C3 WASHINGTON PUBLIC POWER SUPPLY iYSTEM P.O. Box 968
- 3000 George Washington Way
- Richland. Washington 99352 October 7, 1988 G01-88-0060 Docket No. 50. 50-460 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.
20555
Subject:
NUCLEAR PROJECT NO. 1 POTENTIALLY REPORTABLE CONDITION 10CFR50.55(E)
MAIN STEAM ISOLATION VALVES ACTUATOR HYDRAULIC 4-WAY VALVES l
References:
A) Telecon T.J. Houchins (Supp.
ivstem) to l
Bill Wagner (NRC), September 988.
B) G!l-88-0163 H. L. Patterson (A..chor/ Darling) to S.M. Sandlin (Supply System), MSIV Actuator Hydralic 4-Way Valves (75 gpm), Teledyne Republic Model No. 23304-7001-2853, August 26, 1988.
In Reference A, the Supply System informed the Region V Office of a potentially reportable deficiency under 10CFR50.55(e).
The attachtnent to this letter provides a statement of the identified condition and a brief description of our planned actions to correct the, identified deficiency.
Based on the current construction delay at WNP-1, th
" System will ne' be able to issue a final report at this time.
An upda, W.. i. provided at ccsstruction restart.
I If you have any questions or desire further information, please advise.
L e,p l
G. C.<5orensen, Mgr.
Regulatory Programs (280)
GCS/GXD/llw Attachment cc: DC Leonard, UE&C (898)
E. Revell, BPA (399) pi)
JB Martin, NRC Region V l
1
!!A'Mi8"d8L'
=
ATTACHMENT TO G01-88-0060 DOCKET NO. 50-460 Potentially Reportable Condition 10CFR50.55(e)
Main Steam Isolation Valves Actuator Hydraulic 4-Way Valves
,Descriptioq of Deficiency The Supply System's WNP-1 Project utilizes four hydraulically actuated valves supplied by Anchor / Darling as the cein steam isolation valves.
Anchor /Carling rer.ently notified the Supply System that similar valves supplied to the Wolf Creek
- Flar, have encountered problems with slides cracking in the valve hydraulic actu.or 4-way valves.
This problem has been reported to the NRC by both Wolf Creek and Anchor / Darling.
Ana1ysis of Safety Isolication Failure of,io hydraulic actuator 4-way va'.ve coul/ ufect the ability of the main steam isolation valves to close and provide the required isolation.
Cause of Deficiency Af ter evaluating the problem in depth, Anchor / Darling has concluded that the cracks resalt frcm brazing / heat treating of the slide material.
The WNP-1 valves have not been operated and the Supply System has not performed an independent evaluation of the condition.
Corrective Action Anchor / Darling has provided test procedures to identify 4-way valves with ootentially cracked slides. During construction restart, the 4-way valves will be tested and the necessary repair or component replacement completed prior to placing the main steam isolation valves in service.
Action to Prevent Recurrence No further action is deemed necessary following the 4-way valve testing and completion of any necessary repair or component replacement.
l l
- ee-
~~