ML20207L944

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Removing Ref to Independent Safety Engineering Group from Requirements
ML20207L944
Person / Time
Site: South Texas  
Issue date: 03/09/1999
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20207L934 List:
References
NUDOCS 9903180326
Download: ML20207L944 (4)


Text

..

- _ _. _ ~ _.,

i f

l

)

ATTACIIMENT 4 1

PROPOSED CHANGES TO THE TECIINICAL SPECIFICATIONS I

1 i

I 9903180326 900309

~

PDR ADOCK 00000498 P

ppR j

.- ~ -. - --

INDEX ADMINISTRATIVE CONTROLS SECTION PAGE 6.1 RESPONSIBILITY................................................

6-1

_6_. 2 ORGANIZATION 6.2.1 0FFSITE AND ONSITE ORGANIZATIONS............................

6-1 6.2.2 UNIT STAFF..................................................

6-1 TABLE 6.2-1 MINIMUM SHIFT CREW COMPOSITION-TWO UNITS WITH TWO SEPARATE CONTROL R00MS................................

6-4 6e2.9 ruefurenfu.e vunenrunruT carevv e nnfin / Tere %

1 et J

s eiw h u a.viere vi s erv us n. s a nwiwasvane.sier us ie riw w a g o.re.w p T %B-

f. a am..m. 4 4. m.m.

c_e

. v Pamma,444mm r_c

--r--'"

-*--'-**=' = - - * =***=******

w w D,mma,4kt144tm, c_c

-..r------

- ' = = = = = =

w w D..a.e.m.m.A.e.....................

f. _ C, 6.2.4 SHIFT TECHNICAL ADVIS0R.....................................

6-6 6.3 (Not Used) 6.4 TRAINING......................................................

6-7

6. 5 REVIEW AND AUDIT..............................................

6-7 6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC)

Function.....................'..............................

6-7 Composition................................................

6-7 A l te rn a t e s.................................................

6-7 Meeting Frequency..........................................

6-7 Quorum.....................................................

6-7 Responsibilities.........../...............................

6-8 Records....................................................

6-9 J

SOUTH TEXAS - UNITS 1 & 2 xviii Unit 1 - Amendment No. 3,4

ADMINISTRATIVE CONTROLS r

6.2.3 I!:0:P:!:0:5 5?f5TV EMI"EERIM 9"^"" '?SEC)(%%nd)

MNCTION 6.2.3.

The ISEG shall function to examine unit operating characteristics, NRC issu es, industry advisories, Licensee Event Reports, and other sources of unit des and operating experience information, including units of similar design, which indicate areas for improving unit safety. The ISEG shall make detailed rec endations for revised procedures, equipment modifications, maintenance activit operations activities, or other means of improving unit safety to the Mana r, Nuclear Safety Review Board.

COMPOSITION 6.2.3.2 The ISEG shall be compose f at least five, deMt:1, full-time engineers located on site. Each sha ave a bachelor's degret in engineering or related science and at least 2 years ofessional level expe'ience in his field, at least 1 year of which experience all be in the nucl u r field.

2 RESPONSIBILITIES 6.2.3.3 The ISEG shall be responsible for maintaining rveillance of unit activities to provide independent verification

  • that thes ctivities are performed correctly and that human errors are reduced as muc as practical.

RECORDS 6.2.3.4 Records of activities perforined by the ISEG shall be prepared, in-tained, and forwarded each calendar month to the Manager, Nuclear Safety I w

Board.

l 6.2.4 SHIFT TECHNICAL ADVISOR 4

6.2.4.1 The Shift Technical Advisor shall provide ' advisory technical support to the Shift Supervisor in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. The Shift Technical Advisor shall have a bachelor's degree or equivalent in a scientific i

or engineering discipline and shall have received specific training in the response and analysis of the unit for transients and accidents, and in unit l

design and layout, including the capabilities of instrumentation and controls in the control room.

)

6.3 (Not Used) 3 4

,\\

j

  • Not responsible for sign-off function.

i 4

1-SOUTH TEXAS - UNITS 1 & 2 6-6

I 1

1 l

I 1

ATTACHMENT 5 PROPOSED CHANGES TO THL OPERATIONS QUALITY ASSURANCE PLAN i

i l

i t

l I

i i

l i

f r

l i

j l

i i

!