ML20207L188

From kanterella
Jump to navigation Jump to search
Forwards 1986 Amend to Updated Fsar,Containing New Pages for Entire FSAR Text & Figures
ML20207L188
Person / Time
Site: Fort Calhoun 
Issue date: 07/22/1986
From: Andrews R
OMAHA PUBLIC POWER DISTRICT
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20207L192 List:
References
LIC-86-351, NUDOCS 8607300218
Download: ML20207L188 (1)


Text

I Omaha Public Power District 1623 Hamey Omaha. Nebraska 68102 2247 402/536 4000 July 22, 1986 LIC-86-351 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Reference:

Docket No. 50-285

Dear Mr. Denton:

1986 Safety Analysis Report Update for Fort Calhoun Station Pursuant to 10 CFR 50.71(e), Omaha Public Power District hereby forwards the 1986 update to the the Fort Calhoun Station Unit No. 1, Updated Safety Analysis Report (USAR).

Controlled Copy 1 is being sent in hard copy form and Controlled Copies 2,3, and 5 through 11 are being forwarded as microfiche copies.

Controlled copies 4, 12, and 13 are being sent directly to their holders.

These revised pages serve to update the USAR accurate to within six (6) months of the date of this letter.

It should be noted that this year's update packages contain new pages for the entire USAR text and figures, and not just the revised pages.

Sincer y,

h/ / wv

g R. L. Andrews Division Manager Nuclear Production RLA/me Enclosures cc:without enclosures LeBoeuf, Lamb, Leiby & flacRae

}{of p

1333 New Hampshire Ave., N.W.

d,c(4 Washington, DC 20036 9

Mr. D. E. Sells, NRC Project Manager Mr. P. H. Harrell, NRC Senior Resident Inspector 8607300218 860722 PDR ADOCK 05000285 K

PDR

.is w.i impioym.m at i nenononay

..