments and endorsed it for issuance.

In accordance with the EDO's July 18,1983 directive conceming " Feedback Lnd Closure of CRGR Review," a written response is required from the cognizant office to report agreement or disagreement with the CRGR recommendations in these minutes. The response is to be forwarded to toe CRGR Chairman and if there is disagreement with the CRGR recommendations, to the EDO for decision making.

Questions conceming these meeting minutes should be referred to Raji Tripathi (415-7584).

~ Attachments: As stated cc:

Commission (5)

SECY F. Miraglia, DEDR M. Knapp, DEDE M. Springer, ADM J. Larkins, ACRS K. Cyr, OGC H. Bell, OlG '

3. Collins, NRR A. Thade oi, NMSS C. Paperiello, NMSS J. Lieberman, OE H. Miller, R1 L. Reyes, Rll J. Dyer, Rlli E. Merschoff, RIV J. Strosnider, NRR D. Matthews, NRR i