ML20207K918
| ML20207K918 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 10/06/1988 |
| From: | Ronald Bellamy NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20207K921 | List: |
| References | |
| NUDOCS 8810170079 | |
| Download: ML20207K918 (2) | |
See also: IR 05000213/1988013
Text
.-
- _ - -
,
.:
.
OCT 0 6199
Docket No. 50-213
Connecticut Yankce Atomic Power Company
ATIN: Mr. E. J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06141
Gentlemen:
Subject:
Inspection Report No. 50-213/88-13
This refers to the routine safety inspection conducted by A. Kirkwood of this
office on August 22-26, 1988 of activities authorized by NRC License No. DPR-61
at Haddam Neck Plant, Haddam Neck, Connecticut and to the discussions of our
findings held by A. Kirkwood with E. DeBarba, and other members of your staff
at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed wi+.h this letter. Within these areas, the
inspection consisted of selective exa..inations of procedurre and representative
records, interviews with personnel, and observations by the inspector.
In addition, our Mobile Laboratory was also brought to your site and used by
the inspector to make certain independent measurements.
The basic purpose of
these independent measurements is to verify your capability for analyzing
radioactive effluents, and to achieve and maintain comparable methods of
,
analyses between your facility and the NRC.
The complete data from these
measurements will be reported in a subsequent Inspection Report.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required.
Your cooperation with us in this matter
is appreciated.
Sincerely.
Go - ? S m F,
!
L' .c:n J t .au s
j
Ronald R. Bellamy, Chief
Facilities Radiological Safety
and Safeguards Branch
88101 g og 80 M 213
Division of Radiation Safety
i
gDR
PNV
and Safeguards
'
Enclosure:
NRC Region I Inspection Report Number 50-213/88-13
0FFICIAL RECORD COPY
IR YANKEE 88-13 - 0001.0.0
10/04/88
-
,. ,
.
g
\\\\
, : =
L uu
.
i
.
Connecticut Yankee
2
Atomic Power Company
OCT 0 6 199
cc w/ encl:
0, B. Miller, Station Superintendent
D. O. Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
W. D. Romberg, Vice President, Nuclear Operations
Gerald Garfield, Esquire
Public Document Room (POR)
local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ encl:
Region 1 Docket Room (with concurrences)
Management Assistant, ORMA (w/o encl)
Section Chief, DRP
W. Raymond, SRI, Millstone 1&2
A. Wang, LPM, NRR
R. Bores, DRSS
i
il
'S
Y$'
RI:0RSS
RI:0RSS
R '1S5
Ry:
Kirkwood/mk
Pc t t an Gris
Pa s ' a k
Bellamy
9do 8
/0
88
9/h/88
fd/ h/88
0FFICIAE RECORD COPY
IR YANKEE 88-13 - 0002.0.0
09/30/88
i
J