. - ~_ - -
George S.Thomos Q
vice heuo.nsweteor hoovenon l
Putsc Service of New Hampshire i
NYN 88135 l
Nsw Hampshire Yankee Division October 6, 1988 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk References (a) Facility Operating License NPF-56. Construction Permit CPPR-136. Docket Nos. 50 443 and 50 444 (b)
PSNH Letter (NYN-88118) dated August 31, 1988
'10 CFR 50.59 Quarterly Renort,' G. S. Thomas to USNRC (c)
PSNH Letter (SBN-1240) November 24, 1986, ' Amendment 61 to the March 30, 1973 Application to Construct and Operate 1
Seabrook Station Units 1 and 2
- G. S. Thomas to V. S. Noonan l
Subject:
Future FSAR Submittals i
Gentlemen:
f New Hampshire Yankee (NHY) has programs and procedures in place to ensure that proposed changes to plant equipment or design basis documentation are reviewed for impact on the FSAR and are reviewed in accordance with 10 CPR I
l 50.59.
Whenever the FSAR is affected. FSAR changen are prepared and submitted i
for NHY technical and managerial approval.
The NHY practice regarding submittal of 10 CFR 50.59 evaluations (e.g., Reference (b ensures that the NRC is kept apprised of changes to the plant. The 10 CFR 50.59 reports include descriptions of FSAR changes which were performed in that period. l New Han. shire Yankee will submit the ' updated
- FSAR in accordance with 10 CFR 50.71 within 24 months of issuance of a low power operating license.
l Prior to sutaittal of the ' updated' FSAR. NHY intends to subctit FSAA i amendments every six months to keep the NRC Staff further apprised of FSAR l changes made after issuance of the low power license. The first of these amendments is expected to be submitted within a few months and will include changes since Amendment 61. These amendments will bring the FSAR up-to-date as of six months prior to the date of filing the amendment. 8810170047 601006 I PDR ADOCK 05000443 I P PDC P.0, Box 300. Seabrook. NH 03874. Telephone (603) 474 9574
i t United States Nuclear Regulatory Commission October 6, 1988 l Attention: Document Control Desk Page 2 l 1 Should you have any questions concerning this matter, please call f Mr. John Hart at (603) 474-9521, extension 2762. i Very truly yours f / George S. Thomas cci Mr. Villiam T. Russell Regional Administrator United States Nuclear Regulatory Commission l Region I 475 Allendale Road King of Prussia, PA 19406 l Mr. Victor Nerses. Project Manager l Project Directorate I-3 i Division of Reactor Projects J; United States Nuclear Regulatory Commission I i Washington, DC 20555 i ) Mr. David G. Ruscitto Senior Resident Inspector P. O. Box 1149 Seabrook, NH 03874 i j 4 i' J l f 1 I I i t i 1 1 I I 1 _-.}}