Advises That Const Activities Associated W/High Head Safety Injection Recirculation Mod Will Be Completed by End of Unit 4 Outage Scheduled to Begin in Jan 1988 or as Modified by Integrated Schedule,Per IE Compliance Bulletin 86-003
ML20207L664
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/06/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
IEB-86-003, IEB-86-3, L-87-8, NUDOCS 8701120301
Download: ML20207L664 (1)


Text

P. O. BOX 14C00, JuRO BEACH, FL 33008-0420 n @ p.

JANUARY 00 1987 L-87-8 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 IE Compliance Bulletin 86-03 By Letter dated November 14,1986 (L-86-468) Florida Power & Light (FPL) committed to provide a schedule for long term resolution of the High Head Safety injection (HHSI) recirculation problem as identified'in IE Compliance Bulletin 86-03.

FPL expects to complete construction activities associated with the HHS1 recirculation modification by the end of the Unit 4 outage of 1988 (scheduled to begin in January 1988) or as modified by Integrated Schedule.

Very truly yours, l

&&0 C.o.w

(

Group Vi e President Nuclear Energy l

COWMG/gp i