Informs That RHR Relief Valve Setpoint Tolerance in Tech Spec 3.4.9.3.a Should Be Set at 450 Psig W/Tolerance of Plus or Minus 3% Per Low Temp Overpressure Protection Sys Analysis,In Response to Request
ML20207K932
Person / Time
Site: Seabrook  
Issue date: 07/24/1986
From: George Thomas
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To: Noonan V
Office of Nuclear Reactor Regulation
References
SBN-1169, NUDOCS 8607300128
Download: ML20207K932 (1)


Text

,..

George S. Thomas UI Vice Presxsent-Nuclem MN Ptido Service of New Hampshire Nsw Hampshire Yankee Division SBN-1169 T.F. B7.1.2 United States Nuclear Regulatory Commission Washington, DC 20555 Attention:

Mr. Vincent S. Noonan, Project Director PWR Project Directorate No. 5

References:

(a) Construction Permit CPPR-135 and CPPR-136, Docket Nos.

50-443 and 50-444.

Subj ect: Setpoint for Technical Specification 3.4.9.3.a, Overpressure Protection System

Dear Sir:

During discussions with your staff regarding the setpoint for the RHR relief valves in the subject Technical Specification, a question was raise:1 concerning the tolerance of the setpoint.

In response to the staff request, the low temperature overpressure protection analysis has been reviewed and a determination made that the bounding analysis limit for high pressure is 541 psig. Therefore, the setpoint value for the RHR relief valves in Seabrook Technical Specification 3.4.9.3.a should be set at 450 psig with a tolerance of A 3%.

Should you have any further questions regarding this matter, please contact Mr. Warren J. Hall at (603) 474-9574, extension 4046.

Very truly yours, so.

eor S.

Thomas cc: ASLB Service List 8607300128 860724 PDR ADOCK 05000443 A

PDR n.

2P' l

P.O. Box 300. Seabrook, NH 03874. Telephone (603) 474 9574 IjO i