Docket Nos. 50-424, 50-425
License Nos. CPPR-108, CPPR-109
l
Georgia f ower Company
ATTN:Wr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
l
Gentlemen:
1
SUBJECT: NRC INSPECTION REPORT NOS. 50-424/86-110 AND 50-425/86-49
This refers to the Nuclear Regulatory Commission (NRC)_ inspection conducted by
E. H. Girard on November 3-7 and 17-21,1986.
The inspection included a review
of activities authorized for your Vogtle facility.
At the conclusion of The
inspection, the findings were discussed with those members of your staff identi-
fied in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within'these
areas, the inspection consisted of selective examinations of procedures' and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is invited to unresolved item identified in the inspection report.
This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
l
will be placed in the NRC Public Document Room.
l
Should you have any questions concerning this letter, please contact us.
Sincerely,
Thas
A
i
n.
E60e.5
bc
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
e701090449 861229
) (
ADOCK 05000424
" "
-
- .- ---
1 G O L - -
.
.
-.
,
'
Georgia Power Company
2
,[cw/ enc 1:
VJ. P. O'Reilly, Senior Vice President
/ Nuclear Operations
VR. E. Conway, Senior Vice President &
/ Project Director
_ N/D. O. Foster, Vice President, Project
Support
/P.D. Rice,VicePresident, Project
d. Engineering
H. Pinson, Vice President, Project
j Construction
J. T. Beckham, Vice President,
/ Plant Hatch
,/R. A. Thomas, Vice President,
/ Licensing
\\D. S. Read, General Manager,
Quality Assurance
. W. Hayes, Vogtle Quality
/ Assurance Manager
JW. C. Ramsey, Manager -
Readiness Review
\\ . B. Bockhold, General Manager,
f Nuclear Operations
VL. Gucwa, Manager, Nuclear Safety
/ and Licensing
VM. H. Googe, Project
M.ConstructionManager
D. Groover, Quality
Assurance Site Manager -
f onstruction
C
N4. A. Bailey, Project Licensing
Manager
. F. Trowbridge, Esq., Shaw,
d.Pittman,PottsandTrowbridge
W. Churchill, Esq., Shaw,
\\M.Pittman,PottsandTrowbridge
L. Blake, Jr. , Esq. , Shaw,
/ Pittman, Potts and Trowbridge
\\A. E. Joiner, Troutman, Sanders,
\\M.LockermanandAshmore
G. Ledbetter, Ccmmissioner,
j Department of Human Resources
'vC. H. Badger, Office of Planning
>/.andBudget
D Kirkland, III, Counsel,
Office of the Consumer's Utility
,/ Council
Y D. Feig, Georgians Against
Nuclear Energy
(cc w/ enc 1 cont'd - see page 3)
.
~
'
MC 2 S MS
Georgia' Power Company
3
c w/ enc 1 cont'd)
i
. 8. Margulies, Esq., Chairman,
l
Atomic Safety and Licensing Board
Panel
[Dr.O.H. Paris,AdministrativeJudge
Atomic Safety and Licensing Board
/ Panel
A. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
[E.Reis,OGC
cc w/ enc 1:
A.M. Hill,IE
M
.
yM Miller, NRR
l
Brach, E00
/M. Sinkule, RII
. Christnot, RII
RC Resident Inspector
Document Control Desk
State of Georgia
,
.. .
.
4
f
t
i
/
RII
Rh
RI C
RI
E rard:cdg
.e
AHerdt
MSinkule.
,
12//>/86
1
r
86
12/ /86
12/g/86
1
-
- . , _ _ -
- - - - - . . - - ,
.- ,
-_,m._
., __,_
_ - . ._.
m_
_ . - -
,